The Singareni Collieries Company Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

The Singareni Collieries Company Limited - SCCL Tender

Civil And Construction
Civil Works Others
Construction Works
Opening Date29 Aug 2022
Closing Date23 Sep 2022
Tender Amount₹ 3,56,650 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
CONSTRUCTION OF CHECK POST AT KTK OC III PROJECT BHUPALPALLI INVITED UNDER EARMARKED WORKS ST COMMUN;Reinforced Cement Concrete 1 : 1.5 : 3 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum) - For Sunshades.

0.33

-

4817.13

... More
CONSTRUCTION OF CHECK POST AT KTK OC III PROJECT BHUPALPALLI INVITED UNDER EARMARKED WORKS ST COMMUN;Reinforced Cement Concrete 1 : 1.5 : 3 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum) - For Lintels.

0.29

-

3047.5

... More
CONSTRUCTION OF CHECK POST AT KTK OC III PROJECT BHUPALPALLI INVITED UNDER EARMARKED WORKS ST COMMUN;Reinforced Cement Concrete 1 : 1.5 : 3 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum) - For Plinth Beams / Brace beams.

0.99

-

9804.08

... More
CONSTRUCTION OF CHECK POST AT KTK OC III PROJECT BHUPALPALLI INVITED UNDER EARMARKED WORKS ST COMMUN;Reinforced Cement Concrete 1 : 1.5 : 3 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum) - For Columns.

1.2

-

12550.38

... More
CONSTRUCTION OF CHECK POST AT KTK OC III PROJECT BHUPALPALLI INVITED UNDER EARMARKED WORKS ST COMMUN;Reinforced Cement Concrete 1 : 1.5 : 3 with 20mm down size (65% of 20-10mm and 35% of 10-4.75mm) graded Crushed Granite metal from approved quarry including cost and conveyance of all materials like sand, coarse aggregate, water etc., to site and including machine mixing and vibrating with mechanical vibrators, finishing, and centering/shuttering charges, etc, (but excluding cost of steel reinforcement and its fabrication charges and Cost of Cement) (CA : 0.90 Cum, FA:0.45Cum) - for Column footings / Raft

1.73

-

12359.09

... More
CONSTRUCTION OF CHECK POST AT KTK OC III PROJECT BHUPALPALLI INVITED UNDER EARMARKED WORKS ST COMMUN;Whiting to New ceiling with Surya cem / Equivalent Cem, two coats complete for finished item of work.

9

-

389.7

... More
CONSTRUCTION OF CHECK POST AT KTK OC III PROJECT BHUPALPALLI INVITED UNDER EARMARKED WORKS ST COMMUN;Supply and laying of 3 runs of 4 sq.mm 1100 v grade PVC insulated flexible copper cable ( Phase, Neutral & Earth) in existing metallic / Non -Metallic conduit pipe for run of circuit/power mains including copper lugs complete

60

-

12318

... More
CONSTRUCTION OF CHECK POST AT KTK OC III PROJECT BHUPALPALLI INVITED UNDER EARMARKED WORKS ST COMMUN;Supply and fixing of 8Way SPN distribution board concealed in wall with din rail suitable for any combination of single pole outgoing MCB s in sheet steel enclosure on wall with 1 no 32A, 2pole 100mA ELCB and 6 NOs of 6-32 Amps Single pole MCBs including connections, all masonry work complete

1

-

7657.7

... More
CONSTRUCTION OF CHECK POST AT KTK OC III PROJECT BHUPALPALLI INVITED UNDER EARMARKED WORKS ST COMMUN;Supply and laying of 3 runs of 2.5 sq.mm 1100 v grade PVC insulated flexible copper cable ( Phase, Neutral &Earth) in existing metallic / Non - Metallic conduit pipe for run of circuit / Power mains including copper lugs complete

80

-

12608

... More
CONSTRUCTION OF CHECK POST AT KTK OC III PROJECT BHUPALPALLI INVITED UNDER EARMARKED WORKS ST COMMUN;Providing independent earthing for Important equipment with 40mm dia B class 2.5m long G.I pipe and 40mm dia B class 2.5 m long G.I pipe and 19mm dia B class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C./Brick masnory Chamber of 450mm X 450mm X 400mm with R.C.C. Slab cover duly providing staggered holes filling with 20Kg salt and 40Kg charcoal or or 40Kg bentonite powder from the bottom of the pipe giving earth connection from electrode through G.I strip of 40mm X 6mm X 200mm length with all accessories and labour charges complete as per IS specifications 732/1982 9Part II) Note:Whenever providing full length of electrode is not possible due to obstruction of water tube/rock, the length of electrode may be reduced and additional earthing may be done to meet earth resistance

