For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

State Warehousing Corporation Tender

Works
Civil And Construction
Building Construction
Opening Date16 Nov 2024
Closing Soon2 Dec 2024
Tender Amount₹ 66,12,855 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Constructing Inspection chamber 457.2 mm x 457.2 mm size up to 914.4 mm in Brick masonry CM 1:6 prop., and fitted with light weight 457.2 mm x 457.2 mm C.I frame and cover including cost & conveyance of all materials, labour chrges, over head charges and contractor profit but excluding GST etc., complete

5

5237

26188.25

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Laying, fixing and commissioning of PVC/SWR pipes including couplers/ bends/ tees etc any diameter including fixing necessary fittings like bends, plugs, couplers, junctions, tees, etc with solvent jointing as per standard practice including labour charges, overhead charges and contractor profit but excluding GST etc., complete

45

118

5317.2

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;SWR Pipe Clip 75 mm dia

4

21

86.36

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;SWR Vent Cowl 75 mm dia

1

20

20.45

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;SWR Nahany trap with jali 75 mm dia

2

118

236.32

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;SWR Single Tee with door 75 mm dia

1

99

99.98

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;SWR Door Bend 75 mm dia - 87.5 Degree

4

92

368.12

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;SWR Plain Bend 75 mm dia - 87.5 Degree

3

69

207.93

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;SWR pipe 75 mm dia - Type- A Double socket 0.91m length

4

148

595.36

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;SWR pipe 75 mm dia - Type- A Double socket 1.83m length

4

256

1027.08

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;SWR pipe 75 mm dia - Type- A Single socket 3m length

4

341

1367.92

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;SWR Pipe Clip 110 mm dia

6

25

150

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;SWR Vent Cowl 110 mm dia

5

26

130.65

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;SWR Single 'Y' with Door 110 mm dia

4

230

922.56

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;SWR Single Tee with door 110 mm dia

5

174

874.85

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;SWR Door Bend 110 mm dia - 87.5 Degree

5

145

727.15

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;SWR Plain Bend 110 mm dia - 87.5 Degree

4

113

454.48

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;SWR pipe 110 mm dia - Type- A Double socket 0.91m length

4

282

1131.6

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;SWR pipe 110 mm dia - Type- A Double socket 1.83m length

5

476

2380.25

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Supply of PVC/SWR Pipes and fittings including cost and conveyance of materials etc., complete including over heads & contractors profit but excluding GST. SWR pipe 110 mm dia - Type- A Single socket 3m length

5

646

3232.35

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Supplying & Fixing of PVC low level flushing tank 8 Lit Capacity Single flush Parry ware make including cost and conveyance of material, labour charges, overhead charges and contractor profit but excluding GST etc., complete

2

1119

2238.22

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Supplying & Fixing Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with 19.05mm 400gms NP stop cock Indian make with ISI mark Seiko/Senior/Nice or equivalent parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block: 630 x 450 mm - Single C.P. Pillar cock

6

3327

19966.68

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Supplying & Fixing of glazed Half stall urinals of size 410mmx265mm x 305mm with standard CP spreader fixed with screws comlete Indian make, HSW/Parry/Neycer make

2

3957

7914.42

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Supply, Installation and commissioning approved make floor mounted EWC (suit) CASCADE model 'P' or 'S' trap with dual flush porcelain cistern fixed on EWC with all internal parts of dual flush cistern, ultra solid seat cover of approved make with rubber buffer and cap 15 mm angle stop cock 450 mm long PVC inter connection pipe wall flanges all of approved make etc. complete for finished item of work in all respects: White Colour

6

19678

118068.72

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Supply and fixing of Vitreous china Squatting pan, Orissa pattern 630x450mm size Parryware make with S trap and fixed over brick masonry seat using traditional clay bricks as per standard practice incuding cost and conveyance of all materials, Labour charges, overhead charges and contractor profit but excluding GST etc., complete

1

2507

2507.48

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Supply & Fixing of Bib cock cum Health faucet with 1m long flexible tube and wall hook Jaquar make including cost and conveyance of material, labour charges, overhead charges and contractor profit but excluding GST etc., complete

5

4008

20041.7

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Supply & Fixing of Angle stop cock 12.7 mm dia Indian make First quality, Heavy duty Seiko/ Senior/ Nice equivalent including cost and conveyance of material, labour charges, overhead charges and contractor profit but excluding GST etc., complete

