Dakshinanchal Vidyut Vitran Nigam Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Dakshinanchal Vidyut Vitran Nigam Limited - DVVNL Tender

Works
Electrical Generators And Transformers
Electrical and Electronics
Eprocure
Opening Date6 Feb 2024
Closing Date12 Feb 2024
Tender Amount₹ 50,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor). Shifting and keeping the assembled core and coils etc. In OVEN from the repairing and assembly place.

400

-

-

... More
Cleaning of tank in cleaning yard. Repairing of burst body & radiator properly with welding including repairing of bended base channel. Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality. (Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost.

400

-

-

... More
Dragging out clean empty tank from yard to repairing hall. Taking out assembled core and coils assembly from the "OVEN" after proper magger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.). Retanking of complete assembly into painted tank and Proper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality, Fitting of all accessories of the transformer including fixing of pressure release valve/bend pipe for fixing of silica gel breather and filling of oil in transformer after check of BDV as per norms. (Bend Pipe wiil be arranged by the contractor at his own cost.). Tightening of top cover plate of repaired Transformer by using nut, bolts and washers or Welding with proper gasket sheet. Punching of unique no. on MS plate 100x50x3 mm. size & Welding of MS Plate on Transformer Body containing following information:- Uniqe Number, Capacity (MS Plate & Punching Machine shall be provided by cotractor).

400

-

-

... More
Painting of T/F outside with super enemal synthetic paint in two coats after de-rusting and providing primer of red oxide paint etc.(color should be decided by EE WS) Paint & Painting Material shall be arranged by the contractor. Painting of 02 No. 50 mm. wide Green/Yelow/Orange/Red strip & writing name of workshop and ^^fo|qr lEcU/kh f'kdk;r gsrq Vksy Qzh ua0 1912 ij lEidZ djsaa**] Dragging of repaired T/F upto the test cabin /testing place and making full arrangement for the testing of transformer and their re-dragging to yard and its stacking at indentified place.

400

-

-

... More
Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor).

400

-

-

... More
25 KVA THREE PHASE Alu. Wound (WORKSHOP ORAI (JALAUN)) -Dragging, Shifting, Handling of DamageTransformer from stacking yard to Dismentling area. Draining of Oil into pit/drum. Opening of top cover plate by T&P or cutting of sealed Transformer top cover plate by chisel Hammer Process, taking out the core and coil assembly from the tank. Removal of Old layers (Multilayers) of Top Cover Plate by welding/gas cutting after taking out the Tank at safe area. Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations if required (Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor).

1800

-

-

... More
Making of L.V. Coils as per original design/design approved by concern JE/AE (Using eigther new coil or reconditioning old coil as per technical conditions of old coil).

1800

-

-

... More
Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE (Using eigther new coil or reconditioning old coil as per technical conditions of old coil).

1800

-

-

... More
Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor). Shifting and keeping the assembled core and coils etc. In OVEN from the repairing and assembly place.

1800

-

-

... More
Cleaning of tank in cleaning yard. Repairing of burst body & radiator properly with welding including repairing of bended base channel. Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality. (Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost.

1800

-

-

... More
Dragging out clean empty tank from yard to repairing hall. Taking out assembled core and coils assembly from the "OVEN" after proper magger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.). Retanking of complete assembly into painted tank and Proper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality, Fitting of all accessories of the transformer including fixing of pressure release valve/bend pipe for fixing of silica gel breather and filling of oil in transformer after check of BDV as per norms. (Bend Pipe wiil be arranged by the contractor at his own cost.). Tightening of top cover plate of repaired Transformer by using nut, bolts and washers or Welding with proper gasket sheet. Punching of unique no. on MS plate 100x50x3 mm. size & Welding of MS Plate on Transformer Body containing following information:- Uniqe Number, Capacity (MS Plate & Punching Machine shall be provided by cotractor).

1800

-

-

... More
Painting of T/F outside with super enemal synthetic paint in two coats after de-rusting and providing primer of red oxide paint etc.(color should be decided by EE WS) Paint & Painting Material shall be arranged by the contractor. Painting of 02 No. 50 mm. wide Green/Yelow/Orange/Red strip & writing name of workshop and ^^fo|qr lEcU/kh f'kdk;r gsrq Vksy Qzh ua0 1912 ij lEidZ djsaa**] Dragging of repaired T/F upto the test cabin /testing place and making full arrangement for the testing of transformer and their re-dragging to yard and its stacking at indentified place.

