Municipal Corporation Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Corporation - GHMC Tender

Works
Agriculture or Forestry Works
Opening Date21 Aug 2024
Closing Date28 Aug 2024
Tender Amount₹ 13,18,800 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Estimate for the Development and Maintenance;Application of FYM including internal distribution in red soil areas 60 cm pit

5100

103

5300.02

... More
Estimate for the Development and Maintenance;Transportation of plants from nursery site to planting site upto a lead of 3 km including loading and unoading (8"x12" / 9" x 11" bag size)

5100

542

27651.69

... More
Estimate for the Development and Maintenance;Internal transporation of Bag plants to planting site

5100

370

18887.44

... More
Estimate for the Development and Maintenance;Planting of bag plants after refilling the pits with FYM and soil and tightly packing with soil (8"x12" / 9" x 11" bag plants)

5100

2139

109099.2

... More
Estimate for the Development and Maintenance;Cost, transport and fixing of support sticks (Stick should be minimum 6ft Ht Above ground level after fixing and girth of 20 cm at Breast ht) and Loop tying to plants

5100

17

88536

... More
Estimate for the Development and Maintenance;Cost of Folidol/Lindane dust (10%) @ 20 gms/pit (@50gms per plant)

5100

-

5100

... More
Estimate for the Development and Maintenance;Application of Folidol/Lindane dust (10%) @ 20 gms/pit/dose (2 doses)

5100

57

2912.1

... More
Estimate for the Development and Maintenance;Cost of Chemicals and fertilizers @ 20gms/pit/dose (2 doses)

5100

-

10200

... More
Estimate for the Development and Maintenance;Application of chemicals and fertilizers/Neem Cake etc (2 doses)

5100

293

14989.92

... More
Estimate for the Development and Maintenance;Replacement of casualities to a maximum of 20% of the planted, including re-opening of pits, transportation of plants, internal transport and planting (8"x12" / 9" x 11" Tall Plants) only after verification by the DUB for survivials replacements shall be taken up in the month of Oct. If any casualities during the year, the Contractor agency has to taken up the gap filling plantation to the extent of dead at his own cost and must show 100% survival

1020

2261

23062.2

... More
Estimate for the Development and Maintenance;Engaging of water tankers for watering through tankers of 5000 ltrs each trip capacity ( 5 trips per day- 25000 ltrs) 2945 x 10ltrs x 43/25000= 50.7 tankers (July - November = 2x5 = (10) (December = 3 (Jan - Feb = 4x2 = (8) (March = 5 April-May= 6x2 = (12), June = 5

87.72

3352

294063.76

... More
Estimate for the Development and Maintenance;Protection, maintenance, watering, tending the plants, upkeep of fencing and removal of unwanted growth (12) months

5100

505

309090.6

... More
Estimate for the Development and Maintenance;Thorny fencing with nearby available material around the plant

5100

10

51000

... More
Estimate for the Development and Maintenance;Add GST 18%

1

-

154018.37

... More
Estimate for the Development and Maintenance;Contingencies

1

-

33.43



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.