Panchayat Raj Engineering Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Panchayat Raj Engineering Department Tender

Works
Civil And Construction
Building Construction
Opening Date23 Nov 2024
Closing Soon3 Dec 2024
Tender Amount₹ 15,72,228 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Building;S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal / external threaded connection conforming to IS 8931

3

312

937

... More
Building;Providing & placing on Terrace polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and overflow pipes but without fittings & base support for tanks.( From SSR rates sno 311) 2000lts

2000

11

22720

... More
Building;Supply and fixing of Ashirvad / Ajay / Astral Flowguard or equivalent CPVC pipes and fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper tubes of size 1/2" ton 2" Ashirvad Flowguard) and SDR 11 pipes are made from idential CPVC compounds having the same physical properties for Hot and cold water (IS 15778:2007) including labour charges for fixing of CPVC / PPR Pipes etc., complete for (28.60mm OD Pipes - SDR 11)

30

402

12066

... More
Building;Supplying & Fixing of Indian Pattern White Glazed 1st Quality of ISI Orissa Pan with "P" or "S" trap Hindware / Parryware / Neycer - ISI Mark 630x450 mm including cost and conveyance of all materials and labour charges etc., complete

1

2502

2503

... More
Building;Supply and Fixing of Batten holder / slanting holder in lieu of ceiling rose of light point complete with all connections and all labour charges with 40W bulb (for new installation)

8

118

950

... More
Building;Supply and Transportation of 1x36/40W box type tube light luminaire with copper / VPIT Choke, condensor, starters etc., and 1No 36/40W tube etc., complete.

8

527

4223

... More
Building;Supply, Transportation and Fixing of energy efficient fan, 1200 mm sweep, aluminium body, consuming 28 W, BEE 5 star rated, ceiling fan with Brush Less Direct Current(BLDC)motor, class of insulation: B, 3 no's blades, 30 cm long down rod, 2 no's canopies, shackle'kit, safety rope, copper winding, Power Factor greater than 0.90, Service Value (CMMAV) greater than 8.5, Air delivery minimum 235 CMM, 350 RPM (tolerance as per IS:374-2019), THD less than 10%. with remote or compatible to electronic step type regulator unit for speed control and all remaining accessories including safety pin, nut bolts, washers, temperature rise=75 degree C(max), insulation resistance more than 2 mega ohm, suitable for 230V, 50 HZ, single phase AC supply, earthing etc., including allstandard accessories etc., complete. Makes : Atomberg (Efficio ) / Havells / Orient

8

3695

29565

... More
Building;Providing independent earthling by excaGSTing a trench to a depth of 2.1 M in all soils, as per size specified in the Data, using 40mm dia B class GI pipe of 2.5 Mtrs length with necessary accessories with hume pipe ring duly providing staggered holes including filling with equal proportion of Salt and Charcoal in layers and all labour charges etc., complete for small quarters.

1

5255

5256

... More
Building;Supply and fixing SPN Distribution board with IP-20 protection suitable for single phase Earth Leakage Circuit Braker (ELCB) / Residual Current Circuit Braker (RCCB) / Double Pole (DP) Isolator as incomer and 10kA SP MCBs as out ging including internal connections and labour charges for surface / flush mounting etc., complete.

1

6687

6687

... More
Building;Supply and Run of 2 of 36/0.3mm (2.50 Sq.mm) FRLS PVC insulated 1100V grade as perIS:694/1990 specification for Copper cable with Run 1 of 14/0.3mm(1.0Sqmm) FRLS PVC insulated 1100Vgrade as perIS:694/1990 specification for Copper cable including cost and conveyance of all material and labour chages but excluding GST

70

152

10672

... More
Building;Supply and fixing of Mini Modular Stepped type Electronic Regulator with Cover Frame with fixing accessories etc., including labour charges complete as required confirming to IS.(independent)

8

488

3908

... More
Building;Supply and fixing of 6A ISI mark Flush type switch with 6A 3/2 pin wall plug socket on a common switch board with earth connections in surface / consealed wiring including cost and conveyance of all materials and labour charges but excluding GST

10

161

1619

... More
Building;Wiring with run of 2 of 22/0.3mm (1.50 Sq.mm) FR / FRLS PVC insulated flexible ISI mark copper cable in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including cost and conveyance of all material and all labour charges but excluding GSTetc., complete for light, bell, fan and exhaust fan points including cost and conveyance of all material and labour charges but excluding GST

22

819

18026

... More
Building;Supply and Laying of 25mm outer dia heavy (2.20mm thickness) grade with IS:9537 part 3 regid PVC pipe of makes Sudhakar / Maco Plast / Modi. make concealed in Roof Slabs with all required PVC / Metallic Deep Boxes including masonary work and labour charges etc., complete including masonary work, including cost and conveyance of all material, all labour charges, and contractor profit etc., complete but excluding GST

41.9

101

4265

... More
Building;Supply and laying of 25mm dia 1.8mm thick P.V.C.pipe ISI mark of Sudhakar / Maco Plast / Modi make concealed in wall with PVC / Metallic junction boxes and all required accessories including masonary work for light, fan and separate plug point with supply and fixing of suitable size Metallic deep box including all labour charges etc., complete including masonary work, including cost and conveyance of all material, all labour charges, and contractor profit etc., complete but excluding GST

25

120

3007

... More
Building;Providing high yield strength deformed (HYSD) steel bars (Fe 500 grade as per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and Countryes & other taxes,on cost of all materials complete for finished item of work (APSS No.126) in all floors.