1800

-

-

... More
Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor).

1800

-

-

... More
63 KVA THREE PHASE Alu. Wound (WORKSHOP ORAI (JALAUN)) -Dragging, Shifting, Handling of DamageTransformer from stacking yard to Dismentling area. Draining of Oil into pit/drum. Opening of top cover plate by T&P or cutting of sealed Transformer top cover plate by chisel Hammer Process, taking out the core and coil assembly from the tank. Removal of Old layers (Multilayers) of Top Cover Plate by welding/gas cutting after taking out the Tank at safe area. Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations if required (Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor).

600

-

-

... More
Making of L.V. Coils as per original design/design approved by concern JE/AE (Using eigther new coil or reconditioning old coil as per technical conditions of old coil).

600

-

-

... More
Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE (Using eigther new coil or reconditioning old coil as per technical conditions of old coil).

600

-

-

... More
Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor). Shifting and keeping the assembled core and coils etc. In OVEN from the repairing and assembly place.

600

-

-

... More
Cleaning of tank in cleaning yard. Repairing of burst body & radiator properly with welding including repairing of bended base channel. Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality. (Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost.

600

-

-

... More
Dragging out clean empty tank from yard to repairing hall. Taking out assembled core and coils assembly from the "OVEN" after proper magger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.). Retanking of complete assembly into painted tank and Proper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality, Fitting of all accessories of the transformer including fixing of pressure release valve/bend pipe for fixing of silica gel breather and filling of oil in transformer after check of BDV as per norms. (Bend Pipe wiil be arranged by the contractor at his own cost.). Tightening of top cover plate of repaired Transformer by using nut, bolts and washers or Welding with proper gasket sheet. Punching of unique no. on MS plate 100x50x3 mm. size & Welding of MS Plate on Transformer Body containing following information:- Uniqe Number, Capacity (MS Plate & Punching Machine shall be provided by cotractor).

600

-

-

... More
Painting of T/F outside with super enemal synthetic paint in two coats after de-rusting and providing primer of red oxide paint etc.(color should be decided by EE WS) Paint & Painting Material shall be arranged by the contractor. Painting of 02 No. 50 mm. wide Green/Yelow/Orange/Red strip & writing name of workshop and ^^fo|qr lEcU/kh f'kdk;r gsrq Vksy Qzh ua0 1912 ij lEidZ djsaa**] Dragging of repaired T/F upto the test cabin /testing place and making full arrangement for the testing of transformer and their re-dragging to yard and its stacking at indentified place.

600

-

-

... More
Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor).

600

-

-

... More
100 KVA THREE PHASE Alu./Cu. Wound (WORKSHOP ORAI (JALAUN)) -Dragging, Shifting, Handling of DamageTransformer from stacking yard to Dismentling area. Draining of Oil into pit/drum. Opening of top cover plate by T&P or cutting of sealed Transformer top cover plate by chisel Hammer Process, taking out the core and coil assembly from the tank. Removal of Old layers (Multilayers) of Top Cover Plate by welding/gas cutting after taking out the Tank at safe area. Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations if required (Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor).

400

-

-

... More
Making of L.V. Coils as per original design/design approved by concern JE/AE (Using eigther new coil or reconditioning old coil as per technical conditions of old coil).

400

-

-

... More
Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE (Using eigther new coil or reconditioning old coil as per technical conditions of old coil).

400

-

-

... More
Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor). Shifting and keeping the assembled core and coils etc. In OVEN from the repairing and assembly place.

400

-

-

... More
Cleaning of tank in cleaning yard. Repairing of burst body & radiator properly with welding including repairing of bended base channel. Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality. (Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost.

400

-

-

... More
Dragging out clean empty tank from yard to repairing hall. Taking out assembled core and coils assembly from the "OVEN" after proper magger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.). Retanking of complete assembly into painted tank and Proper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality, Fitting of all accessories of the transformer including fixing of pressure release valve/bend pipe for fixing of silica gel breather and filling of oil in transformer after check of BDV as per norms. (Bend Pipe wiil be arranged by the contractor at his own cost.). Tightening of top cover plate of repaired Transformer by using nut, bolts and washers or Welding with proper gasket sheet. Punching of unique no. on MS plate 100x50x3 mm. size & Welding of MS Plate on Transformer Body containing following information:- Uniqe Number, Capacity (MS Plate & Punching Machine shall be provided by cotractor).

400

-

-

... More
Painting of T/F outside with super enemal synthetic paint in two coats after de-rusting and providing primer of red oxide paint etc.(color should be decided by EE WS) Paint & Painting Material shall be arranged by the contractor. Painting of 02 No. 50 mm. wide Green/Yelow/Orange/Red strip & writing name of workshop and ^^fo|qr lEcU/kh f'kdk;r gsrq Vksy Qzh ua0 1912 ij lEidZ djsaa**] Dragging of repaired T/F upto the test cabin /testing place and making full arrangement for the testing of transformer and their re-dragging to yard and its stacking at indentified place.

400

-

-

... More
Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor).

400

-

-

... More
160 KVA THREE PHASE Alu. Wound (WORKSHOP ORAI (JALAUN)) -Dragging, Shifting, Handling of DamageTransformer from stacking yard to Dismentling area. Draining of Oil into pit/drum. Opening of top cover plate by T&P or cutting of sealed Transformer top cover plate by chisel Hammer Process, taking out the core and coil assembly from the tank. Removal of Old layers (Multilayers) of Top Cover Plate by welding/gas cutting after taking out the Tank at safe area. Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations if required (Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor).

20

-

-

... More
Making of L.V. Coils as per original design/design approved by concern JE/AE (Using eigther new coil or reconditioning old coil as per technical conditions of old coil).

20

-

-

... More
Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE (Using eigther new coil or reconditioning old coil as per technical conditions of old coil).

20

-

-

... More
Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor). Shifting and keeping the assembled core and coils etc. In OVEN from the repairing and assembly place.

20

-

-

... More
Cleaning of tank in cleaning yard. Repairing of burst body & radiator properly with welding including repairing of bended base channel. Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality. (Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost.

20

-

-

... More
Dragging out clean empty tank from yard to repairing hall. Taking out assembled core and coils assembly from the "OVEN" after proper magger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.). Retanking of complete assembly into painted tank and Proper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality, Fitting of all accessories of the transformer including fixing of pressure release valve/bend pipe for fixing of silica gel breather and filling of oil in transformer after check of BDV as per norms. (Bend Pipe wiil be arranged by the contractor at his own cost.). Tightening of top cover plate of repaired Transformer by using nut, bolts and washers or Welding with proper gasket sheet. Punching of unique no. on MS plate 100x50x3 mm. size & Welding of MS Plate on Transformer Body containing following information:- Uniqe Number, Capacity (MS Plate & Punching Machine shall be provided by cotractor).

20

-

-

... More
Painting of T/F outside with super enemal synthetic paint in two coats after de-rusting and providing primer of red oxide paint etc.(color should be decided by EE WS) Paint & Painting Material shall be arranged by the contractor. Painting of 02 No. 50 mm. wide Green/Yelow/Orange/Red strip & writing name of workshop and ^^fo|qr lEcU/kh f'kdk;r gsrq Vksy Qzh ua0 1912 ij lEidZ djsaa**] Dragging of repaired T/F upto the test cabin /testing place and making full arrangement for the testing of transformer and their re-dragging to yard and its stacking at indentified place.

20

-

-

... More
Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor).

20

-

-

... More
250 KVA THREE PHASE Alu./Cu. Wound (WORKSHOP ORAI (JALAUN)) -Dragging, Shifting, Handling of DamageTransformer from stacking yard to Dismentling area. Draining of Oil into pit/drum. Opening of top cover plate by T&P or cutting of sealed Transformer top cover plate by chisel Hammer Process, taking out the core and coil assembly from the tank. Removal of Old layers (Multilayers) of Top Cover Plate by welding/gas cutting after taking out the Tank at safe area. Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations if required (Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor).

60

-

-

... More
Making of L.V. Coils as per original design/design approved by concern JE/AE (Using eigther new coil or reconditioning old coil as per technical conditions of old coil).

60

-

-

... More
Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE (Using eigther new coil or reconditioning old coil as per technical conditions of old coil).

60

-

-

... More
Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor). Shifting and keeping the assembled core and coils etc. In OVEN from the repairing and assembly place.

60

-

-

... More
Cleaning of tank in cleaning yard. Repairing of burst body & radiator properly with welding including repairing of bended base channel. Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality. (Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost.

