Municipal Corporation Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Corporation - GHMC Tender

Works
Civil And Construction
Opening Date22 Nov 2024
Closing Soon28 Nov 2024
Tender Amount₹ 7,63,100 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Development of park;Laying and raimming of carpetgrass

180

58

10458

... More
Development of park;Regular watering and removal of weeds, protection etc for 45 days for initial establishment

180

9

1780.2

... More
Development of park;Planting of individual shrub/rose/ornamental Bamboo : Digging the pit of size 0.45x0.45x0.45 m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides (@ 20 gms/pit/sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material.

200

194

38814

... More
Development of park;Planting of individual shrub/rose/ornamental Bamboo : Digging the pit of size 0.60x0.60x0.45 m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides (@ 20 gms/pit/sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material.

50

344

17243.5

... More
Development of park;Hedge / shrub planting:Digging the trench of size 30 cm depth, refilling the trench with red soil including cost of red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides etc., (@ 20 gms/pit/sqmt) complete but excluding the cost of the fertilizers(@ 20 gms/pit/sqmt) and plantmaterial.

65

756

49171.85

... More
Development of park;Add 18% GST

1

-

36461.8

... More
Development of park;III) MAINTENANCE : - Maintenance of Lawn, Mannaual watering (1) Watering the lawns@10 liters / Sqm. / day basing on the season and weather conditions (sub soil moisture shall be maintained contionously). The watering shall be carried out DAILY during non rainy days. (2) Lawn mowing and edging of the lawns in the following frequency. Keeping the lawn grass blade not more than 2 cm. (i) June to November - once in 15 days (ii) December to May - once in 30 days. (3) Edging of the lawns in such a way that the lawn grass do not penetrate innto the plants and in a defined perfect geaometric shapes or smootha curves. (4) Keeping the lawns in lush green & weed - free condition. (5) Application of fertilizers, insecticides, Fungicides etc. (a) With manual watering. (b) With Drip / Sprinklers system. (12) Months =180 X 924.112/100 X 12 = 19960.82

180

924

19960.82

... More
Development of park;Maintenance of hedge / shrub planting:i)Trimming of hedges / shrubs once in 15 days. ii) Watering hedges / shrubs once in a day @ 5 litres / per Sqmts / per day (sub soil moisture shall be maintained continuously). iii). Formation of basins 1 ft. away from the hedge. iv)Application of fertilizers, insecticides, Fungicides (@ 20 gms/pit/sqmt) etc., for (12) months =65 X 4103.11/100 X12 months =32004.26

65

2930

22860.16

... More
Development of park;Maintenance of individual shrubs, rose plants, topiary, ornamental bamboo and palms etc i) Trimming once in 15 days.(ii)Watering once in a day @ 5 litres / per plant / per day (sub soil moisture shall be maintained continuously). The watering shall be carried out DAILY during non rainy days. (iii) Formation of basins for each and every plant upto 1 ft. away from the plant. (iv) Application of fertilizers, insecticides, Fungicides (@ 20 gms/pit/sqmt) etc.,(a)With Manual watering for 12 months =250 X 612.61/100X12= 18378.36

250

612

18378.36

... More
Development of park;Errection of Display of Name Boards with Iron angulars

1

15000

15000

... More
Development of park;Cost of Folidol dust (10%) @20grms/pit

25

35

875

... More
Development of park;Cost of chemicals and fertilizers @ 20gms/pit/dose (2 doses)

50

50

2500

... More
Development of park;Tools and implements ( Hose Pipes and other implements )

1

20000

20000

... More
Development of park;Banglore stone benches with back support

8

10700

85600

... More
Development of park;Laying of pre fabricatedAACbrick kerbing block size 0.60cmx0.30cmx0.10cm including cost and all material etc alinment 1;3 mortar

240

225

54120

... More
Development of park;Add 18% GST

1

-

43072.98

... More
Development of park;Sweeping & maintenance 1 person x 12 months ( Including ESI @ 3.25% , EPFO @ 13% per month )

180

728

131040

... More
Development of park;Cost of Carpet grass ( 180 x 10.76= 1937 sqmt)

1937

10

20454.72

... More
Development of park;Pisonia alba 8X10

300

65

19500

... More
Development of park;Acalypha red 8x10

300

40

12000

... More
Development of park;Duranta erecta 8X10

300

50

15000

... More
Development of park;Eranthimum 7x8

300

25

7500

... More
Development of park;tecoma gadichaudi 8x8

30

28

840

... More
Development of park;Pedilanthus verigated 7x8

50

25

1250

... More
Development of park;Veitchia Merrilli green 21x21

5

700

3500

... More
Development of park;Areca palm 15x16

25

120

3000

... More
Development of park;Draccaena mahatma 7x8

100

30

3000

... More
Development of park;Draccaena victoria 13x13

25

150

3750

... More
Development of park;Ixora singaporensis 13x13

25

100

2500

... More
Development of park;Allamanda bush 8x12

25

70

1750

... More
Development of park;Neerium dwarf 8x12

30

60

1800

... More
Development of park;Golden pandanus 7x8

100

35

3500

... More
Development of park;Song of india 8x10

10

45

450

... More
Development of park;Putranjiva 18x18

5

250

1250

... More
Development of park;Alocasia 13x13

5

125

625

... More
Development of park;Bamboo budda belli 13x13

20

150

3000

... More
Development of park;Fillicium 21x21

5

600

3000

... More
Development of park;Rose 8X10

20

70

1400

... More
Development of park;costus 7x8

30

50

1500

... More
Development of park;Misc

1

-

96



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.