15

768

11520.6

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Supply and fixing of CP Long body Bib cock fancy type deluxe 400 grams 12.7 mm dia Indian make Seiko/ Senior/ Nice or equivalent including including cost of material, labour charges, overhead charges and contractor profit but excluding GST etc., completete

5

957

4788.85

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Supply and fixing of CPVC pipes and fittings of 15.90mm OD pipes-SDR 13.5 to meet the requirement of ASTM-D 2846 and are produces in CTS (copper tube sizes 1/2" to 2" SDR 11 mand 13.5 pipes are made from identical CPVC compounds having the same phicical properties for hot and cold water (IS15778-2007) with CPVC fittings including including cost of material, labour charges, overhead charges and contractor profit but excluding GST etc., completete

25

176

4402.5

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Supply and fixing of CPVC pipes and fittings of 28.60mm OD pipes-SDR 13.5 to meet the requirement of ASTM-D 2846 and are produces in CTS (copper tube sizes 1/2" to 2" SDR 11 mand 13.5 pipes are made from identical CPVC compounds having the same phicical properties for hot and cold water (IS15778-2007) with CPVC fittings including including cost of material, labour charges, overhead charges and contractor profit but excluding GST etc., completete

50

267

13350

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks including cost of material, labour charges, overhead charges and contractor profit but excluding GST etc., complete

1000

11

11360

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Lowering, laying and jointing HDPE pipes 32mm OD and specials / fittings as per IS:7364 part -II - 1975 including excavation of trench of 0.5m width and 0.50 m depth in all soils except rock requiring blasting and refilling trenches after laying and jointing pipes including cost of jointing material,labour charges, overhead charges contractor profit but excluding the cost of pipes and GST etc., complete.

50

56

2840.5

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;PLUMBING: Supply and delivery of 32mm OD HDPE pipes (PE100 PN10 DN32) confirming to IS:4984-1987 including cost of pipe, transportation charges, overhead charges and contractor profit but excluding GST etc., complete

69

78

5408.91

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Supply and fixing of 20W LED Street light luminair, body made of high grade pressure die ? cast Aluminium alloy with corrosion resistant powder coat, having protective toughened glass cover, Less Glare, IP 66 l with 1.0 Mtr., 25mm dia GI pipe bracket and anti tilting MS flat etc., with BIS certification with warranty of 50,000 burning hours of Phillips / Wipro/ Crompton/Havells or equivalent make including cost and conveyance of material and labour charges, overhead charges and contrcator profit but excluding GST etc., complete

2

2558

5117.78

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Supply and laying of UG Cable of 6 sqmm 2 core XLPE insulated, 1100V grade armoured alluminium cable as per specification conforming to IS-7098 (part-I) of makes Polycab/ Finolex/ Havels/ V-Guard, with excavation of trench, Sand filling, laying of cable and back filling including cost of all accessories and labour charges etc., complete.

50

655

32760

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Providing independent earthing by excavating a pit to a depth of 2.1m in all soils, as per size specified, using GI pipe 40mm dia medium class of 2.5m length duly providing staggered holes and with necessary accessories and with hume pipe ring including filling with equal proportion of Salt and Charcoal in layers including cost of material, labour charges, over head charges, contractor profit but excluding GST etc.,

1

6635

6635.12

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Supply and erecting ceiling fan with 3 blades and double ball bearings and with condenser A.C.250V 50C/S of (48") 1200mm sweep completely errected in position with Resistance type regulator, canopy down rod upto 304.8 mm in length is provided with hook/clamps nuts and bolts and 24/.2 flexible copper wire etc., complete and pointed with lettering by enamel paint the Sr. No and date of errection including cost and conveyance of all materials and labour charges.

