Municipal Corporation Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Corporation - GHMC Tender

Works
Civil And Construction
Civil Works Others
Opening Date14 Nov 2024
Closing Date22 Nov 2024
Tender Amount₹ 35,88,634 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Raising of Median;Plastering 20mm thick in single coat in C.M. (1:4) with dubars sponge finishing including cost & conveyance of all materials like cement, Sand, Water, etc., to site , all operational, incidental charges, labour charges for mixing mortar, finishing, Scaffolding , lift charges, curing, including cutting grooves where ever necessary etc., complete for finished item of work for uneven surfaces of walls. {50% natural river sand + 50% rock sand}

690

297

205420

... More
Raising of Median;Centering and scaffolding charges including labour charges for errection and dismantling of shuttering and scaffolding for CC /RCC side walls -For Side Walls

552

393

216936

... More
Raising of Median;Supply and placing of the Ready Mix Concrete (RMC) M20 grade Standard Design Mix Concretegrade as per IS4926- 2003 with minimum cement content as per IScode456- 2000 using 20mm graded metal, from standard suppliers approved by the department including pumping, laying concrete, centering, shuttering vibrating / screed / pan vibrating, curing etc. complete but excluding cost of steel and its fabrication charges, for finished item of work. (M20-300Kgs) {50% natural river sand + 50% rock sand}

165.6

5094

843729

... More
Raising of Median;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308). Earth work excavation Ordinary Soil-Manual Means-Upto 3 m depth

34.5

293

10109

... More
Raising of Median;Cutting CC road surface including stacking of excavated materials for trench work using breakers. pg:453/546, ssr 22-23

124.2

2345

291249



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.