Dakshinanchal Vidyut Vitran Nigam Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Dakshinanchal Vidyut Vitran Nigam Limited - DVVNL Tender
Eprocure
Opening Date29 Nov 2018
Closing Date17 Dec 2018
Tender Amount₹ 9,00,000
Costs
EMD
₹ 9,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_DVVNL_278067_1Bid Award Id
ViewTender No
125/EDC(M)/2018-19Tender Authority
Dakshinanchal Vidyut Vitran Nigam Limited ViewPurchaser Address
-Website
http://https://www.dvvnl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Carriage of Line material i.e. conductor, G.I. wire TPMO stay rod, disc insulator, cross arm, Angle channel and other required material from Store Center at 132 KV substation Mathura to the site of work including loading and unloading of material at both ends.
40
-
-
Replacement of 8.5 Mtrs. Long damaged PCC pole by opening of all existing accessories and conductor from damaged pole properly and removal of damaged pole and erect the new pole at same place including fixing of all existing accessories and conductor on the new pole etc. as per direction of supervising engineer. It including the cost of all labour, T&P etc. (including carriage of damaged pole to other place) required for proper completion of work.
74
-
-
Replacement of 9 Mtrs. Long damaged PCC pole by opening of all existing accessories and conductor from damaged pole properly and removal of damaged pole and erect the new pole at same place including fixing of all existing accessories and conductor on the new pole etc. as per direction of supervising engineer. It including the cost of all labour, T&P etc. (including carriage of damaged pole to other place) required for proper completion of work.
6
-
-
Replacement of 9/11 Mtrs. Long damaged ST pole by opening of all existing accessories and conductor from damaged pole properly and removal of damaged pole and erect the new pole at same place including fixing of all existing accessories and conductor on the new pole etc. as per direction of supervising engineer. It including the cost of all labour, T&P etc. (including carriage of damaged pole to other place) required for proper completion of work.
12
-
-
Erection of single pole structure on 8.5 Mtrs long PCC Pole including fitting of all relevant accessories as per RESPO norms.
20
-
-
Erection of single pole structure on 9 Mtrs long PCC Pole including fitting of all relevant accessories as per RESPO norms.
5
-
-
Erection of single pole structure on 9/11 Mtrs long ST Pole including fitting of all relevant accessories as per RESPO norms.
5
-
-
Dismantling of existing damaged Double Pole structure on 8.5/9/11 Mtrs. long PCC/ST pole by opening all relevant accessories.
4
-
-
Erection of Double pole structure on 8.5 Mtrs. long PCC pole by digging of pits. Opening and fitting of all relevant accessories as per RESPO norms.
6
-
-
Erection of Double pole structure on 09 Mtrs. long PCC pole by digging of pits. Opening and fitting of all relevant accessories as per RESPO norms.
2
-
-
Erection of Double pole structure on 9/11 Mtrs. long ST pole by digging of pits. Opening and fitting of all relevant accessories as per RESPO norms.
2
-
-
Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work.
8
-
-
Installation of stay set with grouting and Nuzzling etc. as per RESPO drawing /norms along with all routine material to be used for such works.
9
-
-
Removal of ACSR Weasel conductor existing conductor from damaged line/Pole including opening of jumpers etc as per requirement of site and as per direction of Supervising Engineer.
20000
-
-
Removal of ACSR Dog/Raccon conductor existing conductor from damaged line/Pole including opening of jumpers etc as per requirement of site and as per direction of Supervising Engineer.
6000
-
-
Removal of Arial Bunch Conductor 3x50 sq mm. existing conductor from damaged line/Pole including opening of jumpers etc as per requirement of site and as per direction of Supervising Engineer.
4000
-
-
Removal of Arial Bunch Conductor 3x95 sq mm. existing conductor from damaged line/Pole including opening of jumpers etc as per requirement of site and as per direction of Supervising Engineer.