13

3758

48856.73

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Supply and fixing of 20W, 2000 lumens, 1200mm length LED retro tube light, housing made with glass body, wide operating voltage with single side connection with BIS Certification with warranty of 50,000 burning hours of Phillips / Wipro/ Crompton/Havells or equivalent make including cost and conveyance of material and labour charges, overhead charges and contrcator profit but excluding GST etc., complete

18

793

14289.84

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Supply and fixing SPN Distribution board with IP-42 protection (Metal Door) suitable for single phase ELCB / RCCB/DP Isolator as incomer and 10kA SP MCBs as outing going including internal connection including cost of material, labour charges, over head charges, contractor profit but excluding GST etc.,

1

7274

7274.2

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Supply & fixing of 20A pin modular socket with 20A modular switch control on common board with earth connectivity including wire leads including cost of material, labour charges, over head charges, contractor profit but excluding GST etc.,

10

719

7192.7

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Supply & fixing of 16A 3/2 pin modular socket with 16A modular switch control on common board with earth connectivity including wire leads including cost of material, labour charges, over head charges, contractor profit but excluding GST etc.,

32

543

17381.44

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Supply and fixing of 6A 3 pin plug modular socket with 6A switch control on a common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete.

24

509

12218.16

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Wiring with 2x1.0 sq.mm (14/0.3mm) Fire Retardant PVC insulated flexible copper cable in the existing non metallic conduit pipe with 6A modular switch, ceiling rose including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete for Tube Light, Fan points in Residential buildings

49

734

35991.48

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FR P.V.C. insulated flexible copper cable in existing pipe for earth continuity inlcuding cost & conveyance of all materials all labour charges, overhead charges and contractor profit but excluding GST etc., complete.

300

26

7827

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Supply and run of 2x4.0 sq.mm (56/0.3mm) Fire Retardant PVC insulated flexible copper cable in the existing non metallic conduit pipe for Mains including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete

300

159

47832

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) FR PVC insulated flexible copper cable in existing pipe for mains inlcuding cost & conveyance of all materials all labour charges, overhead charges and contractor profit but excluding GST etc., complete.

600

104

62634

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Supply & fixing of Modular Base plate and Cover Frame of Crabtree / Feno Switch / Toyoma / Fortune Art / Million / Gold Medal / Vimal / Anchor Roma / Schneider Opale make for fixing switches , sockets and dimmers etc., including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete. 2 Module box

11

94

1039.61

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Supply & fixing of Modular Base plate and Cover Frame of Crabtree / Feno Switch / Toyoma / Fortune Art / Million / Gold Medal / Vimal / Anchor Roma / Schneider Opale make for fixing switches, sockets and dimmers etc., including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete. 6 Module box

16

180

2890.56

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Supply & fixing of Modular Base plate and Cover Frame of Crabtree / Feno Switch / Toyoma / Fortune Art / Million / Gold Medal / Vimal / Anchor Roma / Schneider Opale make for fixing switches , sockets and dimmers etc., including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete. 8 Module box

8

222

1781.2

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Supply & fixing of Modular Base plate and Cover Frame of Crabtree / Feno Switch / Toyoma / Fortune Art / Million / Gold Medal / Vimal / Anchor Roma / Schneider Opale make for fixing switches , sockets and dimmers etc., including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete. 12 Module box

16

276

4419.2

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Supply of Hot dip galvanized metallic boxes modular size for switch boards including cost of box and labour charges for fixing, over head charges, contractor profit but excluding GST etc., complete. 2 Module box

11

90

999.79

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Supply of Hot dip galvanized metallic boxes modular size for switch boards including cost of box and labour charges for fixing, over head charges, contractor profit but excluding GST etc., complete. 6 Module box

16

204

3272.16

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Supply of Hot dip galvanized metallic boxes modular size for switch boards including cost of box and labour charges for fixing, over head charges, contractor profit but excluding GST etc., complete. 8 Module box

8

267

2136

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Supply of Hot dip galvanized metallic boxes modular size for switch boards including cost of box and labour charges for fixing, over head charges, contractor profit but excluding GST etc., complete. 12 Module box

16

323

5180.8

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Supply and Fixing of 25mm dia 1.50mm thick P.V.C. pipe (ISI mark) concealed in wall with all required accessories including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete.

200

168

33756

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;ELECTRIFICATION TO REGIONAL OFFICE BUILDING: Supply and Fixing of 25mm dia 2.2mm thick PVC pipe of make Sudhakar/ Modi/ Atul (ISI MARK) concealed in Roof with all required accessories including masonary work and labour charges etc., complete.

165

98

16295.4

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Painting to new iron work with 2 coats of synthetic enamel paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of dead mortar, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per APSS No.1212. For Window grills

7.2

153

1103.33

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Painting Priming coat to new wood work with wood primer of approved brand and two coats with synthetic enamel paint second grade of Asian / Nerolac / Berger etc., including cost of primer and conveyance of all materials, labour charges etc., complete. For Doors

10.8

254

2752.81

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Painting to walls with one coat water based cement primer of exterior grade II and two coats of acrylic exterior emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams/litre for exterior walls including cost and conveyance of all materials to site, sales and other taxes incidental, operational and all labour charges etc., complete for finished item of work in all floors.

160.6

295

47478.18

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Painting to new walls with one coat water based cement primer of interior grade I and 2 coats of plastic emulsion paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per APSS No.911 for interior walls

281.98

213

60225.29

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Providing/ applying Cement based putty of Birla/ Asian make of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges, overhead charges and contractor profit but excluding GST etc. complete for finished item of work for Internal walls

281.98

271

76546.29

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Supply and fixing of MS Grills to Window, Ventilator and Others as per approved design including cost of MS structural stell, fabrication charges, transportation charges fixing charges, over head charges and contractor profit but excluding GST etc complete for finished item of work

120

121

14588.4

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) 3 track sliding windows with mesh shutter provision ? (only 2-glass shutters) duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of (80 mm x 52 mm)/ (94 mm x 45 mm) x 2.20 mm for outer frames, (54 mm x 38 mm)/(39 mm x 58 mm) x 2.20 mm for sliding shutter frames capable of mounting single glazing system, structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be coextruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site usinganchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work

7.2

7266

52321.1

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Supply & fixing of Wood Polymer Composite (WPC) Door of size 750x2050mm, Frame made up of WPC, of section size 100x65mm with MS hold fasts - 6 Nos and WPC flush shutter of 30mm thick 700x1900mm size, 32mm thick -1No, with Stainless steel fittings: Hinges 125mm - 3 Nos, Tower bolts 100mm - 1 No, Handles 125mm - 2 Nos, Aldrop 200mm - 1 No as per approved design and specifications including cost and conveyance of all materials, all fittings, labour charges, overhead charges and contractor profit but excluding GSTetc., complete

1

9028

9028.55

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Supply & fixing of Wooden Door with Flush shutter of size 1000x2400mm with fanlight, Frame made up of Medium Teak wood, of section size 100x65mm with MS hold fasts - 6 Nos and Moulded solid core flush shutter 900x2000mm size, 30mm thick one 1 No made with water resistant hard wood fibre HDF/MDF fibre board skins of 2.5mm thick, with MSS fittings: Hinges 150mm - 3 Nos, Tower bolts 200mm - 2 Nos, Handles 150mm - 2 Nos, Aldrop 300mm - 1 No, as per approved design and specifications including cost and conveyance of all materials, labour charges, all fittings and furniture etc., complete

2

11380

22761.76

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Providing Flooring with Polished Granite stones 16mm thick, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade as per APSS No.703, including cost and conveyance of all materials like cement, sand water and tiles etc., complete including over head charges but excluding GST for finished item of work

19.44

2620

50941.35

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Providing Dadoing to internal walls to 2100mm height with Glazed ceramic tiles 7.30 mm thick, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water, labour charges, overhead charges and contractor profit but excluding GST etc., complete

14.36

1095

15735.11

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Flooring with ceramic tiles of first quality over a bed of cement slurry of 12mm thick with C.M. (1:8) prop. including cost and conveyance of all materials, labour charges, overhead charges and contarctor profit but excluding GST etc., complete for finished item of work

3.66

1058

3875.76

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Providing skirting to internal walls to 10 cm height with vitrified tiles, 1st quality of Double charged 600x600mm size 8-12 mm thickness glossy finish and premium colour, length equal to flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water and including cost and conveyance of all meterials and labour charges, overhead charges & Contractors profit etc., complete but excluding GST and seigorage charges for finished item of work

3.5

1380

4830.21

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Flooring with vitrified tiles of 1st quality, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials.

