Dakshinanchal Vidyut Vitran Nigam Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Dakshinanchal Vidyut Vitran Nigam Limited - DVVNL Tender

Works
Civil And Construction
Electrical and Electronics
Electrical Works
Eprocure
Opening Date22 Nov 2024
Closing Date27 Nov 2024
Tender Amount₹ 10,00,000 
Notes
Download

Costs

Summary

Full Deposite Work Under Edd Jasrana

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Conductor, GI earthwire, cross arm, angle, channel, insulator other line material.

160

-

-

... More
11 KV Cubical Box 15/5 Amp.

4

-

-

... More
16 KVA transformer

4

-

-

... More
25 KVA transformer

12

-

-

... More
63 KVA transformer

12

-

-

... More
11 KV XLPE cable 3x70 mm / 3 x 120 mm/3x185/3x300 mm

400

-

-

... More
Drilling of hole in channel, angle.

1920

-

-

... More
Painting of dropper channel, top channel, T channel and guarding angle with 2 quote of Red Oxide including the cost of paint.

120

-

-

... More
Safe placement of 8.5/9 meter long PCC pole/ 11/13 meter long ST pole from dump site to the pit site of work including the work of dragging of the same through Kachha Pakka road.

140

-

-

... More
Erection and grouting of double pole structure of 8.5/9 meter long PCC pole including fixing of HT fittings as per RESPO norms. The support shall be grouted in cement, sand, and brick ballast in ratio 1:2:4.

20

-

-

... More
Erection of Single support of 8.5/9 meter long PCC pole including fixing of HT/LT fittings as per RESPO norms. The support shall be grouted in cement, sand, and brick ballast.

90

-

-

... More
Erection of single support of 11/13 meter long ST pole duly grouted in cement, sand and brick ballast in ratio 1:4:8 including fixing of all HT fittings

20

-

-

... More
Erection of double pole structure of 11/13 meter long ST pole duly grouted in cement, sand and brick ballast in ratio 1:4:8 including fixing of all HT fittings.

4

-

-

... More
Construction of plinth of aforesaid newly erected 11/13 meter long ST pole as per RESPO norms in CC 1:2:4 ratio in cement, sand and stone grit duly 12 mm thick plaster in 1:4 ratio of cement and sand to give strengthening.

20

-

-

... More
Grouting, fixing and nozzling of stay rod, and grouting of stay rod shall be in ratio 1:4:8 [Cement, sand and brick ballast], as per RESPO norm,

60

-

-

... More
Earthing of HT support through earthing rod & and connecting it properly as per RESPO norms.

150

-

-

... More
Chopping of tree branches for clearance of line

60

-

-

... More
Installation of Extra “T” as per RESPO manual

40

-

-

... More
Installation of following capacity transformer in proper alignment and direction as per RESPO manual including the cost of arrangement of labourer, T&P etc required for proper completion of work.

-

-

-

... More
16 KVA transformer

4

-

-

... More
25 KVA transformer

12

-

-

... More
63 KVA transformer

12

-

-

... More
Digging, laying and back filling 3x70 / 3x120 / 3x185/ 3x300 mm XLPE cable trench as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of bricks, sand, labourer, T&P etc. required for proper completion of work.

200

-

-

... More
Installation material Contractor arrange by own his coast Installation of following line material in proper alignment and direction as per RESPO manual, including the cost fo arrangement of labourer, T&P etc. required for proper completion of work for the supervising engineer.

-

-

-

... More
11 KV cross arm holding clamp with nut & bolt

80

-

-

... More
11 KV U clamp with nut & bolt

80

-

-

... More
11 KV F clamp with nut & bolt

120

-

-

... More
Laying of 3x70 / 3x120 / 3x185 / 3x300 sqmm. XLPE cable in open and its making connection with transformer and 11 KV feeder also as per direction of supervising engineer.

200

-

-

... More
Laying, stringing, sagging, binding and jumpering etc of weasel conductor as per RESPO norms.

14000

-

-

... More
Laying of Ariel bunch conductor cable of size 3x50 sqr. mm/ 3x95sqr mm

1000

-

-

... More
Laying, stringing, sagging, binding and jumpering etc of dog conductor as per RESPO norms.

1000

-

-

... More
Guarding of 11 KV line.

1000

-

-

... More
Installation of Distribution box as per RESPO manual and as per direction of supervising engineer.

20

-

-

... More
Fixing of TPMO fuse set on newly erected transformers.

20

-

-

... More
Installation of 11 KV Cubical Box 15/5 Amp.

4

-

-

... More
Filling and fixing of cable box suitable for XLPE cable, including the cost of arrangement of labourer, T&P etc. required for proper completion of work, but the box shall be provided by the corporation free of cost, as per actual sit requirement.

16

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.