Moradabad Development Authority Tender

... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.

Moradabad Development Authority Tender

Works
Civil And Construction
Eprocure
Opening Date24 Jun 2019
Closing Date3 Jul 2019
Tender Amount₹ 13,09,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
M-150 brick work in Superstructure 1:4 (one cement and four coarse sand) including necessary cutting and moulding of brick as requried thickness of walls not to be less than one brick. SI 307(a)+309+310(a) 2017-18

13.29

-

5120

... More
M-150 brick work in Superstructure 1:4 (one cement and four coarse sand) including necessary cutting and moulding of brick and rewuried thickness of walls 115mm thick. SI 307(A)+309+310(a) 2017-18

6.5

-

5190

... More
Concrete with 2cm. Guage stone ballast cores sand of 2.2:4 P:M. and cement in proportion of 4:2:1 including supply of all meterials, labour and T&P etc. required for proper completion of work. SI No. 279-A 2017-18

6

-

6200

... More
Dismantling existing plaster including disposal of refuse as directed by the Engieer-in-charge with in a distance of 60 meter (200 feet). SI no. 706 SOR- 17-18

487

-

25

... More
12mm thick plaster with (1:4) One part of cement and Four part of approved fine sand including supply of alla material labour and completion of work . SI.No.- 584A SOR 2017-18

1198.5

-

140

... More
Finishing wall with three coat of water proof cement paint snowecem of approved make and quality of new work to give and even shade inculding priparing surface by the throughly cleaning and send preparing and supply of all material laber and t&p etc. required for proper completion of the work. SI.No.(660 + 661) SOR 2017-18

1198

-

66

... More
Cleaning jungle including up rooting of rank vegetation grass, bush, wood tree annd sopling girth up to 30 Cms measured at the hight of 1 m above groune lavel and removed of rubbish upto a distance of 50 m outside the periphery of area cleared. S.i.No -259 SOR 2017-18

3804.36

-

2.75

... More
Earth work filling including supply of all necessary quality good earth also including 8 Km. from the site of work. 2.5,2.6,2.7,2.8,2.9-86

886

-

287

... More
Rough dressing the trenched ground including breaking clods.Item No. 2.5 DSR 2018

3800

-

1.3

... More
Uprooting weeds from the trenched area after 10 to 15 days of its floodingwith water including disposal of uprooted vegetation .Item No. 2.6 DSR 2018

3800

-

4.3

... More
Fine dressing of the ground...Item No. 2.7 DSR 2018

3800

-

3.25

... More
Supplying & stacking of well decayed cattle manure at site including royalty and carriage upto 5 k. m. lead complete (cattle manure measured in stack will reduced by 8% for payment). Item No. 2.25 DSR-2018

95

-

230.45

... More
Spreading of sludge, dump manure and/or good earth in required thickness as per direction of officer-in-charge (cost of sludge, dump manure and/ or good earth to be paid separately)...Item No. 2.8 DSR 2018

380

-

46.15

... More
Mixing earth and sludge or manure in the required proportion specified or directed by the Officer-in-charge ..Item No. 2.9 DSR 2018

380

-

32.1

... More
Supply of anti termite (methgl para thian) & used as per disection in charge of the work.

380

-

25

... More
Supplying & Stacking of Selection No. 1/door grass at site fresh & free from weeds having proper roots in green including loading, unloading, carriage and all taxes paid etc. and as per direction of officer in charge. 2.35 DSR-2018

820

-

50.8

... More
Grassing with selection No. 1 grass including watering and maintenance of the lawn for 60 day or more till the grass forms a thick lawn, free from weeds and fit for mowing including supplyng good earth, if needed (the grass and good earth shall be paid for separately)..Item No. 2.10 DSR 2018

3280

-

15.55

... More
Providing and Stacking of Clerodendrum (inerme) having ht. 25 cm to 30 cm multi branched in 20 cm size of earthen pot/plastic pot & as per direction of the officer-in-charge..Item No. 6.6 DSR 2018

2385

-

10.25

... More
40 mm thick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1:5 (1 cement : 5 coarse sand), With joints finished ..Item No. 11.28.1 DSR 2018

166

-

888.95

... More
Supply and fixing benches made out 1" dia from tubler pipe 50X12 mm pipe and beautifully painted (A.R.) As per drying Attched

24

-

4100

... More
Complete maintenance of the entire garden features having as per yard stick in the garden area i.e. lawn trees, shrubs, herbs, hedge, flower beds, foliages, creepers etc. For one Year including hoeing, weeding pruning replacement of plants, gap filling, watering, mowing of lawn, grass cutting by lawn mover and brush cutter , removal of garden waste, applying insecticide, pesticide & fertilizers(whenever required) top dressing of lawn with good earth and manure and maintenance of other garden related works as directed by office-in-charge (Cost of Good Earth, Manure, Fertilizer, Insecticide , Pesticide will be provided by the Department & lawn mover and brush cutter with fuel, other T & P material / articles shall be provided by the contractor.) and as per direction of officer in charge.Item No. 2.40.5 DSR 2018

3800

-

2.25



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.