64.48

1394

89915.43

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Providing Plaster to Brick masonry walls, Two coats 12mm thick, base coat 8mm thick in CM 1:5 prop., and finished coat 4mm in CM 1:3 prop., with sponze finishing including cost and conveyance of all meterials, labour charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. Above 3.66m height

338.69

619

209743.94

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Providing Plaster Two coats 12mm thick, base coat 8mm thick in CM 1:5 prop., and finished coat 4mm in CM 1:3 prop., with sponge finishing including cost and conveyance of all materials and labour charges, over head charges and contractor profit but excluding GST to Ceilings. Above 3.66m height

103.88

670

69694.13

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Providing Plain Cement Concrte (1:2:4) prop. using 20mm size granite machine crushed metal including cost and conveyance of all materials to site of work and labour charges, centering, machine mixing, laying, curing and all other incidental and operational charges.

1.06

7184

7615.94

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Providing Masonry work in cement mortar (1:6) Prop. with fly ash cement solid blocks of size 290x225x140mm for manufacturing of fly ash solid blocks using fly ash 80kgs, cement of 15 kgs gypsum of 5 kgs and stone dust including cost and conveyance of all materials, Labour Charges, water leads, curing, scaffolding charges, lift charges, machine mixing charge etc., complete with compressive strength not less than 50kgs for 225mm thick walls for superstructure Above 3.66m height

38.96

8344

325092.76

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green, mixing mortar, laying, rendering smoot, rounding off junctions of wall and slab and curing including cost of all materials, labour charges, overhead charges, contractor profit but excluding GST etc., complete for finished item of the work.

96.77

715

69260.22

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Providing Steel reinforcement with TMT bars of Fe-500 grade including cost & conveyance steel bars, binding wire and labour charges for fabrication including cutting, bending, placing in position and tying of bars, overhead charges, contractor profit but excluding GST etc., complete

2

79954

159908.56

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Providing RCC M20 grade Nominal mix using 20mm nominal graded size crushed metal as Courase aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. For Chajjas 0.05m thick

3.6

1329

4786.13

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Providing VRCC M25 grade Nominal mix using 20mm nominal graded size crushed metal as Courase aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. For Lintels

0.51

14909

7603.76

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Providing VRCC M25 grade Nominal mix using 20mm nominal graded size crushed metal as Courase aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. For Roof Slab 125mm thick

96.77

1708

165310.26

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Providing VRCC M25 grade Nominal mix using 20mm nominal graded size crushed metal as Courase aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. For Roof Beams

4.04

14140

57125.96

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Providing VRCC M25 grade Nominal mix using 20mm nominal graded size crushed metal as Courase aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. For Steps

0.64

14140

9049.66

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Providing VRCC M25 grade Nominal mix using 20mm nominal graded size crushed metal as Courase aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. For Waist Slab 150mm thick

10.8

1935

20898.32

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;FIRST FLOOR: Providing VRCC M25 grade Nominal mix using 20mm nominal graded size crushed metal as Courase aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. For Columns

2.9

15148

43930.62

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Painting to new iron work with 2 coats of synthetic enamel paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of dead mortar, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per APSS No.1212. For Window grills

18

153

2758.32

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Painting Priming coat to new wood work with wood primer of approved brand and two coats with synthetic enamel paint second grade of Asian / Nerolac / Berger etc., including cost of primer and conveyance of all materials, labour charges etc., complete. For Doors

39.15

254

9978.94

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Painting to walls with one coat water based cement primer of exterior grade II and two coats of acrylic exterior emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams/litre for exterior walls including cost and conveyance of all materials to site, sales and other taxes incidental, operational and all labour charges etc., complete for finished item of work in all floors.

280.83

295

83021.77

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Painting to new walls with one coat water based cement primer of interior grade I and 2 coats of plastic emulsion paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per APSS No.911 for interior walls

823.93

213

175974.97

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Providing/ applying Cement based putty of Birla/ Asian make of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges, overhead charges and contractor profit but excluding GST etc. complete for finished item of work for Internal walls

823.93

271

223664.04

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Supply and fixing of MS Grills to Window, Ventilator and Others as per approved design including cost of MS structural stell, fabrication charges, transportation charges fixing charges, over head charges and contractor profit but excluding GST etc complete for finished item of work

300

121

36471

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) 3 track sliding windows with mesh shutter provision ? (only 2-glass shutters) duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of (80 mm x 52 mm)/ (94 mm x 45 mm) x 2.20 mm for outer frames, (54 mm x 38 mm)/(39 mm x 58 mm) x 2.20 mm for sliding shutter frames capable of mounting single glazing system, structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be coextruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site usinganchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work