2

-

11050.2

... More
CONSTRUCTION OF CHECK POST AT KTK OC III PROJECT BHUPALPALLI INVITED UNDER EARMARKED WORKS ST COMMUN;Supply and fixing MODULAR type 16A one module ISI marked 5 pin pin socket with MODULAR type 16A SP switch and GI box covered with suitable white cover plate and concealed in wall complete

4

-

3468

... More
CONSTRUCTION OF CHECK POST AT KTK OC III PROJECT BHUPALPALLI INVITED UNDER EARMARKED WORKS ST COMMUN;Supply and Wiring with 3 runs of 1.0 sq.mm 1100 V grade PVC insulated flexible copper conductor cable (phase,nuetral & earth) in the existing P.V.C conduit pipe with MODULAR type 6A ISI marked 5 pin Pin MODULAR Type socket with MODULAR Type 6A switch control and with GI Box and White Front plate concealed in wall complete with all accessories (fixing on seperate board)( MDS Type).

4

-

4143.2

... More
CONSTRUCTION OF CHECK POST AT KTK OC III PROJECT BHUPALPALLI INVITED UNDER EARMARKED WORKS ST COMMUN;Supply and Wiring with three runs of 1.0 sq.mm (14/0.3mm) 1100 V grade PVC insulated flexible copper conductor cable (phase,nuetral & earth) in the existing P.V.C conduit pipe with 6A flush type ISI marked MODULAR type Control switch, MODULAR 120W step Type electronic hum free fan regulator, GI Box and white Front plate concealed in wall complete for fan pont ( MDS Type).

2

-

3159.2

... More
CONSTRUCTION OF CHECK POST AT KTK OC III PROJECT BHUPALPALLI INVITED UNDER EARMARKED WORKS ST COMMUN;Supply and Wiring with three runs of 1.0 sq.mm (14/0.3mm) 1100 V grade P.V.C insulated flexible copper conductor cable (phase, neutral & earth) in the existing P.V.C conduit pipe with 6A flush type ISI marked MODULAR type switch/bell push with GI box and white front plate concealed in wall and ceiling Rose/Slant accessories as necessary complete for light , bell, exhaust fan points(MDS Type).

10

-

10198

... More
CONSTRUCTION OF CHECK POST AT KTK OC III PROJECT BHUPALPALLI INVITED UNDER EARMARKED WORKS ST COMMUN;Supply and fixing of 25mm dia, heavy guage recessed/concealed ISI marked PVC conduit pipe along with reinforcement laid into wall/slab with all required accessories wherever necessary including masonry work for circuit main/sub-mains/15 A power circuit/Telephone/TV points complete

40

-

4212

... More
CONSTRUCTION OF CHECK POST AT KTK OC III PROJECT BHUPALPALLI INVITED UNDER EARMARKED WORKS ST COMMUN;Plastering to Ceiling with cement mortar 1:3, 12mm thick ( But Excluding Cost of Cement )

9

-

1484.55

... More
CONSTRUCTION OF CHECK POST AT KTK OC III PROJECT BHUPALPALLI INVITED UNDER EARMARKED WORKS ST COMMUN;Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) 3 track sliding windows with mesh shutter â?? (2-glass shutters and 1-mesh shutter) duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of (94 x 45mm)/(80x 52mm) x 2.20mm for outer frames, (58x 39mm)/(54x 38mm) x 2.20mm for sliding shutter frames capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2mm prefabricated and welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make and mesh shutter frame shall be (42x 25mm)/(52x 21.5mm) x 2.0mm fitted with Vinyl Coated Fiber mesh- on rollers/ pulley duly fixed with Grey colour TPV Gasket for sash and Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work.