2.69

72770

195434

... More
Building;Painting to New Iron work with two coats of ready mixed synthetic enamel paint first quality all shades over an existing steel primer including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).in All Floors

16.56

112

1868

... More
Building;Providing and applying synthetic plaster putty or plaster of paris putty or lime punning of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for Internal walls Providing Putty to internal walls

215.16

234

50358

... More
Building;Painting to new walls with 2 coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 30 grams/ Litand shade over Priming Coat with Cement Primer Waterbase Interior Gr-1 Asian/ Berger/ Nerolac/ Saicoat/Indocem or Equivalenton New Plastered Surfaceafter thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges but excluding GSTetc, complete for finished item of work as per SS 912 for external walls.

189.12

266

50354

... More
Building;Painting to new walls with 2 coats of acrylic emulsion paint interior grade having VOC (Volatile Organic Compound) content less than 30 grams/ Litand shade over Priming Coat with Cement Primer Waterbase Interior Gr- 1 Asian/ Berger/ Nerolac/ aicoat/ Indocem or quivalenton New Plastered Surfaceafter thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges but excluding GST etc, complete for finished item of work as per SS 911 for internal walls

215.16

200

43233

... More
Building;Providing Mild steel flats and bars for fabricating steel works like Window Grills, Compound Wall Grills, Iron Doors, Windows including cost of welding rods, power charges, including cost of fixing in position as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, all operational, incidental, and labour charges such as cutting, bending, placing in position etc., but excluding GSTfor finished item of work (APSS No.126) in all floors. For window grills, staircase railing & Compound wall grills etc

645.84

121

78515

... More
Building;Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) 3 track sliding windows with mesh shutter provision ? (only 2-glass shutters) duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of (80 mm x 52 mm)/ (94 mm x 45 mm) x2.20 mm for outer frames, (54 mm x 38 mm)/(39mm x 58 mm) x 2.20 mm for sliding shutterframes capable of mounting single glazingsystem, structurally reinforced with hot dip galvanized up to 50 microns of minimumthickness of 1.0/1.2 mm prefabricated & weldedthrough fusion welding. The window sash shallbe fitted with 5 mm thick clear float glass ofreputed make duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be coextrudedwith Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories,labour charges for transportation, erection at site complete for finished item of work

10.49

7266

76229

... More
Building;Supplying and fixing of 28/30 mm thick Wood Plastic Composite (WPC) Door shutter,comprising of 70% virgin polymer, 15% wood powder (fibre), and the remaining 15% additives,comprising of virgin PVC polymer of K value 58-60 (Suspension grade), Calcium carbonate and natural fibres (wood powder) and nontoxic additives (maximum toxicity index of 12 for 100 gms) having minimum door density of 650 kg/cum, screw withdrawal strength 1800N (Face) & 900N (Edge), Modulus of Elasticity 900N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixed in position with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk SS screws all as per direction of Engineer -in- Charge (SS butthinges and SS screws shall be paid separately)

1

5328

5329

... More
Building;Providing and fixing factory made solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fast.

1

4458

4459

... More
Building;EXTERNAL DOOR (SINGLE SHUTTER): 1.05X 2.10 M: Supplying, Positioning and fixing of ISI mark, standard make Flush door shutters, solid bond wood block board type with teak veneer on one face and commercial ply on another face (lipping): 30 mm thick conforming to IS:2202 exculding door frame , including 3 nos. of 150 mm butt hinges, 1 nos. door stoppers, 2 nos. 150 mm long door handles, 1 nos. aldrop of size 300 mm long, 1 nos. of 300 mm long tower bolts with bolts,1 no latches nuts, and screws including cost and conveyance of all materials to site,labour charges for fixing the shutter etc., including minor on fan light portion extra fixtures required if any as directed by the engineer-in-chrge of the work complete for finished item of work. (all fittings and fixtures should be of stainless steel, ISI mark, got approved by the engineer-in-charge) (apssno:1001&1002).

3

9430

28292

... More
Building;Supply and fixing of Medium teak wood door frame of size 1.2x2.10m made of well Medium teak wood scantlings of size 100 x 65mm as per approved design with fixtures of 6 nos of 9" ' z" holdfasts,with necessary screws complete including cost and conveyance of all materials and labour charges etc. complete as per specifications (APSS NO.1001 & 1002) including 13.615% over head charges and contractors profit.

