Roads And Buildings Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 2,00,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
551479Tender No
CE(R&B), SR & CRN, NIT No. 1606-6/DCE(R)/EE-R/DEE-III/AEE-V/2024-25/NLG/2, Dt: 15.10.2024Tender Authority
Roads And Buildings Department ViewPurchaser Address
-Website
http://http://www.rnbgujarat.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Bridge work;Plain Vibrated Cement Concrete M20 Mix in Foundations using 40 mm, 20mm and 10mm size HBG (ss5) graded M/c metal ( Coasre aggregate confirming to table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental charges and all other operational charges of all T & P required etc. complete as per drawings and technical specifications & as per MoRT&H Spcn. No 1500, 1700, 2100 (5th revision)for footings of abutmentsPiers, cut-off walls and Wing walls below sill Level - Bridge Proper
416
7360
3061760
Bridge work;Plain Vibrated Cement Concrete M20 Mix in Substructure using 40 mm, 20mm and 10mm size HBG (ss5) graded M/c metal ( Coasre aggregate confirming to table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental charges and all other operational charges of all T & P required etc. complete as per drawings and technical specifications & as per MoRT&H Spcn. No 1500, 1700, 2100 (5th revision) for sub structureof abutments and Wing walls below sill Level up to 5.0m height- Bridge Proper
293
7785
2281005
Bridge work;Vibrated Reinforced Cement Concrete M25 Mix in sub structure using 20mm and 10mm size HBG (ss5) graded M/c metal ( Coasre aggregate confirming to table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental charges and all other operational charges of all T & P required etc as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item complete as per drawings and technical specifications & as per MoRT&H Spcn. No 1500, 1700 & 2200 (5th revision)for Abutmnet bed blocks & backing walls, pier bed blocks sub structure - 5.0m height- Bridge Proper
17
8324
141508
Bridge work;V.R.C.C concrete M -30 grade for Super Structure with 20 mm & 10mm (SS5)HBG M/C graded metal ( Coasre aggregate confirming to table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental charges and all other operational charges of all T & P required etc as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item complete as per drawings and technical specifications & as per MoRT&H Spcn. No 1500, 1600 & 1700 (5th revision)as per MOST Drg. No: SD/114 - up to 5.0m height- Bridge Proper
107
9171
981297
Bridge work;V.R.C.C concrete M -30 grade for Super Structure with 20 mm & 10mm (SS5)HBG M/C graded metal ( Coasre aggregate confirming to table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental charges and all other operational charges of all T & P required etc as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item complete as per drawings and technical specifications & as per MoRT&H Spcn. No 1500, 1600 & 1700 (5th revision)as per MOST Drg. No: SD/114 - 5.0m-10m height- Bridge Proper
213
9553
2034789
Bridge work;Reinforced Cement Concrete M30 for Approach Slab with 20 mm & 10mm (SS5)HBG M/C graded metal ( Coarse aggregate confirming to table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental charges and all other operational charges of all T & P required etc as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item complete as per drawings and technical specifications & as per MoRT&H Spcn. No 1500, 1600 & 1700 & 2704 (5th revision) as directed by Engineer-in-Chrge for approach slab - Bridge Proper
29
7742
224518
Bridge work;V.R.C.C. M30 grade concrete with 20 mm & 10mm (SS5) HBG M/C graded metal (Coasre aggregate confirming to table 1000-1 and fine aggregate confirming to table 1000-2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, vibrating, finishing curing including all other incidental charges and all other operational charges of all T & P required etc as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item complete as per drawing BD/1-69A and technical specifications & as per MoRT&H Spcn. No 1500, 1600 & 1700 & 2702 (5th revision)as directed by Engineer-in-Charge for wearing coat over deck slab - Bridge Proper
32
7757
248224
Bridge work;Plain Vibrated Cement Concrete M15 Mix using 40mm HBG (SS5) graded M/C metal including cost and conveyance of all materials, centering, machine mixing, laying, vibrating, finishing curing including hire and operational charges of all T&P etc., and including island formation and diversion of flow of water, if necessary etc., complete for Levelling course below approach slab as per drawings and technical specifications & as per MoRT&H Spcn. No 2700 - Bridge Proper
8
6565
52520
Bridge work;Vibrated Reinforced cement concrete in super structure complete as per darwing and techincal specifications as per MORT&H specification nos 1500,1700 & 2200 VRCC M-40 for Crash barriers excluding cost of steel and its fabrication charges as per approved drawing - Bridge Proper
27
8925
240975
Bridge work;Providing HYSD bars (Fe-500) from primary producers like TATA, SAIL VSP, JSW & Shyam Steel as approved by Ministry of Steel of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinfircemnet including cutting, bending, binding roads, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., including over lapping, welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings as per the directions of the Engineer-in-Chrage and as per MoRT&H spn. 1600 & 2200 (5th revision) and as per I.S:1786 of 1985 for foundations - Bridge Proper
4
90386
361544
Bridge work;Providing HYSD bars (Fe-500) from primary producers like TATA, SAIL VSP, JSW & Shyam Steel as approved by Ministry of Steel of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinfircemnet including cutting, bending, binding roads, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., including over lapping, welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings as per the directions of the Engineer-in-Chrage and as per MoRT&H spn. 1600 & 2200 (5th revision) and as per I.S:1786 of 1985 for sub structure - Bridge Proper
