Municipal Corporation Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 32,970Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
538036Tender No
Nit.No.194/CRZ/epro/GHMC/23-24(7th Recall)Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.ghmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Estimate for the Development and Maintenance;Application of FYM including internal distribution in red soil areas 60 cm pit
5100
103
5300.02
Estimate for the Development and Maintenance;Transportation of plants from nursery site to planting site upto a lead of 3 km including loading and unoading (8"x12" / 9" x 11" bag size)
5100
542
27651.69
Estimate for the Development and Maintenance;Internal transporation of Bag plants to planting site
5100
370
18887.44
Estimate for the Development and Maintenance;Planting of bag plants after refilling the pits with FYM and soil and tightly packing with soil (8"x12" / 9" x 11" bag plants)
5100
2139
109099.2
Estimate for the Development and Maintenance;Cost, transport and fixing of support sticks (Stick should be minimum 6ft Ht Above ground level after fixing and girth of 20 cm at Breast ht) and Loop tying to plants
5100
17
88536
Estimate for the Development and Maintenance;Cost of Folidol/Lindane dust (10%) @ 20 gms/pit (@50gms per plant)
5100
-
5100
Estimate for the Development and Maintenance;Application of Folidol/Lindane dust (10%) @ 20 gms/pit/dose (2 doses)
5100
57
2912.1
Estimate for the Development and Maintenance;Cost of Chemicals and fertilizers @ 20gms/pit/dose (2 doses)
5100
-
10200
Estimate for the Development and Maintenance;Application of chemicals and fertilizers/Neem Cake etc (2 doses)
5100
293
14989.92
Estimate for the Development and Maintenance;Replacement of casualities to a maximum of 20% of the planted, including re-opening of pits, transportation of plants, internal transport and planting (8"x12" / 9" x 11" Tall Plants) only after verification by the DUB for survivials replacements shall be taken up in the month of Oct. If any casualities during the year, the Contractor agency has to taken up the gap filling plantation to the extent of dead at his own cost and must show 100% survival
1020
2261
23062.2
Estimate for the Development and Maintenance;Engaging of water tankers for watering through tankers of 5000 ltrs each trip capacity ( 5 trips per day- 25000 ltrs) 2945 x 10ltrs x 43/25000= 50.7 tankers (July - November = 2x5 = (10) (December = 3 (Jan - Feb = 4x2 = (8) (March = 5 April-May= 6x2 = (12), June = 5
87.72
3352
294063.76
Estimate for the Development and Maintenance;Protection, maintenance, watering, tending the plants, upkeep of fencing and removal of unwanted growth (12) months
5100
505
309090.6
Estimate for the Development and Maintenance;Thorny fencing with nearby available material around the plant
5100
10
51000
Estimate for the Development and Maintenance;Add GST 18%
1
-
154018.37
Estimate for the Development and Maintenance;Contingencies
1
-
33.43
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements