Municipality Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipality Tender

Works
Civil And Construction
Drainage Work
Opening Date9 Jul 2024
Closing Date12 Jul 2024
Tender Amount₹ 8,39,750 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Laying of CC Road and Construction of CC Drain at ward No.11;BLD-CSTN-3-7-(24) Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

4.08

5449

22232.12

... More
Laying of CC Road and Construction of CC Drain at ward No.11;Plain Cement concrete (1:2.5:5) using 20 mm metal with concrete mixer. All work upto plinth level including cost and conveyance of all labour and materials charges etc., complete for finished item of work-For Walls

10.2

6927

70661.5

... More
Laying of CC Road and Construction of CC Drain at ward No.11;Plain Cement concrete(1:2.5:5) using 20 mm metal with concrete mixer. All work upto plinth level including cost and conveyance of all labour and materials charges etc., complete for finished item of work-For Flooring & Culvert ramps.

2.81

6523

18329.99

... More
Laying of CC Road and Construction of CC Drain at ward No.11;Plastering with CM (1:3), 12 mm thick including cost and conveyance of all labour and materials charges etc., complete for finished item of work

61.2

218

13392.75

... More
Laying of CC Road and Construction of CC Drain at ward No.11;RCC (M20) Prop. with 20mm size Hard granite machine crushed graded metal including cost and conveyance of all materials, centering charges labour charges curing and removing centering etc., but encluding cost of steel and its fabrication charges complete. Slab 230mm.thick-Culvert Slab

15.57

7968

124074.85

... More
Laying of CC Road and Construction of CC Drain at ward No.11;Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded

2802.6

90

254700.29

... More
Laying of CC Road and Construction of CC Drain at ward No.11;Carting excavated earth from the site or work within a distance of 1 km. Including loading and unloading directed by the Municipal Engineer -80 % Of EW Qty

26.11

1248

32595.72



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.