Dakshinanchal Vidyut Vitran Nigam Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Dakshinanchal Vidyut Vitran Nigam Limited - DVVNL Tender

Works
Eprocure
Opening Date29 Nov 2018
Closing Date17 Dec 2018
Tender Amount₹ 9,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Carriage of Line material i.e. conductor, G.I. wire TPMO stay rod, disc insulator, cross arm, Angle channel and other required material from Store Center at 132 KV substation Mathura to the site of work including loading and unloading of material at both ends.

40

-

-

... More
Replacement of 8.5 Mtrs. Long damaged PCC pole by opening of all existing accessories and conductor from damaged pole properly and removal of damaged pole and erect the new pole at same place including fixing of all existing accessories and conductor on the new pole etc. as per direction of supervising engineer. It including the cost of all labour, T&P etc. (including carriage of damaged pole to other place) required for proper completion of work.

74

-

-

... More
Replacement of 9 Mtrs. Long damaged PCC pole by opening of all existing accessories and conductor from damaged pole properly and removal of damaged pole and erect the new pole at same place including fixing of all existing accessories and conductor on the new pole etc. as per direction of supervising engineer. It including the cost of all labour, T&P etc. (including carriage of damaged pole to other place) required for proper completion of work.

6

-

-

... More
Replacement of 9/11 Mtrs. Long damaged ST pole by opening of all existing accessories and conductor from damaged pole properly and removal of damaged pole and erect the new pole at same place including fixing of all existing accessories and conductor on the new pole etc. as per direction of supervising engineer. It including the cost of all labour, T&P etc. (including carriage of damaged pole to other place) required for proper completion of work.

12

-

-

... More
Erection of single pole structure on 8.5 Mtrs long PCC Pole including fitting of all relevant accessories as per RESPO norms.

20

-

-

... More
Erection of single pole structure on 9 Mtrs long PCC Pole including fitting of all relevant accessories as per RESPO norms.

5

-

-

... More
Erection of single pole structure on 9/11 Mtrs long ST Pole including fitting of all relevant accessories as per RESPO norms.

5

-

-

... More
Dismantling of existing damaged Double Pole structure on 8.5/9/11 Mtrs. long PCC/ST pole by opening all relevant accessories.

4

-

-

... More
Erection of Double pole structure on 8.5 Mtrs. long PCC pole by digging of pits. Opening and fitting of all relevant accessories as per RESPO norms.

6

-

-

... More
Erection of Double pole structure on 09 Mtrs. long PCC pole by digging of pits. Opening and fitting of all relevant accessories as per RESPO norms.

2

-

-

... More
Erection of Double pole structure on 9/11 Mtrs. long ST pole by digging of pits. Opening and fitting of all relevant accessories as per RESPO norms.

2

-

-

... More
Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work.

8

-

-

... More
Installation of stay set with grouting and Nuzzling etc. as per RESPO drawing /norms along with all routine material to be used for such works.

9

-

-

... More
Removal of ACSR Weasel conductor existing conductor from damaged line/Pole including opening of jumpers etc as per requirement of site and as per direction of Supervising Engineer.

20000

-

-

... More
Removal of ACSR Dog/Raccon conductor existing conductor from damaged line/Pole including opening of jumpers etc as per requirement of site and as per direction of Supervising Engineer.

6000

-

-

... More
Removal of Arial Bunch Conductor 3x50 sq mm. existing conductor from damaged line/Pole including opening of jumpers etc as per requirement of site and as per direction of Supervising Engineer.

4000

-

-

... More
Removal of Arial Bunch Conductor 3x95 sq mm. existing conductor from damaged line/Pole including opening of jumpers etc as per requirement of site and as per direction of Supervising Engineer.