18

7266

130802.76

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Supply & fixing of Wood Polymer Composite (WPC) Door of size 750x2050mm, Frame made up of WPC, of section size 100x65mm with MS hold fasts - 6 Nos and WPC flush shutter of 30mm thick 700x1900mm size, 32mm thick -1No, with Stainless steel fittings: Hinges 125mm - 3 Nos, Tower bolts 100mm - 1 No, Handles 125mm - 2 Nos, Aldrop 200mm - 1 No as per approved design and specifications including cost and conveyance of all materials, all fittings, labour charges, overhead charges and contractor profit but excluding GSTetc., complete

4

9028

36114.2

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Supply & fixing of Wooden Door with Flush shutter of size 1000x2400mm with fanlight, Frame made up of Medium Teak wood, of section size 100x65mm with MS hold fasts - 6 Nos and Moulded solid core flush shutter 900x2000mm size, 30mm thick one 1 No made with water resistant hard wood fibre HDF/MDF fibre board skins of 2.5mm thick, with MSS fittings: Hinges 150mm - 3 Nos, Tower bolts 200mm - 2 Nos, Handles 150mm - 2 Nos, Aldrop 300mm - 1 No, as per approved design and specifications including cost and conveyance of all materials, labour charges, all fittings and furniture etc., complete

6

11380

68285.28

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Supply & fixing of Wooden Door with threshold Fully Panelled of size 1200x2400mm with fan light, Frame made up of Medium Teak wood, of section size 100x75mm with MS hold fasts - 6 Nos and Panelled Shutter Two leaves 545x2000mm size, 32mm thick of each made with Medium Teak wood planks, with SS fittings: Hinges 150mm - 3 Nos, Tower bolts 200mm - 2 Nos, Handles 150mm - 2 Nos, Aldrop 300mm - 1 No, fan light is fitted with 5mm thick Pin headed glass as per approved design and specifications including cost and conveyance of all materials, labour charges, all fittings and furniture etc., complete

1

34933

34933.78

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Providing Flooring with Polished Granite stones 16mm thick, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade as per APSS No.703, including cost and conveyance of all materials like cement, sand water and tiles etc., complete including over head charges but excluding GST for finished item of work

19.44

2518

48967.42

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Providing Dadoing to internal walls to 2100mm height with Glazed ceramic tiles 7.30 mm thick, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water, labour charges, overhead charges and contractor profit but excluding GST etc., complete

57.44

1039

59731.86

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Flooring with ceramic tiles of first quality over a bed of cement slurry of 12mm thick with C.M. (1:8) prop. including cost and conveyance of all materials, labour charges, overhead charges and contarctor profit but excluding GST etc., complete for finished item of work

14.64

1003

14685.24

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Providing skirting to internal walls to 10 cm height with vitrified tiles, 1st quality of Double charged 600x600mm size 8-12 mm thickness glossy finish and premium colour, length equal to flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water and including cost and conveyance of all meterials and labour charges, overhead charges & Contractors profit etc., complete but excluding GST and seigorage charges for finished item of work

16

1324

21187.2

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Flooring with vitrified tiles of 1st quality, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials.

190.22

1338

254630.39

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Providing Plaster to Brick masonry walls, Two coats 12mm thick, base coat 8mm thick in CM 1:5 prop., and finished coat 4mm in CM 1:3 prop., with sponze finishing including cost and conveyance of all meterials, labour charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. upto 3.66m height

856.77

564

483955.1

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Providing Plaster Two coats 12mm thick, base coat 8mm thick in CM 1:5 prop., and finished coat 4mm in CM 1:3 prop., with sponge finishing including cost and conveyance of all materials and labour charges, over head charges and contractor profit but excluding GST to Ceilings. upto 3.66m height

248

607

150702.16

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Providing Plain Cement Concrte (1:2:4) prop. using 20mm size granite machine crushed metal including cost and conveyance of all materials to site of work and labour charges, centering, machine mixing, laying, curing and all other incidental and operational charges.

