Irrigation Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Irrigation Department Tender
Civil And Construction
Irrigation Work
Eprocure
Opening Date25 Nov 2024
Closing Date30 Nov 2024
Tender Amount₹ 5,62,15,000
Costs
EMD
₹ 11,24,300Document Cost
₹ 2,354Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPIDC_974372_2Tender No
08/SE/2024-25Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://http://idup.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
1st Class Brick masonry in 1:3 CM (one part of cement and three Part of coarse sand F.M. 2.00)including cost of material, labour T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
481.75
-
-
Centering and shuttering of R.C.C. work including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
122.25
-
-
Supplying & fixing 20mm thick joint filler board including cost of material, labour T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
26.25
-
-
S/L 3mm thick multi-plast poly Plus Tar paper including cost of material, labour T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
24
-
-
Reinforcement of RCC work including cost of steel, cutting, bending, placing in position & binding with 16 gauge binding wire including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
6.68
-
-
Laying R.C.C. Slab M-20 (1:1.5:3) A-20, M-20 With cement, crushed grit size 4.75 mm to 20mm well graded including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
72.25
-
-
Laying C.C. copping M-20 (1:1.5:3) A-20, M-20 With cement, crushed grit size 4.75 mm to 20mm well graded including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
7.94
-
-
Cement pointing 1:2 C.M.on Brick Masonary including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
844.5
-
-
E/W in filling in inner section of both banks, Daula, Service road and Aproaches of Naini Dy including proper compaction in layers and dressing with all lead, lift, T&P in all type of soil as per directed by site-in-charge.
79536.5
-
-
Earth work in Correcting internal section of Naini Dy. including proper compaction in layers and dressing with all lead, lift, T&P in all type of soil as per directed by Engineer-in-Charge.
4886
-
-
Correcting internal section of Naini Dy. with earth filled new EC bags including stitching with cost of sutli, bags and filling materials with placing in position at site as per directed by Engineer-in-Charge.
22000
-
-
E/W in cutting in inner section of tail gul of Naini Dy. including proper dressing with all lead, lift, T&P in all type of soil as per directed by Engineer-in-Charge.
420
-
-
E/W Dismentaling of diversion including all lead & lift, cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
1155.25
-
-
Colour washing of two coat of parapet including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
276.5
-
-
Fixing wheel guard stone including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge..
20
-
-
Providing and Laying LDPE Film on footing box, including cost of all material, labour, T&P etc. required for proper completion of work as direction of Engineer-in-charge .
4273
-
-
Shuttering For Boundray Pillar work., including cost of all material, labour, T&P etc. required for proper completion of work as direction of Engineer-in-charge .
261
-
-
M-15 (1:2:4) PCC Foundation Concrete For Boundray Pillar work., including cost of all material, labour, T&P etc. required for proper completion of work as direction of Engineer-in-charge .
73
-
-
Fixing of RCC Precast Boundray Pillar work., including cost of all material, labour, T&P etc. required for proper completion of work as direction of Engineer-in-charge .
200
-
-
Painting of RCC Precast Boundray Pillar including cost of all material , labour , T&P etc. required for proper completion of work as direction of Engineer-in-charge
200
-
-
Writing letter on RCC Precast Boundray Pillar above 50mm but below 80mmincluding cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
360
-
-
Dry brick on edge soling , including all cost of material, labour and T&P etc. required for proper completion of the work as direction of Engineer-in-charge.
10431
-
-
Providing and fixing of 150 mm dia HDPE rigid pressure pipe 6 kg/m2 including cost of all material and labour T&P etc per direction of Engineer-in-Charge.
580
-
-
Preparation of Sub-grade for Lining excluding cost of earth work.
3751.5
-
-
Supply and laying 100 mm thick local sand below in foundation C.C. including cost of all materials labour T&P etc per direction of Engineer-in-Charge.
647.5
-
-
Cut stone Masonary with 1:3 C.M. including cost of material labour T&P etc per direction of Engineer-in-Charge per direction of Engineer-in-Charge.
2338.25
-
-
20 mm deep struck cement pointing on stone masonary with 1:2 C. M including cost of all materials, labours T&P etc per direction of Engineer-in-Charge.
1303.5
-
-