If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Dakshinanchal Vidyut Vitran Nigam Limited - DVVNL Tender
Eprocure
Opening Date26 Oct 2024
Closing Date4 Nov 2024
Tender AmountRefer Documents
Costs
EMD
₹ 26,000Document Cost
₹ 5,900Tender Fee
Refer Documents
Summary
Edch-72/2024-25
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DVVNL_968982_1Bid Award Id
ViewTender No
EDCH-72/2024-25Tender Authority
Dakshinanchal Vidyut Vitran Nigam Limited ViewPurchaser Address
-Website
http://https://www.dvvnl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
F-Braket
27
-
-
Clamp for Tee Channel
22
-
-
Earthing Complete
104
-
-
D/Pole Clamp
38
-
-
AL LUG 400 sqmm
36
-
-
I-Hook
8
-
-
Bolt & Nuts
10
-
-
LT Clamp with Bolt & Nut
16
-
-
Pearcing Connector
76
-
-
L.T Distribution Box 3-Phase
52
-
-
Clamp for Distribution Box
104
-
-
Suspension Clamp
39
-
-
Dead End Clamp
23
-
-
Holding Clamp
112
-
-
M.s Top Channel
19
-
-
Dropper Channel
19
-
-
MS Angle T/F base With Clamp
38
-
-
Fuse Set
19
-
-
Scope of work
-
-
-
Safe Carriage of following material from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour, T&P, etc. which required for proper completion of work.(Distance 00-50 Kms.)
-
-
-
Pcc Pole 8.5 Mtr. Long
60
-
-
STP Pole 11 Mtr. Long
16
-
-
11 KV Steel Cross Arm V Type
45
-
-
11 KV Pin Insulator With Pin
143
-
-
11 KV Disc Insulator With Fitting
132
-
-
H.T Tee Channel
22
-
-
ACSR weasel Conductor
4542
-
-
Stay set Complete
46
-
-
25 KVA 11/0.4 KV T/F
5
-
-
63 KVA 11/0.4 KV T/F
11
-
-
100 KVA 11/0.4 KV T/F
3
-
-
LT XLPE/PVC Cable 3.5x70 Sqmm
112
-
-
LT XLPE/PVC Cable 3.5x150 Sqmm
90
-
-
XLPE Cable 3x70 sqmm
610
-
-
Cable Jointing Kit Suitable for XLPE Cable 3x70 sqmm
2
-
-
11 KV TPMO with Polymer Insualator
19
-
-
T/F 11/.04 Kv, 250 KVA New
9
-
-
LT XLPE/PVC Cable AL 3.5*400 sqmm
135
-
-
MS Channel
4
-
-
Arreal Bunch Conductor 3x120 sqmm
1552
-
-
Arreal Bunch Conductor 3x95 sqmm
160
-
-
Errection of following Poles with grouting including Cutting of kharanja/mettalic road/concrete portion while digging pit & complete H.T./L.T. fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
-
-
-
Pcc Pole 8.5 Mtr. Long
60
-
-
STP Pole 11 Mtr. Long
16
-
-
Fixing/ Errection of following item, cost of labor, material and T&P which required for completion of work
-
-
-
11 KV Steel Cross Arm V Type with Clamp
45
-
-
11 KV Pin Insulator With Pin
143
-
-
11 KV Disc Insulator With Fitting
132
-
-
Stone Pad
76
-
-
Cable Jointing Kit Suitable for XLPE Cable 3x70 sqmm
2
-
-
H.T Tee Channel with Clamp
22
-
-
M.S Channel
4
-
-
F-Braket
27
-
-
D/Pole Clamp
38
-
-
AL LUG 400 sqmm
36
-
-
I-Hook
8
-
-
Bolt & Nuts
10
-
-
LT Clamp with Bolt & Nut
16
-
-
M.s Top Channel
19
-
-
Dropper Channel
19
-
-
Pearcing Connector
76
-
-
Holding Clamp
112
-
-
L.T Distribution Box 3-Phase with Clamp
52
-
-
MS Angle T/F base With Clamp
38
-
-
11 KV Fuse Set
19
-
-
11 KV TPMO with Polymer Insualator
19
-
-
Suspension Clamp
39
-
-
Dead End Clamp
23
-
-
Installation of following T/F on newly constructed double pole in proper alignment direction & making HT/LT connection.
-
-
-
25 KVA 11/0.4 KV T/F
5
-
-
63 KVA 11/0.4 KV T/F
11
-
-
100 KVA 11/0.4 KV T/F
3
-
-
Installation of 250 KVA T/F on newly/Old constructed Plinth in proper alignment direction & making HT/LT connection all Cost of labour and T&P which required for completion of work
9
-
-
Safe Dismenteling of old and used following T/F from Double Pole with opening of all HT/LT Jumpers, all works which required for dismentling of T/F.
-
-
-
10/16 KVA T/F
5
-
-
100 KVA T/F
9
-
-
Errection and grouting of stays as per RESPO Norms and as per direction of supervising engineer. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.
46
-
-
Fixing of earthing rod as per RESPO Norms and as per direction of supervising engineer.
104
-
-
Laying, sagging and stringing and jumpering / binding etc. of new & old ACSR Weasal conductor / GI in 11 KV / LT lines as per RESPO manual and as per direction of supervising engineer.
-
-
-
ACSR weasel Conductor
4542
-
-
LT XLPE/PVC Cable 3.5x70 Sqmm
112
-
-
LT XLPE/PVC Cable 3.5x150 Sqmm
90
-
-
XLPE Cable 3x70 sqmm
610
-
-
LT XLPE/PVC Cable AL 3.5*400 sqmm
135
-
-
Arreal Bunch Conductor 3x120 mm
1552
-
-
Arreal Bunch Conductor 3x95 mm
160
-
-
Construction of plinth of size 5' * 5 * 4' above ground level one ft below the ground level of 9" After Exavation of 4 "earth brick ballast shall be provided and rammering will be done properly After ballast shall be provided and rammering will be done properly After that a retaining wall 9"width by fist class brick in ratio 1:4 of cement & sand shall be made . The earth shall be filled up to one ft.below the top of the plinth After this brick ballast shall be provided upto 6"from the earth level and proper rammering shall be done one No. jall of 12 mm MS tor shall be fixed in the hollow of plinth and one ft. thick RCC in ratio of cement sand & stone ballast shall be laid on the top of the plinth. The 12 mm thick plastering shall be done all round the plinth in 1:4 ratio of cement and sand.
9
-
-
Pipe earthing of 250 KVA medium Power Transformers
18
-
-
Net Fencing Shall be 1150*1200 mm made of 35*35 mm MS Angle covered by expended netal 14 SWG up to full Height 1200 mm duly steftened by MS flat by an 8 SWG dia bolt & nut
9
-
-
Re Guarding / Guarding of 11 KV line by laying, stringing, sagging and binding of 2 Nos. parallel GI wire 6 SWG after providing, fabrication and fixing of guarding angle and fabrication and fixing of X-guards (Tillis) of GI wire at distance of 3 Mtr.
10
-
-
Earthing of power T/F (Body & Neutral)
20
-
-
Back Cartage of Following Matarial and carriage it up to Store Hathras/ J.E Store all cost of labour and T&P which required for completion of work
-
-
-
10/16 KVA T/F
5
-
-
LT PVC Cable
60
-
-
100 KVA T/F
9
-
-
Evaluation Notes How It Works ?