0.17

7062

1200.57

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Providing Masonry work in cement mortar (1:6) Prop. with fly ash cement solid blocks of size 290x225x140mm for manufacturing of fly ash solid blocks using fly ash 80kgs, cement of 15 kgs gypsum of 5 kgs and stone dust including cost and conveyance of all materials, Labour Charges, water leads, curing, scaffolding charges, lift charges, machine mixing charge etc., complete with compressive strength not less than 50kgs for 225mm thick walls for superstructure Upto 3.66m height

63.41

7804

494904.9

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green, mixing mortar, laying, rendering smoot, rounding off junctions of wall and slab and curing including cost of all materials, labour charges, overhead charges, contractor profit but excluding GST etc., complete for finished item of the work.

143.51

666

95577.66

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Providing Steel reinforcement with TMT bars of Fe-500 grade including cost & conveyance steel bars, binding wire and labour charges for fabrication including cutting, bending, placing in position and tying of bars, overhead charges, contractor profit but excluding GST etc., complete

7

78051

546358.61

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Providing RCC M20 grade Nominal mix using 20mm nominal graded size crushed metal as Courase aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. For Chajjas 0.05m thick

9

1265

11390.94

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Providing VRCC M25 grade Nominal mix using 20mm nominal graded size crushed metal as Courase aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. For Lintels

1.29

14259

18395.26

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Providing VRCC M25 grade Nominal mix using 20mm nominal graded size crushed metal as Courase aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. For Roof Slab 125mm thick

229.13

1647

377578.74

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Providing VRCC M25 grade Nominal mix using 20mm nominal graded size crushed metal as Courase aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. For Roof Beams

9.22

13641

125772.23

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Providing VRCC M25 grade Nominal mix using 20mm nominal graded size crushed metal as Courase aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. For Steps

0.64

13641

8730.39

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Providing VRCC M25 grade Nominal mix using 20mm nominal graded size crushed metal as Courase aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. For Waist Slab 150mm thick

10.8

1869

20186.06

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Providing VRCC M25 grade Nominal mix using 20mm nominal graded size crushed metal as Courase aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. For Columns

9.58

14405

138002.87

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Providing VRCC M25 grade Nominal mix using 20mm nominal graded size crushed metal as Courase aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. For Plinth Beams

9.22

14862

137034.28

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Providing VRCC M25 grade Nominal mix using 20mm nominal graded size crushed metal as Courase aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. For Footings for columns

12.76

11549

147377.87

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Supply, collection and filling of gravel for sides of Foundation and inside basement including cost and conveyance of all materials and labour charges for filling watering, consolidation with hand roller rolling etc., complete as directed by the officer incharge of work.

71.29

630

44968.31

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Filling with useful excavated soil (excluding rock) in trenches, sides of foundations with initial lead in layers not exceeding 150mm thick, compacting each deposited layer by watering and ramming including cost of water to work site and all operational, incidental, labour charges, overhead charges & contractors profit etc., complete for finished item of work but excluding GST and seignorage charges

85.51

42

3607.67

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Providing & laying of PCC 1:3:6 prop. Nominal mix using 40 to 10mm size crushed metal as coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate and 43 grade OPC, mixing mechanically, placing vibrating including cost & conveyance of all materials, form work charges and labour charges, overhead charges, contractor profit, seigniorage charges but excluding GST etc., complete, in Basement

10

5982

59825.8

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Providing & laying of PCC 1:3:6 prop. Nominal mix using 40 to 10mm size crushed metal as coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate and 43 grade OPC, mixing mechanically, placing vibrating including cost & conveyance of all materials, form work charges and labour charges, overhead charges, contractor profit, seigniorage charges but excluding GST etc., complete, in Foundation

12

5656

67875

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Filling foundations with cement concrete (1:5:10) Prop. Using 40 mm gauge (HBG) metal including cost and conveyance of all materials to site of work, labor charges, shoring, strutting, machine mixing and laying of concrete, compacting including curing etc., complete

34.42

5723

196989.79

... More
Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula;Construction of New Regional Office Building for Warangal Region at TGSWC Enamamula (V & M), Warangal District: GROUND FLOOR: Earthwork in excavation for Foundation and depositing on bank with initial lift and an initial lead of 10m including shoring, sheeting, planking, strutting and all operational, incidental, labour charges by excluding GST etc., complete excluding dewatering in all types of Soil - by mechanical means - upto 3 m depth

107.57

89

9661.94



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.