Irrigation Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Irrigation Department Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date12 Aug 2024
Closing Date24 Aug 2024
Tender Amount₹ 32,70,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and Laying C.C. M-20(1:1.5:3mix) with cement, coarse sand &10mm. to 20mm.Size stone grit.including cost of all material,labour,T&P complete.

90.43

-

-

... More
Providing and laying R.C.C 1:1:2 with coarse sand & aggregate of size 10 to 25 mm including mechanical mixing and all cost of material,labour and T&P etc. But excluding cost of steel reinforcement.

128.28

-

-

... More
Centering and shuttering for R.C.C. work including all cost of material, labour and T&P etc. for completion of work

266.41

-

-

... More
Centering and shuttering for C.C. work including all cost of material, labour and T&P etc. for completion of work

269.25

-

-

... More
Steel reinforcement with bending, binding, cutting and placing of reinforcement including cost of binding wire with all cost of material, labour and T&P etc. for completion of work.

10.44

-

-

... More
Earth work for making & removal of diversion & Bundha up to 100 m. including Cost of all labour and T&P etc as per instruction of Engineer-in-Charge .

320.51

-

-

... More
Earth Work in Cutting/Filling in all type of soil including ramming & dressuing to the required level and slope and as per instruction of Engineer-in-Charge.

36.24

-

-

... More
S/F 75 mm dia P V C Pipe for weep holes.

3.6

-

-

... More
S/F Fixing Marble Name Plate of Size 300 x 200 x 25 mm including cost of all labour and T&P etc. Complete as per instruction of Engineer-in-Charge .

1

-

-

... More
S/Fixing Marble B.M. Plate of Size 150 x 150 x 25 mm including cost of all labour and T&P etc. Complete as per instruction of Engineer-in-Charge .

1

-

-

... More
Finishing walls (one coat ) with water proof cement paint of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt including cost of all materials, labour T&P etc. complete required foe proper completion of work.

49.46

-

-

... More
Finishing walls (Two coat ) with exterior emulsion paint (Apex) of approved brand and manufacture and of required shade on undacrated wall surface to give even shade@ 1.25 ltr/10sqm including one coat of primer applied @ 0.75 ltr/sqm, including cost of all materials, labour T&P etc. complete required foe proper completion of work.

49.46

-

-

... More
Making and fixing sign board at site of work as per instruction of Engineer-in-Charge .

1

-

-

... More
S/F tarfelt on bed block as per directon of engineer in charge .

3.9

-

-

... More
Filling expansion Joint with joint with 20 mm thick Tharmacoal as per directon of engineer in charge .

17.3

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.