For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Transmission Corporation Of Andhra Pradesh Limited - APTRANSCO Tender
Civil And Construction
Civil Works Others
Electrical Generators And Transformers
Electrical and Electronics
Opening Date15 May 2023
Closing Date31 May 2023
Tender Amount₹ 7,85,235
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
417093Bid Award Id
ViewTender No
EMWT8-2023-24Tender Authority
Transmission Corporation Of Andhra Pradesh Limited ViewPurchaser Address
-Website
http://https://www.tstransco.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
EMWT 8 2023 24;TRANSPORTATION OF MATERIAL/ EQUIPMENT/ SCRAP FROM ONE SITE TO ANOTHER SITE PER LORRY LOAD. (Transportation of material from erragadda stores hyd to 220KV SSgarkurnool)
3
11138
33415.2
... More
EMWT 8 2023 24;WRITING LETTERS IN CONTROL ROOM PANELS, LETTERING ON PANELS, MARSHALLING BOXES ETC.... A)Works under SD
30
122
3665.4
... More
EMWT 8 2023 24;Excavation of earth pit, putting cast iron pipe with flange on one end (as per ISS7181/86) of nominal dia 125mm and 2.75 meters long in side the pit including supply and Fixing RCC collars 0.75 meter dia (OD), 50mm thick and 0.60meters long in side the pit, backfill the pit in the 25mm size granules of BHcoke for full depth of the pit with alternate layers of BH coke and salt of 300mm thick around the earth pipe of 150mm on all the sides of the pipe including cost and conveyance of BH coke, salt, clamps, C.I.Pipes and RCC collars, labour charges for all operational and incidental items of work etc., complete. 220 and 132kV A)Works under SD
7
18092
126646.94
... More
EMWT 8 2023 24;Setting of stubs with stub setting template for sub-station structure:Erection of stub template, Fixing of jacks for supporting the template, alignment and leveling of exact location of stubs of stubSetting template, dismantling of template after completion of initial curing of CC 33kV towers and CPL's A)Works under SD
3
939
2818.14
... More
EMWT 8 2023 24;Laying of earth mat including Excavation of trenches, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes as per Drg. No.SET(P)/149/82 with the followingsizes of MS Flats / GI Flats.(for 220kV and 132kV) including fabrication. 220 and 132kV 75x 8mm MS Flat / GI Flat. (Laying of 75X8mm GI flat) A)Works under SD
25
112
2816.75
... More
EMWT 8 2023 24;Laying of earth mat including Excavation of trenches, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes as per Drg. No.SET(P)/149/82 with the following sizes of MS Flats / GI Flats.(for 220kV and 132kV) including fabrication. 220 and 132kV 75x 8mm MS Flat / GI Flat. (Laying of 75x8mm MS flat) A)Works under SD
25
112
2816.75
... More
EMWT 8 2023 24;Laying of earth mat including Excavation of trenches, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes as per Drg. No.SET(P)/149/82 with the following sizes of MS Flats / GI Flats.(for 220kV and 132kV) including fabrication. 220 and 132kV 100x16mm MS Flat / GI Flat. (Laying of 100x16mm MS Flat) A)Works under SD
80
125
10028.8
... More
EMWT 8 2023 24;Laying of earth mat including Excavation of trenches, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes as per Drg. No.SET(P)/149/82 with the following sizes of MS Flats / GI Flats.(for 220kV and 132kV) including fabrication. 220 and 132kV 100x16mm MS Flat / GI Flat. (LAying of 100x16mm GI Flat) A)Works under SD
100
125
12536
... More
EMWT 8 2023 24;Erection of Marshalling boxes 220 and 132kV A)Works under SD
1
588
588.69
... More
EMWT 8 2023 24;Fixing of 105lb rail poles over the transformer plinths. 220 and 132kV A)Works under SD
11
944
10385.43
... More
EMWT 8 2023 24;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 33 kv Lightning Arrestors. A)Works under SD
3
823
2470.59
... More
EMWT 8 2023 24;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 33 kv Solid Core Insulators A)Works under SD
6
290
1742.34
... More
EMWT 8 2023 24;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 33 kv Isolators including solid core insulators Erection, alignment in full shape for smooth operation. A)Works under SD
1
2637
2637.23
... More
EMWT 8 2023 24;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 132 kv Lightning Arrestors. A)Works under SD
3
2107
6321.69
... More
EMWT 8 2023 24;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 33 kv Current Tranformers. A)Works under SD
3
1378
4136.73
... More
EMWT 8 2023 24;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 132 kv Current Tranformers.A)Works under SD
3
4463
13390.8
... More
EMWT 8 2023 24;Fixing of 90lb rail poles over the transformer plinths. 220 and 132kV (Dismantling of 90 lbs rail pole over transformer plinth) A)Works under SD
5.5
605
3331.68
... More
EMWT 8 2023 24;Erection of the Main and auxiliary structures etc., using bolts and nuts. 220 and 132kV A)Works under SD
1.6
4058
6494.35
... More
EMWT 8 2023 24;DISMANTLING OF 33KV ISOLATORS (Dismantling of 33KV Isolaters Including Solid core Insulators) A)Works under SD
1
1977
1977.92
... More
EMWT 8 2023 24;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 33 kv Lightning Arrestors.(Dismantling of 33KV LAs) A)Works under SD
3
617
1852.98
... More
EMWT 8 2023 24;Dismantling of 33KV CT's (Dismantling of 33KV CT) A)Works under SD
3
1034
3102.54
... More
EMWT 8 2023 24;Erection of the following equipment with Crane / Derrick at site including handling the material /equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 132 kv Lightning Arrestors. (Dismantling of 132KV LAs) A)Works under SD
3
1580
4741.29
... More
EMWT 8 2023 24;Erection of the following equipment with Crane / Derrick at site including handling the material / equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from dept. stores to the site). 132 kv Current Tranformers. (Dismantling of 132KV CTs using Crane /Derrick) A)Works under SD
3
3347
10043.1
... More
EMWT 8 2023 24;Plastering to Uneven surfaces of RR /CR, PCC with CM(1:5) 20mm. thick including cost & conveyance of all materials, labour charges, leads, lifts and curing complete as per the directions of the Engineer in charge for the finished item of work.
