Dakshinanchal Vidyut Vitran Nigam Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Dakshinanchal Vidyut Vitran Nigam Limited - DVVNL Tender
Eprocure
Opening Date3 Dec 2024
Closing Date12 Dec 2024
Tender AmountRefer Documents
Costs
EMD
₹ 15,000Document Cost
₹ 3,540Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DVVNL_979468_1Tender No
65/EDCE/2024-25Tender Authority
Dakshinanchal Vidyut Vitran Nigam Limited ViewPurchaser Address
-Website
http://https://www.dvvnl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
ACSR Weasel Conductor
7000
-
-
ACSR Dog Conductor
3800
-
-
Arial Bunched Cable Different Size
1400
-
-
11 KV XLPE Cable Different Size
700
-
-
25/63/100 KVA Distribution Transformer
10
-
-
250 KVA Distribution Transformer
1
-
-
CT/ PT Pole Mounting Unit Sutaible Size
2
-
-
11 KV Pilfer Proof Metering Cubical Sutaible Size
2
-
-
Erection & fabrication of following supports including fitting of all required accessories of HT/LT line complete the work in all respect as per RESPO Schedule. It including the cost of all labour, T&P etc. required for proper completion of work.
-
-
-
Erection of single support by 11/13 Mtrs. long ST pole including fixing complete HT/LT fittings as per RESSPO Munual including the cost of labour, T&P and carrier etc. required for proper completion of work.
10
-
-
Erection of single support by 9/8.5 Mtrs. long PCC pole including fixing complete HT/LT fittings as per RESSPO Munual including the cost of labour, T&P and carrier etc. required for proper completion of work.
80
-
-
Grouting of single support 11/13 Mtrs. long ST / 9/8.5 Mtrs. long PCC pole as per RESSPO Manual including of the cost of labour, T&P and carrier etc. required for proper completion of work. The support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc.
110
-
-
Erection & grouting of double pole including fixing complete HT/LT fitting as per RESSPO Manual including the cost of labour, T&P and carrier etc. required for proper completion of work. The support shall be grouted with cement, sand & brick ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast etc.
10
-
-
Laying, sagging, stringing, binding & jumpering of ACSR Weasel Conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work.
7000
-
-
Laying, sagging, stringing, binding & jumpering of Dog conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work.
3800
-
-
Laying spreading, lifting and final sagging of Aerial Bunched Cable (all size). including fixing of all accessories as per RESSPO Manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work. :
1400
-
-
Erection and grouting of stay set including the work of nozzling etc. as per RESPO manual and also including the cost of arrangement of all grouting material, labour, T&P etc. required for proper completion of work as per RESSPO Manual.
35
-
-
Fixing & connecting of earthing rods as per RESSPO Manual including the cost of labour, T&P etc. required for proper completion of work.
110
-
-
Supply & Fixing of LT Distribution box including making connections of distribution box with LT mains by piercing clamps for Arial Bunched Cable.The work will also include the opening of the service connection of the consumer and its connecting in distribution box.
12
-
-
25/63/100 KVA Distribution Transformer mounting on Double pole/placement on plinth including proper jumpering from 11 KV line to the transformer and also connecting the LT site cables as per RESSPO Manual.
10
-
-
250 KVA Distribution Transformer placement on plinth including proper jumpering from 11 KV line to the transformer and also connecting the LT site cables as per RESSPO Manual.
1
-
-
Neutral & Body earthing of Distribution Transformer by drilling/boring a hole of size 200 mm dia and 3000mm long in depth and then inserting the Gel earthing electrodes of size 50mm dia and 3000 mm long inside the pit then mix the back fill compound nicely with the soil and re-filling the empty space around the earthing electrode including making of chamber at the top of the earthing as per direction of supervising engineer.
1
-
-
Construction of plinth at various 11/0.4 KV Sub-station suitable for distribution transformer having size 2x2x1.5 mtr. out which 2’ below the ground. Work will include digging of foundation 2’ deep & brick work with Ist class bricks having cement and sand mortar of ratio 1:6 on all the walls, each of 9” thickness. The plinth shall be plastered with 12mm thick plaster in ratio 1:4 at all sides. This work will include cost of labour, T&P and all material required for construction of plinth which shall be provided by the contractor as per RESSPO Norms.
1
-
-
Supply & Fixing of T-Off Channel as per RESSPO Norms.
13
-
-
Supply & Fixing of Top Channel as per RESSPO Norms.
10
-
-
Supply & Fixing of Dropper Channel as per RESSPO Norms.
10
-
-
Supply & Fixing of T/F Base Channel/Angle as per RESSPO Norms.
8
-
-
Supply & Fixing of Nuts, Bolts & Washer.
220
-
-
Supply & Fixing of all type Clmaps
270
-
-
Laying of 11 KV XLPE Cable. including making proper connections at both ends. The work includes the cost of labour, T&P and carrier etc. required for proper completion of work.
700
-
-
Providing 11 KV Cable Jointing kit (O/D & I/D) for sutaible size for proper completion of work and its Filling as per RESSPO Norms.
6
-
-
Gurading of 11 KV line by laying two nos. GI wire paraller and fixing of lacings (tilli) at a distance at 2-3 Mtrs. As per RESPO Norms and also including the cost of arrangement of labour, T&P etc required for proper completion of work.
20
-
-
Safe carriage of CT/ PT Pole Mounting Unit and its proper installation on double poole after fixing of channel with M.S. clamps and nuts & bolts for holding the channel angle etc. The unit body shall be earthed by connecting M.S. Strip of sutaible size finally connected to earthing rod. 11 KV line shall be connected to unit as per instructions of SDO / AE(M). The M.S. Strip & earth rod shall be included in the scope of work.
2
-
-
Safe carriage of 11 KV Pilfer Proof Metering Cubical sutaible size and its proper installation at pit site as per RESSPO Manuals
2
-
-