Irrigation Department Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Irrigation Department Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date12 Sep 2024
Closing Date25 Sep 2024
Tender Amount₹ 2,16,07,000
Costs
EMD
₹ 4,32,000Document Cost
₹ 2,715Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPIDC_954780_1Bid Award Id
ViewTender No
01/SE/2024-25Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://http://idup.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Earth work in cutting or in embankment in ordinary soil, excavation to be in the form of regular pits and earth work in embankment to be in 20 cm. layers, including ramming and dressing the surface to the required levels and slopes and also including all lift and lead. The earth from cutting to be used in making embankment or to be deposited as spoil bank withen 30 m distance as directed by Engineer in charge & also including labour & T&P etc. complete.
11.48
-
-
Laying C.C.(1:3:6) with Cement, coarse sand and Stone ballast 20 to 40mm as & also including all cost of material, labour & T&P etc. complete of all work as directed by Engineer in charge.
70.22
-
-
Laying C.C.(1:1.5:3) with Cement, coarse sand and Stone grit 6 to 12 mm size & also including all cost of material, labour & T&P etc. complete of all work as directed by Engineer in charge.
81.78
-
-
Class 10 brick work in 1:5 cement and sand mortar with all lift and lead of material including cost of all labour, material and T&P etc. All requirede for Proper Completion of Work as per Directed by Enginer-In-Charge.
34.27
-
-
Cement Plaster in 1:4 on Brick masonary with cement sand mortar with all lift and lead of material including cost of all labour, material and T&P etc. All requirede for Proper Completion of Work as per Directed by Enginer-In-Charge.
326.83
-
-
First class/M-150 Brick flooring laid Brick on edge over 12 mm thick mortar bed 1:4 Cement mortar including preparation of base to proper slope and its ramming and including supply of all materials, labour and T&P etc. required for proper completion of the Work as per Directed by Engineer In Charge.
616
-
-
First class/M-150 Brick flooring laid flat over 12 mm thick mortar bed 1:4 Cement mortar including preparation of base to proper slope and its ramming and including supply of all materials, labour and T&P etc. required for proper completion of the Work as per Directed by Engineer In Charge.
99.88
-
-
Cement pointing in 1:3 (Struck deep) on Brick masonary with cement sand mortar with all lift and lead of material including cost of all labour, material and T&P etc. All requirede for Proper Completion of Work as per Directed by Enginer-In-Charge.
188.39
-
-
Finishing walls with Acrylic smooth exterior paint applied two coat of approved make of required shade on old surface directed by Enginer-In-Charge to give even shade after throughly brushing the surface to remove all dirt and remains of loose powdered material including cost of materials labour Tools and Plants etc for proper completion of work.
2032.75
-
-
Earth work in embankment by power tranported earth with all lead and lift including excavation, loading, unloading, manual compaction, dressing complete including cost of all material, labour and T&P etc. excluding royalty will be applicable from time to time on Govt. orders. All complete as per direction of Engineer in charge.
20382.55
-
-
Brick soling with brick laid on edge straight over burnt bricks laid flat and dry including prepration of sub-grade to prescribed camber and including supply of bricks, filling joints with local earth, spreading blinding coat of 1cm(3/8") depth of local earth of P.I. 5to7 or sand over the entire surface and including labour and T&P etc. required for proper completions of the work.
24000
-
-
Providing & Dumping boulder 20 to 40 kg. in scoured portion. also including all cost of material, labour & T&P etc. complete of all work as directed by Engineer in charge.
866.64
-
-
Providing and fixing Shuttering for C.C.blocks and C.C casting work including cost of shuttering, all cost of material, labour & T&P etc. complete of all work as directed by Engineer in charge.
14.4
-
-
Painting two coat after 1st coat on perviously painted old surface on steel and other metal surface including cleaning the surface of all dirt, dust and other foreign matter, sand pappering and stopping including cost of materials labour Tools and Plants etc as required for proper completion of work. Paint shall be used as per standard I.S. specification.
1613.35
-
-
Painting on old rusted steel surface of gates and appurtenances after preparation of surface properly by sand blasting process and applying two coat of Zinc Rich primer and two coat of solvent less epoxy paint including cost of all material, labour T&P and scaffolding required for proper completion of work.
108.06
-
-