3000
-
-
Laying, sagging and stringing and jumpering / binding etc. of new & old ACSR Weasel conductor in 11 KV/ LT lines as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work
20000
-
-
Laying, sagging and stringing and jumpering / binding etc. of new & old ACSR Dog/Raccon conductor in 11 KV/33KV lines as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work
6000
-
-
Laying, sagging and stringing and jumpering / binding etc. of new & old Arial Bunch Conductor 3x50 sq mm. in LT lines as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work
4000
-
-
Laying, sagging and stringing and jumpering / binding etc. of new & old Arial Bunch Conductor 3x95 sq mm. in LT lines as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work
3000
-
-
Re-sagging of loose 11 KV./L.T. line as per direction of supervising engineer. It includes the cost of labour, T&P etc required for proper completion of work.
20
-
-
Re-nuzzling of old stay set by opening old binding for better straightening of pole and re-sag the existing conductor of H.T/L.T line properly as per direction of supervising engineer.
14
-
-
Construction of T pole/ Section pole for LT Line on the erected/new pole as per RESPO manual and as per direction of supervising engineer. It including the cost of all labor, T&P & Grouting etc. required for proper completion of work
4
-
-
Construction of T pole/ Section pole for 11 KV Line on the erected/new pole as per RESPO manual and as per direction of supervising engineer. It including the cost of all labor, T&P & Grouting etc. required for proper completion of work
3
-
-
Chopping of Tree branches to Clear the line route to give 02 meter horizontal and vertical clearance to the line including cost of labour T&P etc.
80
-
-
Dismantling of 25/63/100 KVA Transformer erected on the Single Pole/Double pole/Plinth structures and removal consumers connections thereof.
2
-
-
Mounting of 25/63/100 KVA Transformer on the Single Pole/Double pole/Plinth structures and connections thereof.
2
-
-
Straightening of 8.5/9 Mtr. Long PCC/ST/Rail Pole tilted pole at various places by straightening of pole including the cost of labour ,T&P charges required for proper completion of work.
15
-
-
Carriage of 11 KV XLPE Cable size 3x70/3x120 sq.mm. form Store Center Mathura/Agra including cost of shifting of drum from inside of store, removing of cable from drum and re-rolling of extra removed cable including loading & unloading at both ends.
80
-
-
Carriage of 11 KV XLPE Cable size 3x185/3x300 sq.mm. form Store Center Mathura/Agra including cost of shifting of drum from inside of store, removing of cable from drum and re-rolling of extra removed cable including loading & unloading at both ends.
80
-
-
Dismentling/Removal of damaged 11 KV XLPE Cable size 3x70/3x120 sq.mm. from existing 11/33 KV line double poles and trench after digging.
80
-
-
Dismentling/Removal of damaged 11 KV XLPE Cable size 3x185/3x300 sq.mm. from existing 11/33 KV line double poles and trench after digging.
80
-
-
Laying of various size 11 KV XLPE Cable size 3x70/3x120 sq.mm. in the trench/G.I pipe/HDPE pipe and re-dressing of trench after laying of XLPE Cable for proper completion of work as per direction of supervising engineer.
80
-
-
Laying of various size 11 KV XLPE Cable size 3x185/3x300 sq.mm. in the trench/G.I pipe/HDPE pipe and re-dressing of trench after laying of XLPE Cable for proper completion of work as per direction of supervising engineer.
80
-
-
Fixing of 11 KV Cable Jointing Kit 3x120/3x185 sq.mm outdoor/indoor including removal of insulation, semi-conductor of the cable end and filling of cable box complete work (including fixing of cable box in the cubical meter box) as per direction of supervising engineer.
6
-
-
Fixing of 11 KV Straight Through suitable for 3x120/3x185 sq.mm outdoor/indoor including removal of insulation, semi-conductor of the cable end and filling of cable box complete work (including fixing of cable box in the cubical meter box) as per direction of supervising engineer.
2
-
-
Dismentling/Removal of damaged 11 KV Guarding from existing line. The work includes cost of labour, T&P etc.
10
-
-
Guarding of 11 KV line by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 mtrs. as per direction of supervising engineer/RESPO manual. It includes the cost o f labour T&P carriage etc required for proper completion.
10
-
-