60

-

-

... More
Dragging out clean empty tank from yard to repairing hall. Taking out assembled core and coils assembly from the "OVEN" after proper magger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.). Retanking of complete assembly into painted tank and Proper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality, Fitting of all accessories of the transformer including fixing of pressure release valve/bend pipe for fixing of silica gel breather and filling of oil in transformer after check of BDV as per norms. (Bend Pipe wiil be arranged by the contractor at his own cost.). Tightening of top cover plate of repaired Transformer by using nut, bolts and washers or Welding with proper gasket sheet. Punching of unique no. on MS plate 100x50x3 mm. size & Welding of MS Plate on Transformer Body containing following information:- Uniqe Number, Capacity (MS Plate & Punching Machine shall be provided by cotractor).

60

-

-

... More
Painting of T/F outside with super enemal synthetic paint in two coats after de-rusting and providing primer of red oxide paint etc.(color should be decided by EE WS) Paint & Painting Material shall be arranged by the contractor. Painting of 02 No. 50 mm. wide Green/Yelow/Orange/Red strip & writing name of workshop and ^^fo|qr lEcU/kh f'kdk;r gsrq Vksy Qzh ua0 1912 ij lEidZ djsaa**] Dragging of repaired T/F upto the test cabin /testing place and making full arrangement for the testing of transformer and their re-dragging to yard and its stacking at indentified place.

60

-

-

... More
Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor).

60

-

-

... More
400 KVA THREE PHASE Cu. Wound (WORKSHOP ORAI (JALAUN)) -Dragging, Shifting, Handling of DamageTransformer from stacking yard to Dismentling area. Draining of Oil into pit/drum. Opening of top cover plate by T&P or cutting of sealed Transformer top cover plate by chisel Hammer Process, taking out the core and coil assembly from the tank. Removal of Old layers (Multilayers) of Top Cover Plate by welding/gas cutting after taking out the Tank at safe area. Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations if required (Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor).

80

-

-

... More
Making of L.V. Coils as per original design/design approved by concern JE/AE (Using eigther new coil or reconditioning old coil as per technical conditions of old coil).

80

-

-

... More
Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE (Using eigther new coil or reconditioning old coil as per technical conditions of old coil).

80

-

-

... More
Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor). Shifting and keeping the assembled core and coils etc. In OVEN from the repairing and assembly place.

80

-

-

... More
Cleaning of tank in cleaning yard. Repairing of burst body & radiator properly with welding including repairing of bended base channel. Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality. (Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost.

80

-

-

... More
Dragging out clean empty tank from yard to repairing hall. Taking out assembled core and coils assembly from the "OVEN" after proper magger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.). Retanking of complete assembly into painted tank and Proper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality, Fitting of all accessories of the transformer including fixing of pressure release valve/bend pipe for fixing of silica gel breather and filling of oil in transformer after check of BDV as per norms. (Bend Pipe wiil be arranged by the contractor at his own cost.). Tightening of top cover plate of repaired Transformer by using nut, bolts and washers or Welding with proper gasket sheet. Punching of unique no. on MS plate 100x50x3 mm. size & Welding of MS Plate on Transformer Body containing following information:- Uniqe Number, Capacity (MS Plate & Punching Machine shall be provided by cotractor).

80

-

-

... More
Painting of T/F outside with super enemal synthetic paint in two coats after de-rusting and providing primer of red oxide paint etc.(color should be decided by EE WS) Paint & Painting Material shall be arranged by the contractor. Painting of 02 No. 50 mm. wide Green/Yelow/Orange/Red strip & writing name of workshop and ^^fo|qr lEcU/kh f'kdk;r gsrq Vksy Qzh ua0 1912 ij lEidZ djsaa**] Dragging of repaired T/F upto the test cabin /testing place and making full arrangement for the testing of transformer and their re-dragging to yard and its stacking at indentified place.

80

-

-

... More
Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor).

80

-

-

... More
630 KVA THREE PHASE Cu. Wound (WORKSHOP ORAI (JALAUN)) -Dragging, Shifting, Handling of DamageTransformer from stacking yard to Dismentling area. Draining of Oil into pit/drum. Opening of top cover plate by T&P or cutting of sealed Transformer top cover plate by chisel Hammer Process, taking out the core and coil assembly from the tank. Removal of Old layers (Multilayers) of Top Cover Plate by welding/gas cutting after taking out the Tank at safe area. Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations if required (Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor).