6.48

-

52412.18

... More
CONSTRUCTION OF CHECK POST AT KTK OC III PROJECT BHUPALPALLI INVITED UNDER EARMARKED WORKS ST COMMUN;Supply and fixing Flush door shutters, solid bond wood block board type with teak ply on both faces.: 30 mm thick conforming to IS:2202 as per Approved Make including the following Aluminium anodised fittings : conforming to relevant IS standards : Single Shutter a) 3 nos. 150 mm long butt hinges. b) 2 nos. 200 mm to 250 mm long tower bolt with 10mm dia shoot. ; c) 1 no. 300mm long aldrop with 16mm dia shoot. d) 2 no. 100 mm to 150 mm long grip handle. e) 1 no. foot door stopper.

1.71

-

6059.73

... More
CONSTRUCTION OF CHECK POST AT KTK OC III PROJECT BHUPALPALLI INVITED UNDER EARMARKED WORKS ST COMMUN;Supply and fixing Door frame of 100 x75mm with Medium teak wood including supply and fixing with 6nos. M.S.Z type hold fasts made out of 50x3mm M.S.flat 300mm long in CC beds, etc., complete. (Excluding Cost of Bed Blocks.)

6

-

6305.4

... More
CONSTRUCTION OF CHECK POST AT KTK OC III PROJECT BHUPALPALLI INVITED UNDER EARMARKED WORKS ST COMMUN;Conveyance charges of Steel including loading, unloading and stacking charges for Beyond 5KM and upto 30KM(Rate/KM) lead.

7.2

-

72.72

... More
CONSTRUCTION OF CHECK POST AT KTK OC III PROJECT BHUPALPALLI INVITED UNDER EARMARKED WORKS ST COMMUN;Conveyance charges of Steel including loading, unloading and stacking charges for 5 KM lead.

0.9

-

285.95

... More
CONSTRUCTION OF CHECK POST AT KTK OC III PROJECT BHUPALPALLI INVITED UNDER EARMARKED WORKS ST COMMUN;Conveyance charges of CEMENT including loading, unloading and stacking charges for Beyond 5KM and upto 30KM(Rate/KM) lead.

42.99

-

434.23

... More
CONSTRUCTION OF CHECK POST AT KTK OC III PROJECT BHUPALPALLI INVITED UNDER EARMARKED WORKS ST COMMUN;Conveyance charges of CEMENT including loading, unloading and stacking charges for 5 KM lead.

5.37

-

1484.3

... More
CONSTRUCTION OF CHECK POST AT KTK OC III PROJECT BHUPALPALLI INVITED UNDER EARMARKED WORKS ST COMMUN;Acrylic exterior emulsion Painting to New walls with Grade-II i.e., Ace or equivalent paint of Approved Make 2 coats over a base coat of Grade -II primer (making 3 coats in all) complete for finished Item of work -For External Walls

55

-

9207

... More
CONSTRUCTION OF CHECK POST AT KTK OC III PROJECT BHUPALPALLI INVITED UNDER EARMARKED WORKS ST COMMUN;Labour Charges for Fixing of window grills, compound wall grills, Iron Doors, windows, Verandah grils, and window guard bars in position etc., complete.

130

-

741

... More
CONSTRUCTION OF CHECK POST AT KTK OC III PROJECT BHUPALPALLI INVITED UNDER EARMARKED WORKS ST COMMUN;Labour Charges for Fabrication of steel works like window grills, compound wall grills, Iron Doors, windows, Verandah grils and window guard bars including cost of welding rods, power charges etc., ( Excluding cost of fixing in position)

130

-

4433

... More
CONSTRUCTION OF CHECK POST AT KTK OC III PROJECT BHUPALPALLI INVITED UNDER EARMARKED WORKS ST COMMUN;Painting with two coats of Red oxide iron primer paint of grade-1 of Approved Make to Old Iron work - complete for finished item of work.

6.48

-

624.02

... More
CONSTRUCTION OF CHECK POST AT KTK OC III PROJECT BHUPALPALLI INVITED UNDER EARMARKED WORKS ST COMMUN;Providing gultha in CM 1:6, 20 mm thick and 150 mm wide including necessary scraping of wall and finishing the surface as directed ( But Excluding Cost of Cement )

8.67

-

294

... More
CONSTRUCTION OF CHECK POST AT KTK OC III PROJECT BHUPALPALLI INVITED UNDER EARMARKED WORKS ST COMMUN;20 mm thick plain cement mortar bands in cement mortar 1:4 up to 300 mm in width for elevations and drip moulds etc.,- Raised Band (But Excluding Cost of Cement )

0.75

-

447.37

... More
CONSTRUCTION OF CHECK POST AT KTK OC III PROJECT BHUPALPALLI INVITED UNDER EARMARKED WORKS ST COMMUN;Oil bound Distempering to New walls with 2 coats of Approved Make distemper over a base coat of Grade -1 primer (making 3 coats in all) complete for finished Item of work.

