Municipal Corporation Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
493704Tender No
1268/DUB/GHMC/2023-24Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.ghmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Development of Greenery;Bed preparation : Dressing the surface to the desired shape, laying 4" layer of fine red soil, covered with a thin layer of sand watering, rolling with hand roller (2.5" thickness after rolling), including the cost of red earth, sand and labour charges etc. complete but excluding the cost of fertilizers, chemicals and grass.
160
222
35600
Development of Greenery;Carpet grass laying and ramming
160
58
9296
Development of Greenery;Digging the pit of size 0.30x0.30x0.30 m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides (@ 20 gms/pit/sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material.
500
56
28000
Development of Greenery;Digging the pit of size 0.45x0.45x0.45 m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides (@ 20 gms/pit/sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material. ( Individual-200 no's and Periperals- 100 no's)
100
194
19407
Development of Greenery;Maintenance of Lawns: Watering the lawns @ 10-15 ltr/Sqm/day basing on the season and weather conditions (Sub Soil moisture shall be maintained continuously) ii) Lawn moving and edging of the lawn in edging of the lawns in the following frequency, keeping the lawn grass blade not more than 2 cm 1) June to Nov - Once in 15 days. 2) Dec to May - Once in 30 days. 3) edging the lawns in such a way that the lawn grass do penetrate into the plants and in a defined perfect geometric shapes or smooth curves. 4) Keeping the lawns always in lush green & weed free condition. 5) Application of fertilizers, insecticides, fungicide etc., with manual watering for (12) months
160
924
17742.91
Development of Greenery;Maintenance of Individual shrubs: i) Trimming of shrubs once in 15 days ii) Watering to shrubs once in a day @ 5 litres / per plant / per day (sub soil moisture shall be maintained continuously) iii) Formation of basins for each and every plant upto 1 ft away from the plant iv) Application of fertilizers, insecticides, fungicides etc. a) with manual watering (for 12 months)
600
612
44107.92
Development of Greenery;Cost, supply and installation of back rest support Granite Benches including transportation, loading, unloading and labour charges completed etc., around the Park
8
10700
85600
Development of Greenery;Tools and implement & Hose pipes
-
-
10000
Development of Greenery;Cost, supply and installation of Name board 3 feet x 4 Feet
1
14675
15000
Development of Greenery;Cost of good quality korean / mexican/shade carpet grass turf of 2'X1' or 2'X2' size duly rolled and of atleast once moved, with grass blades not more than 1 cm. height, without pumps and tufts, uniform in colour and texture, devoid of weeds, to be delivered at twin cities (160 x 10.76 = 1721.6 or 1722 )
1722
10
18081
Development of Greenery;Plant materials
-
-
30000
Development of Greenery;GST 18%
1
66382
66382.8
Development of Greenery;Misc
1
42
42.84
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements