For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Corporation - GWMC Tender

Works
Civil And Construction
Drainage Work
Opening Date9 Oct 2024
Closing Date18 Oct 2024
Tender Amount₹ 24,34,323 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of CC Drains and Laying of Existing Damaged Construction of CC Drains and Laying of Exi;Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH.

126

2513

316690.92

... More
Construction of CC Drains and Laying of Existing Damaged Construction of CC Drains and Laying of Exi;Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with all lifts and lead upto 1000 m as per Technical Specification Clause 302.3 MORD / 301 MORTH

36

105

3807

... More
Construction of CC Drains and Laying of Existing Damaged Construction of CC Drains and Laying of Exi;Vibrated plain / reinforced cement concrete M 20 Grade Concrete using 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost and conveyance of all materials to site, seigniorage charges and all labour charges for machine mixing,laying in position, Compacting , Vibrating and curing including all other incidental and all other operational charges of T&P required etc., as per technical specification MoRT&H 1500,1700, 2100 (4th Revision), and 802, 803, 1202 and 1203 MORD complete for finished item of work

12.96

6757

87577.33

... More
Construction of CC Drains and Laying of Existing Damaged Construction of CC Drains and Laying of Exi;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 415 grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lapsplicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, laour charges such as cutting, bending placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.

1296

77

101075.04

... More
Construction of CC Drains and Laying of Existing Damaged Construction of CC Drains and Laying of Exi;Plain Cement concrete M15 (1:2:4) using ,20,10 mm metal with concrete mixture.

10.12

5301

53647.44

... More
Construction of CC Drains and Laying of Existing Damaged Construction of CC Drains and Laying of Exi;PCC 1:2:4 using 20 mm and 10mm for plain/reinforced concrete in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. for Side walls

104.86

5513

578111.01

... More
Construction of CC Drains and Laying of Existing Damaged Construction of CC Drains and Laying of Exi;BLD-CSTN-2-8 (16) : Filling with Stone dust in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

37.6

686

25816.91

... More
Construction of CC Drains and Laying of Existing Damaged Construction of CC Drains and Laying of Exi;Carting of the Exavated earth upto a lead upto 4-5 km beyond the initial lead of 1 Km from site including loadingand unloading as per the engineer in charge.

112.8

72

8211.84

... More
Construction of CC Drains and Laying of Existing Damaged Construction of CC Drains and Laying of Exi;Earthwork in excavation for as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH( PIPE LINE TRENCHES & DRAINS) Manual Means

225.6

297

67059.6

... More
Construction of CC Drains and Laying of Existing Damaged Construction of CC Drains and Laying of Exi;Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately.

15

1945

29175



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.