3

4787

14364

... More
Building;Providing dadooing to walls with 5 to 7mm thick ceramic wall tiles 1st quality of 7.30mm and of size approved by Engineer-in-Charge, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including over heads & contractor profit, cost of all materials like tiles, cement, sand and water etc., complete including complete for finished item of work, but excluding GST and seignorage charges.

6.84

856

5860

... More
Building;Flooring with Ceramic non skid tiles 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs laid over floor bed /VRCC slab set over 12.0 mm th.in CM (1:8 ) prop. base coat and neat grey cement slurry of honey like consistence spread at the rate of 3.3 kg of cement per Sqm and jointed with neat white cement paste mixed with pigment of matching shade including cost and conveyance of all materials to site, including cost of mixing of mortar and watering, leveling to proper slope and curing including over heads & contractor profit, all labour charges etc., and excluding GST and seignorage charges for finished item of work but excluding cost of CC bed and dadoing to walls

2.65

1082

2873

... More
Building;BLD-CSTN-9-23-(121): Providing skirting to internal walls to 15 cm height/risers of steps with 15 to 18 mm thick polished Shahabad stone length equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like Shahabad stone, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials

6.04

529

3198

... More
Building;BLD-CSTN-9-1-(99) : Flooring with Polished Shabad stones 1st class 15 to 18 mm thick (Tandur Stone slabs) set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones etc., complete, including seigniorage charges, labour charges for dressing of flooring stones etc., complete for finished item of work, but excluding the cost of conveyance of all materials.

48.72

780

38045

... More
Building;Plastering 20 mm thick in two coats with base coat of 16 mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, Countryes & other taxes on all materials, all operational, incidental and labor charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904) For External walls

189.12

482

91254

... More
Building;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, Countryes & other taxes on all materials, all operational, incidental and labor charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904) For Internal walls

151.48

469

71149

... More
Building;Ornamental plastering to ceiling 12mm thick in CM (1:3) with dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, Excluding seigniorage charges,Including, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, finishing, scaffolding, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc., complete for finished item of work.(APSS 901& 903 )

63.67

197

12596

... More
Building;Providing impervious coat over RCC roof slab to required slopes with CM (1:3) prop. 20 mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1Kg/bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, laying, rounding off at junctions of wall and slab, rendering smooth with thread lining, curing, lift charges, etc., complete for finished item of work (APSS No. 901 & 903). for Ground floor

52.85

518

27395

... More
Building;BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of Seigniorage charges on all materials, including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work

24.22

8588

208038

... More
Building;Supply and placing of the Design Mix Concrete M20 corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work.-Lintels GF

0.39

13100

5109

... More
Building;Supply and placing of the Design Mix Concrete M20 corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work.-Roof Slab 125mm thick Ground Floor

56.45

1451

81929

... More
Building;Supply and placing of the Design Mix Concrete M20 corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work.-Roof Beams GF

7.54

12163

91709

... More
Building;Supply and placing of the Design Mix Concrete M20 corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work.-Plinth beams

4.47

12656

56573

... More
Building;Supply and placing of the Design Mix Concrete M20 corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work.-Columns GF

2.42

12883

31179

... More
Building;Supply and placing of the Design Mix Concrete M20 corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work.-Pedastals for all

1.09

10308

11237

... More
Building;Supply and placing of the Design Mix Concrete M20 corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For Footings

3.89

9682

37667

... More
Building;Supply and filling of gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310) including cost and conveyance of all material and labour charges, and contractors profit & over heads but excluding seignorage charges and GST etc., complete.

23.54

389

9180

... More
Building;Supply and filling of earth (ordinary soil) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310) including cost and conveyance of all material and labour charges,and contractors profit & over heads but excluding seignorage charges and GST etc., complete.

27.6

189

5229

... More
Building;Construction of RR Masonry in CM (1:6) Cement: Sand) using hard granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site including cost and conveyance of all material and all operational, incidental, and labor charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., and including over heads & contractor's profit, but excluding GST and seigniorage charges complete for finished item of work for foundation and basement (APSS No. 601 & 615)

12.23

4063

49691

... More
Building;Plain Cement Concrete of (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size HBG M/c (SS5) metal with concrete mixture including cost and conveyance of all materials like cement, sand(unscreened), coarse aggregate, water etc. to site, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, overhead charges & Contractors profit etc., complete but excluding GST & seigniorage charges, sales & other taxes on all materials,for finished item of work (APSS No. 402).

8.39

4100

34391

... More
Building;Plain Cement Concrete of (1:4:8:) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size HBG M/c (SS5) metal with concrete mixture including cost and conveyance of all materials like cement, sand(unscreened), coarse aggregate, water etc. to site, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, overhead charges & Contractors profit etc., complete but excluding GST & seigniorage charges, sales & other taxes on all materials,for finished item of work for Foundations (APSS No. 402).

2.46

4284

10541

... More
Building;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308) including cost and conveyance of all material and labour charges, and contractors profit & over heads but excluding seignorage charges and GST etc., complete.

44.01

237

10465



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.