3000

-

-

... More
Laying, sagging and stringing and jumpering / binding etc. of new & old ACSR Weasel conductor in 11 KV/ LT lines as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work

20000

-

-

... More
Laying, sagging and stringing and jumpering / binding etc. of new & old ACSR Dog/Raccon conductor in 11 KV/33KV lines as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work

6000

-

-

... More
Laying, sagging and stringing and jumpering / binding etc. of new & old Arial Bunch Conductor 3x50 sq mm. in LT lines as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work

4000

-

-

... More
Laying, sagging and stringing and jumpering / binding etc. of new & old Arial Bunch Conductor 3x95 sq mm. in LT lines as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work

3000

-

-

... More
Re-sagging of loose 11 KV./L.T. line as per direction of supervising engineer. It includes the cost of labour, T&P etc required for proper completion of work.

20

-

-

... More
Re-nuzzling of old stay set by opening old binding for better straightening of pole and re-sag the existing conductor of H.T/L.T line properly as per direction of supervising engineer.

14

-

-

... More
Construction of T pole/ Section pole for LT Line on the erected/new pole as per RESPO manual and as per direction of supervising engineer. It including the cost of all labor, T&P & Grouting etc. required for proper completion of work

4

-

-

... More
Construction of T pole/ Section pole for 11 KV Line on the erected/new pole as per RESPO manual and as per direction of supervising engineer. It including the cost of all labor, T&P & Grouting etc. required for proper completion of work

3

-

-

... More
Chopping of Tree branches to Clear the line route to give 02 meter horizontal and vertical clearance to the line including cost of labour T&P etc.

80

-

-

... More
Dismantling of 25/63/100 KVA Transformer erected on the Single Pole/Double pole/Plinth structures and removal consumers connections thereof.

2

-

-

... More
Mounting of 25/63/100 KVA Transformer on the Single Pole/Double pole/Plinth structures and connections thereof.

2

-

-

... More
Straightening of 8.5/9 Mtr. Long PCC/ST/Rail Pole tilted pole at various places by straightening of pole including the cost of labour ,T&P charges required for proper completion of work.

15

-

-

... More
Carriage of 11 KV XLPE Cable size 3x70/3x120 sq.mm. form Store Center Mathura/Agra including cost of shifting of drum from inside of store, removing of cable from drum and re-rolling of extra removed cable including loading & unloading at both ends.

80

-

-

... More
Carriage of 11 KV XLPE Cable size 3x185/3x300 sq.mm. form Store Center Mathura/Agra including cost of shifting of drum from inside of store, removing of cable from drum and re-rolling of extra removed cable including loading & unloading at both ends.

80

-

-

... More
Dismentling/Removal of damaged 11 KV XLPE Cable size 3x70/3x120 sq.mm. from existing 11/33 KV line double poles and trench after digging.

80

-

-

... More
Dismentling/Removal of damaged 11 KV XLPE Cable size 3x185/3x300 sq.mm. from existing 11/33 KV line double poles and trench after digging.

80

-

-

... More
Laying of various size 11 KV XLPE Cable size 3x70/3x120 sq.mm. in the trench/G.I pipe/HDPE pipe and re-dressing of trench after laying of XLPE Cable for proper completion of work as per direction of supervising engineer.

80

-

-

... More
Laying of various size 11 KV XLPE Cable size 3x185/3x300 sq.mm. in the trench/G.I pipe/HDPE pipe and re-dressing of trench after laying of XLPE Cable for proper completion of work as per direction of supervising engineer.

80

-

-

... More
Fixing of 11 KV Cable Jointing Kit 3x120/3x185 sq.mm outdoor/indoor including removal of insulation, semi-conductor of the cable end and filling of cable box complete work (including fixing of cable box in the cubical meter box) as per direction of supervising engineer.

6

-

-

... More
Fixing of 11 KV Straight Through suitable for 3x120/3x185 sq.mm outdoor/indoor including removal of insulation, semi-conductor of the cable end and filling of cable box complete work (including fixing of cable box in the cubical meter box) as per direction of supervising engineer.

2

-

-

... More
Dismentling/Removal of damaged 11 KV Guarding from existing line. The work includes cost of labour, T&P etc.

10

-

-

... More
Guarding of 11 KV line by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 mtrs. as per direction of supervising engineer/RESPO manual. It includes the cost o f labour T&P carriage etc required for proper completion.

10

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.