Directorate Of Urban Local Bodies Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Directorate Of Urban Local Bodies Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date8 Mar 2024
Closing Date18 Mar 2024
Tender Amount₹ 8,40,396 
Notes
Download

Costs

Summary

Construction Of Cc Road Adn Nali Work In Ward No 2

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
12mm thick plastere in 1:4 mortar drain one part of cement and fourpatr approved F/sand including supply of all metrials, labour, and T&P etc.required for proper complection of work .S.I.No 584 But Excluding G.S.T

184

34960

190

... More
Cement concrete with 2cm guage approved stone GRIT coarse sand and cement in proportion of 4:2:1 including supply of all materials, labour, and T&P etc. required for peoper completion of work. S.I.No.(279)a But

2.53

16951

6700

... More
Construction of granular sub-base by providing wall graded materil,spreading in uniform layers with motor grader/tractor mounted appropriate equiment on prepared surface,mixing by mix in plae method with rotctor at omc and compaction with smooth mord specifiation 401.but excluding gst

60

187122

3118.7

... More
Cement concrete with 2 cm guage apprvoed stone grit coarse sand & cement in proportion of 1:1:5:3 in pavemen 10 cm /as per design thick for c.c road coarse & fine aggregate confirming to IS Standard mixed in concrete mixture/Plant of not less than 0.2 cum capacity & appropriate weight batcher using approved mixed design, laid in approved fixed form work (Steel Channel) laying and fixing of 125 micron thick polythene film, wedges, steel plates including leveling the form work spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including hassion cloth for curring of concrete pavements for not less than 14 days curring compound (where as specified) and water finishing to lines & grade including supply of all material, labour, tools and plants etc required for proper completion of work and also including complete shifting of material & concrete etc.S.I.No.780(3) But Excluding G.S.T

34.2

251370

7350

... More
R.c.c.work with cement approved coaese sand and 2cm. Guage approved stone grit in poportion of 1:1:5:3 in column excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I Binding wire and including necessary centring and shuttering etc. Binding wire of supplied by the contractor free of cost. (S.I.No 289) But Excluding G.S.T

0.62

4650

7500

... More
Mild steel or iron work in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to reuired shape as necessary including bending for proper complection of the work and including supply of all steel, boalts.nuts and wastag etc. and there fix( S.I.No 504) But Excluding G.S.T

0.48

3936

8200

... More
S/f of m.s jal with cutting welding and reveting all complete

1

6000

6000

... More
18 % GST

1

128196

128196



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.