5
90716
453580
Bridge work;Providing HYSD bars (Fe-500) from primary producers like TATA, SAIL VSP, JSW & Shyam Steel as approved by Ministry of Steel of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinfircemnet including cutting, bending, binding roads, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., including over lapping, welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings as per the directions of the Engineer-in-Chrage and as per MoRT&H spn. 1600 & 2200 (5th revision) and as per I.S:1786 of 1985 for super structure - Bridge Proper
29
93000
2697000
Bridge work;Providing Grouted Revetment with rough stone (HBG) of not less than 300 mm size grouted with 0.20 cum of CC (1:4:8) including cost and conveyance of materials to site and including labour charges for packing the stones for revetment etc., complete for finished item of work as per MoRT&H specification 2504 ( 5th revision ) and as directed by the Engineer-in-Charge for quadrantial revetment - Bridge Proper
36
2928
105408
Bridge work;Pitching with 300 mm size rough stone including cost, and conveyance of materials to site and including labour charges for packing the stones for revetment etc., complete for finished item of work as per MoRT&H specification 2504 ( 5th revision ) and as directed by the Engineer-in-Charge for Pitching of slopes for Toe wall - Bridge Proper
13
1952
25376
Bridge work;Providing and laying filter material with selected earth underneath pitching in slopes including cost, and conveyance of materials to site including labour charges etc., complete for finished item of work as per MoRT&H Specification 2504 (5th Revision) and as directed by the Engineer-in-Charge under Revetment - Bridge Proper
18
275
4950
Bridge work;Back filling behind Abutments with selected earth including cost, conveyance and of all materials to site etc., complete as per Clause 710.1.4 of IRC : 78 and as per MoRT&H Specification No. 2200 (5th Revision) and as per Drawing and technical specifications for finished item of work - Bridge Proper
123
275
33825
Bridge work;Providing filter media with granular material/ crushed stone aggregates satisfying the requirements laid down in clause 2504.2.2 of MORT&H (Rev. V) specifications to a thickness of not less than 600mm with smaller size towards the soil and bigger size towards wall and provided over the entire surface, behind abutment, and return wall to the full height and compacted to a firm condition complete as per drawing and technical specifications as per MORT&H Spcn. No. 2200 and as per Clause No of 710.1.4 of IRC 78 - Bridge Proper
141
2213
312033
Bridge work;Providing weep holes in Brick masonry/Plain/Reinforced concrete Abutment/wing wall/Return wall with 100mm dia meter A/C pipe extending through the full width of the structure with slope of about 1 V : 20H towards drawing face Complete as per drawing and technical specification, complete for finished item of work for weep holes as per MORTH specification No 2706 & 2200 (5th Revision) - Bridge Proper
123
473
58179
Bridge work;Supplying and fixing of C I drainage spouts complete as per MOT Drg No SD/ - Bridge Proper
6
1428
8568
Bridge work;Providing 25.4 mm mastic pads for longitudinal joints, Transverse expansion joints and construction joints of approved quality including cost of conveyance and placing in position etc., as directed by the engineer in charge - Bridge Proper
77
1186
91322
Bridge work;Forming embankment with borrowed useful earth (Selected earth with a lead of 10.0km) from outside road boundary by mechanical means upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P, complete for finished item of work as per MoRT&H specification 305 (5th revision) (Payment will be made based on level for finished item of work). For Shoulder only - Approaches
5800
297
1722600
Bridge work;Construction of Granular sub-base by providing HBG material confirming to Grading-VI of MoRT&H Table 400-1 including cost and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator/approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge. (Payment will be made based on levels for finished item of work ) - Approaches
928
2289
2124192
Bridge work;Providing, Laying, Spreading for a compacting graded HBG crushed stone aggregate to Wet Mix Mecadam specification including premixing the material with water at OMC in mechanical mix plant carrige of mixed material by tipper to site, laying in uniform layers with paver in base course on well prepared surface and compacting with Vibratory roller to achieve the desired density etc., as derected by the Engineer-in-charge and as per MORT&H specification 406 (5th revision) for finished item of work.(Payment will be made based on levels for finished item of work) - Approaches
626
2556
1600056
Bridge work;Providing and applying Prime coat with bitumen Emulsion (Slow setting/Bulk) using emulsion pressure distributor at a rate of 0.70kg/sqm on a prepared surface of granular base including cleaning of road surface, the finished item of work as per MoRTH specification 502 (5th revision) - Approaches
2401
36
86676
Bridge work;Providing and applying tack coat with bitumen VG-10 grade using bitumen pressure distributor at the rate of 0.20 kgs per sqm on the prepared bituminous/granular surface cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge - Approaches
2401
12
29052
Bridge work;Providing and laying 30mm compacted Bituminous Concrete with 100-120 TPH batch type hot mix plant/40-60TPH hot mix plant using HBG crushed aggregates of Grading-3 as per table 500-7 of specification 507 of MoRTH (5th revision), premixed with bitumen VG-30 grade @ 5.4% of mix and filler including cost and conveyance of all materials to work site and transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandom rollers to achieve the desired compaction as per MoRTH specification 507 (5th revision) complete and as directed by the Engineer-In-Charge - Approaches
73
10244
747812