Irrigation Department Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Irrigation Department Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date29 Feb 2024
Closing Date6 Mar 2024
Tender Amount₹ 29,10,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Laying C.C.(1:3:6) with coarse sand (FM2)and Shankargarh stone ballast 20mm to 40 mm in size including cost of all material, labour, T&P etc. required for proper completion of work.

159.15

-

-

... More
C.R.Stone masonry in 1:3 cement sand mortar including cost of all material for proper completion of work.

217.31

-

-

... More
Laying C.C.M-15(1:2:4) one part cement two part coarse sand of FM2 and four part A- 20 graded stone grit for C.C. Blocks including cost of all material, labour, T&P etc. required for proper completion of work. as per direction of Engineer-in-Charge.

28.18

-

-

... More
Supplying and laying Dala Stone Grit 10-20mm. for inverted filter including all type of materials, labour, T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.

5.53

-

-

... More
Supplying and laying Shankargarh Stone Balast 20-40mm.for inverted filter including all type of materials, labour ,T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.

5.53

-

-

... More
Supplying and laying coarse sand FM2 for inverted filter including all type of materials, labour ,T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.

12.9

-

-

... More
Cement pointing 1:2 struck deep with medium sand including all type of materials, labour ,T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.

762.12

-

-

... More
Laying C.C.(1:1.5:3) one part cement , 1.5 part coarse sand, three part A- 20 graded stone grit including all type of materials, labour ,T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.

16.39

-

-

... More
Centering and shuttering of precast C.C. work with all labour, T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.

359.03

-

-

... More
Centering and shuttering of C.C. work over crest wall with all labour, T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.

21.88

-

-

... More
Laying precast C.C. block (450x450x225mm.) in D/S Canal Section including cost of materials, labour ,T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.

119.68

-

-

... More
S/F 100 mm.dia PVC Pipe in weep hole in retaining wall and crest including cost of materials, labour ,T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.

17.2

-

-

... More
E/W filling for maintenance and to strengthen Daula and Bank by all type of soil with lead , lift and proper compaction including farmer’s compensation ,cost of labour, T&P etc. required for proper manual compaction of work as per direction of Engineer-in-charge.

326

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.