13
244
3176.42
... More
EMWT 8 2023 24;RCC M- 20 Nominal mix (Cement 400 kgs ) using 20mm size graded machine crushed hard granite metal (coarse aggregate) (20mm & 12mm (2:1)) from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and steel centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work(Sand 0.45 cum and Metal 0.90 cum) as directed by the Engineer in charge for finished item of work. - SWITCHYARD FOUNDATION
9.12
9658
88084.43
... More
EMWT 8 2023 24;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) (Fe 500/ 500D/ 550D) grade as per IS 1786-1979) of TISCO/ SAIL/ VSP/Jindal make, different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including other taxes on all materials etc., complete for finished item of work in all floors as per the directions of the Engineer-in-charge..( APSS No.126) - SwitchYard Works and Line Works
0.28
77189
21613.17
... More
EMWT 8 2023 24;Laying of Cement Concrete (1:4:8) mix using 40mm size HBG metal Machine crushed for foundations including cost and conveyance of all materials at all leads and lifts, ramming, consolidating, curing etc,complete. for finished item of work as per directions of the Engineer-in-charge.
1
4261
4261.89
... More
EMWT 8 2023 24;Providing Stone Crusher dust filling below the foundations as per the standard specifications of APDSS in uniform horizontal layers including cost and conveyance of all materials, watering and ramming, tools & tackles, all labour charges, all leads & lifts etc,complete for finished item of work as per directions of the Engineer-in-charge. ( APSS No. 309&310)
1.5
969
1454.07
... More
EMWT 8 2023 24;Earthwork excavation in all types of soils (up to stone matrix) which can be excavated with pick axe and crow bars and do not require blasting in all conditions such as dry, wet and slushy etc. covering initial lead and lift etc and backfilling the foundations (after laying foundations) with excavated earth including watering, compacting as per standard specification and disposing of surplus earth within site complete as per directions of Engineer in charge at site for finished item of work.
11
262
2886.18
... More
EMWT 8 2023 24;Dismantling the existing RCC by mannual means and carefully stacking the reuseful material at site and disposing the unserviceable metraial to any remote place 1000 mts distance away from site with all leads and lifts includung cost of T&P ,labour and as per the directions of the Engineer-in - charge for finished item of work.
1
2325
2325.61
... More
EMWT 8 2023 24;GI LATTICE STRUCTURES FOR SUBSTATIONS
0.8
93529
74823.2
... More
EMWT 8 2023 24;TWIN MOOSE TO SINGLE MOOSE SPACER T CLMP (150MM)
9
713
6422.04
... More
EMWT 8 2023 24;220KV ISOLATOR TWIN MOOSE ACSR CONDUCTOR PAD CLAMP(Supply of Twin moose pad clamp suitable for CB and LV Bushings ,and 33KVIsolater)
16
490
7847.68
... More
EMWT 8 2023 24;33KV CT MARSHALLING BOX
1
1254
1254.91
... More
EMWT 8 2023 24;T CLAMP FOR MOOSE TO MOOSE
32
493
15786.56
... More
EMWT 8 2023 24;RAIL POLE,105LB
0.57
54230
31073.79
... More
EMWT 8 2023 24;75X8MM GI FLAT
117.75
83
9790.91
... More
EMWT 8 2023 24;75X8MM MS FLAT
117.75
64
7536
... More
EMWT 8 2023 24;100X16MM MS FLAT
1008
64
64512
... More
EMWT 8 2023 24;GI EARTH BONDS
14
282
3959.76
... More
EMWT 8 2023 24;GI BOLTS & NUTS, SPRING & PACK WASHERS
0.1
74445
7444.57
... More
EMWT 8 2023 24;TWIN MOOSE SPACER CLAMP WITH 150MM SPACING
25
303
7592.5
... More
EMWT 8 2023 24;33KV POST INSULATOR CLAMP FOR TWIN MOOSE
6
619
3715.56
... More
EMWT 8 2023 24;3 BOLTED TENSION HARDWARE FOR TWIN MOOSE WITH 150MM SPACING FOR 33KV BUS
6
3503
21022.2