Municipal Corporation Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
495144Tender No
Nit.No.196/CRZ/epro/GHMC/23-24Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.ghmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Estimate for the Development and maintenance of;Cost and supply of water @ 5 Ltrs / plant in each watering on non rainy days, through water tanker of 5000 Ltrs capacity alternate days (5 trips per day - 25000 Ltrs) (656 x 5 x 180 Days / 25000 = 23.62)
23.62
3352
79167.92
Estimate for the Development and maintenance of;Replacement of causalities to a maximum of 10% of the planted, including re-opening of pits, transport of plants internal transport and planting. (4"x7" / 6"x8" Tall plants)
65.6
789
517.66
Estimate for the Development and maintenance of;Application of chemicals and fertilizers/Neem Cake etc
656
293
1928.18
Estimate for the Development and maintenance of;Cost of preparation of stakes (1.00m length)and transportation to site
656
6
3936
Estimate for the Development and maintenance of;Planting of bag plants after refilling the pits/support sticks (4"x7" / 6"x8"/5"x9") bags
656
154
1010.31
Estimate for the Development and maintenance of;Cost of Chemicals and fertilizers @ 20gms/pit/dose (2 doses)
1
-
656
Estimate for the Development and maintenance of;Internal transport of bag plants to planting site 4x7 bags
656
95
624.38
Estimate for the Development and maintenance of;Transportation of plants from nursery site to planting site upto a lead of 3km including loading and unloading wherever departmental vehicles are not provided (4"x7" / 6"x8") * If department vehicle is used only loading and unloading allowed (Tecoma gadichaudi / caesalpinia hardy plants)
656
269
1769.3
Estimate for the Development and maintenance of;Application of FYM 30cmt cube pit (176.76 / 8 = 22.09)
656
30
202.9
Estimate for the Development and maintenance of;Cost of the FYM (0.3x0.3x0.3=0.027 cmt) (1/8th of 0.1cmt)=2558.73/8
656
319
2098.15
Estimate for the Development and maintenance of;Application of Red soil 30cmt cube pit
656
30
202.9
Estimate for the Development and maintenance of;Importation of good quality red earth congenial for plant growth of light textured, crystalline, porous and friable, generally acidic or neutral but not alkaline, fertile, cost, transportation, loading, unloading etc complete 0.30mt pits (0.30 x 0.30 x 0.30 x 656 x 2 / 3 = 11.81)
11.81
1228
14506.13
Estimate for the Development and maintenance of;(B) SHRUB PLANTATION:Digging of pits of size 0.30x0.30x0.30 mts @ 0.1mtrs apart
656
1072
7038.42
Estimate for the Development and maintenance of;Engaging of water tankers for watering through tankers of 5000 ltrs each trip capacity ( 5 trips per day- 25000 ltrs) 237 x 20ltrs x 43/25000=8.2 tankers (July - November = 2x5 = (10) (December = 3 (Jan - Feb = 4x2 = (8) (March = 5 April-May= 6x2 = (12), June-= 5
8.15
3352
27330.63
Estimate for the Development and maintenance of;Replacement of casualities to a maximum of 20% of the planted, including re-opening of pits, transportation of plants, internal transport and planting (8"x12" / 9" x 11" Tall Plants) only after verification by the DUB for survivials replacements shall be taken up in the month of Oct. If any casualities during the year, the Contractor agency has to taken up the gap filling plantation to the extent of dead at his own cost and must show 100% survival
47.4
2261
1071.71
Estimate for the Development and maintenance of;Application of chemicals and fertilizers/Neem Cake etc (2 doses)
237
293
696.59
Estimate for the Development and maintenance of;Cost of Chemicals and fertilizers @ 20gms/pit/dose (2 doses)
1
-
474
Estimate for the Development and maintenance of;Application of Folidol/Lindane dust (10%) @ 20 gms/pit/dose (2 doses)
237
57
135.33
Estimate for the Development and maintenance of;Cost of Folidol/Lindane dust (10%) @ 20 gms/pit (@50gms per plant)
1
-
237
Estimate for the Development and maintenance of;Cost, transport and fixing of support sticks (Stick should be minimum 6ft Ht Above ground level after fixing and girth of 20 cm at Breast ht) and Loop tying to plants
237
17
4114.32
Estimate for the Development and maintenance of;Planting of bag plants after refilling the pits with FYM and soil and tightly packing with soil (10"x16" / 14" x 15" bag plants)
237
2139
5069.9
Estimate for the Development and maintenance of;Internal transporation of Bag plants to planting site
237
370
877.71
Estimate for the Development and maintenance of;Transportation of plants from nursery site to planting site upto a lead of 3 km including loading and unoading (10"x16" / 14" x 15" bag size)
237
861
2042.68
Estimate for the Development and maintenance of;Application of FYM including internal distribution in red soil areas 60 cm pit
237
103
246.3
Estimate for the Development and maintenance of;Cost and conveyance of well-decomposed Farmyard manure to planting site 60 cm cube (0.50 x 42% cft/pit =0.21 cft)
237
1074
2546.97
Estimate for the Development and maintenance of;Digging of pits 0.45 mt X 0.45 mt X 0.45 mt
237
2845
6742.67
Estimate for the Development and maintenance of;A)TALL PLNTS:(a) Raising Year:Alignment and staking including cost of stakes
237
97
230.1