36

-

4694.4

... More
CONSTRUCTION OF CHECK POST AT KTK OC III PROJECT BHUPALPALLI INVITED UNDER EARMARKED WORKS ST COMMUN;Providing skirting /risers of steps with ceramic wall tiles of size 200 x 300mm / 245mm x 325mm with 6 mm thick 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs and length equal to flooring tiles, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost and conveyance of all materials, labour charges etc., complete for finished item of work,( But Excluding Cost of Cement )

1.2

-

630.91

... More
CONSTRUCTION OF CHECK POST AT KTK OC III PROJECT BHUPALPALLI INVITED UNDER EARMARKED WORKS ST COMMUN;Flooring with Non-skid Ceramic floor tiles of size 400 x 400 mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, set over base coat of cement mortar (1:6), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per Sqm and jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost and conveyance of all materials, labour charges etc., complete for finished item of work, (But Excluding Cost of Cement )

9

-

7768.44

... More
CONSTRUCTION OF CHECK POST AT KTK OC III PROJECT BHUPALPALLI INVITED UNDER EARMARKED WORKS ST COMMUN;Plastering to brick / stone masonry with cement mortar 1:6, 20 mm thick in two coats including raking out of joints for walls only ( But Excluding Cost of Cement )

55

-

17343.15

... More
CONSTRUCTION OF CHECK POST AT KTK OC III PROJECT BHUPALPALLI INVITED UNDER EARMARKED WORKS ST COMMUN;Plastering 15 mm thick Two Coats with Base Coat of 11mm thick in cement mortar 1:6; and top coat of 4mm thick in CM 1:4 with sponge finishing etc., ( But Excluding Cost of Cement ) Complete for walls only

36

-

11133.36

... More
CONSTRUCTION OF CHECK POST AT KTK OC III PROJECT BHUPALPALLI INVITED UNDER EARMARKED WORKS ST COMMUN;Flyash Brick masonry with bricks of size 225x100x60mm with 50kg/cm2 Compressive strength in C.M.1:6 for superstructure including scaffolding etc., (But Excluding Cost of Cement) complete.

7

-

47281.92

... More
CONSTRUCTION OF CHECK POST AT KTK OC III PROJECT BHUPALPALLI INVITED UNDER EARMARKED WORKS ST COMMUN;Labour charges for cutting, bending and binding reinforcement with contractors binding wire, and placing in position as directed by Engineer - in - charge including all leads, etc., complete

0.9

-

12585.96

... More
CONSTRUCTION OF CHECK POST AT KTK OC III PROJECT BHUPALPALLI INVITED UNDER EARMARKED WORKS ST COMMUN;Brushing of existing concrete surface with wire brush and providing cement concrete 1:2:4 screed of an average thickness of 20mm using 6mm size crushed granite metal of approved hard quality, and providing 2 layers of 24 guage rabbit wire mesh in the CC screed as nominal reinforcement and plastering with CM 1:4, 12mm thick including admixing of approved impervious water proofing compound as per manufacturers specification or @ 2% by weight of cement and finishing smooth and including providing slopes to drain off water etc., complete as directed (But Excluding Cost of Cement )

16.48

-

4911.9

... More
CONSTRUCTION OF CHECK POST AT KTK OC III PROJECT BHUPALPALLI INVITED UNDER EARMARKED WORKS ST COMMUN;Cement Concrete 1:4:8 with 40 mm size Crushed granite metal of approved hard quality in foundations or Plinths etc., Complete (But Excluding Cost of Cement) - with concrete mixer

1.5

-

5415.22

... More
CONSTRUCTION OF CHECK POST AT KTK OC III PROJECT BHUPALPALLI INVITED UNDER EARMARKED WORKS ST COMMUN;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead up to 50m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work as per SS - 20 B (APSS 308) - Ordinary Soil-Manual Means -Up to 3 m depth

15

-

3648



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.