10

-

-

... More
Making of L.V. Coils as per original design/design approved by concern JE/AE (Using eigther new coil or reconditioning old coil as per technical conditions of old coil).

10

-

-

... More
Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE (Using eigther new coil or reconditioning old coil as per technical conditions of old coil).

10

-

-

... More
Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor). Shifting and keeping the assembled core and coils etc. In OVEN from the repairing and assembly place.

10

-

-

... More
Cleaning of tank in cleaning yard. Repairing of burst body & radiator properly with welding including repairing of bended base channel. Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality. (Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost.

10

-

-

... More
Dragging out clean empty tank from yard to repairing hall. Taking out assembled core and coils assembly from the "OVEN" after proper magger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.). Retanking of complete assembly into painted tank and Proper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality, Fitting of all accessories of the transformer including fixing of pressure release valve/bend pipe for fixing of silica gel breather and filling of oil in transformer after check of BDV as per norms. (Bend Pipe wiil be arranged by the contractor at his own cost.). Tightening of top cover plate of repaired Transformer by using nut, bolts and washers or Welding with proper gasket sheet. Punching of unique no. on MS plate 100x50x3 mm. size & Welding of MS Plate on Transformer Body containing following information:- Uniqe Number, Capacity (MS Plate & Punching Machine shall be provided by cotractor).

10

-

-

... More
Painting of T/F outside with super enemal synthetic paint in two coats after de-rusting and providing primer of red oxide paint etc.(color should be decided by EE WS) Paint & Painting Material shall be arranged by the contractor. Painting of 02 No. 50 mm. wide Green/Yelow/Orange/Red strip & writing name of workshop and ^^fo|qr lEcU/kh f'kdk;r gsrq Vksy Qzh ua0 1912 ij lEidZ djsaa**] Dragging of repaired T/F upto the test cabin /testing place and making full arrangement for the testing of transformer and their re-dragging to yard and its stacking at indentified place.

10

-

-

... More
Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor).

10

-

-

... More
1000 KVA THREE PHASE Cu. Wound (WORKSHOP ORAI (JALAUN)) -Dragging, Shifting, Handling of DamageTransformer from stacking yard to Dismentling area. Draining of Oil into pit/drum. Opening of top cover plate by T&P or cutting of sealed Transformer top cover plate by chisel Hammer Process, taking out the core and coil assembly from the tank. Removal of Old layers (Multilayers) of Top Cover Plate by welding/gas cutting after taking out the Tank at safe area. Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations if required (Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor).

4

-

-

... More
Making of L.V. Coils as per original design/design approved by concern JE/AE (Using eigther new coil or reconditioning old coil as per technical conditions of old coil).

4

-

-

... More
Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE (Using eigther new coil or reconditioning old coil as per technical conditions of old coil).

4

-

-

... More
Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor). Shifting and keeping the assembled core and coils etc. In OVEN from the repairing and assembly place.

4

-

-

... More
Cleaning of tank in cleaning yard. Repairing of burst body & radiator properly with welding including repairing of bended base channel. Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality. (Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost.

4

-

-

... More
Dragging out clean empty tank from yard to repairing hall. Taking out assembled core and coils assembly from the "OVEN" after proper magger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.). Retanking of complete assembly into painted tank and Proper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality, Fitting of all accessories of the transformer including fixing of pressure release valve/bend pipe for fixing of silica gel breather and filling of oil in transformer after check of BDV as per norms. (Bend Pipe wiil be arranged by the contractor at his own cost.). Tightening of top cover plate of repaired Transformer by using nut, bolts and washers or Welding with proper gasket sheet. Punching of unique no. on MS plate 100x50x3 mm. size & Welding of MS Plate on Transformer Body containing following information:- Uniqe Number, Capacity (MS Plate & Punching Machine shall be provided by cotractor).

4

-

-

... More
Painting of T/F outside with super enemal synthetic paint in two coats after de-rusting and providing primer of red oxide paint etc.(color should be decided by EE WS) Paint & Painting Material shall be arranged by the contractor. Painting of 02 No. 50 mm. wide Green/Yelow/Orange/Red strip & writing name of workshop and ^^fo|qr lEcU/kh f'kdk;r gsrq Vksy Qzh ua0 1912 ij lEidZ djsaa**] Dragging of repaired T/F upto the test cabin /testing place and making full arrangement for the testing of transformer and their re-dragging to yard and its stacking at indentified place.

4

-

-

... More
Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor).

4

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.