Municipal Corporation Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
495755Tender No
Nit.No.178/CRZ/epro/GHMC/23-24Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.ghmc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Estimate for the Development and Maintenanc;Engaging of water tankers for watering through tankers of 5000 ltrs each trip capacity ( 5 trips per day- 25000 ltrs) 480 x 20ltrs x 43/25000=16.51 tankers (July - November = 2x5 = (10) (December = 3 (Jan - Feb = 4x2 = (8) (March = 5 April-May= 6x2 = (12), June= 5
16.17
3352
54199.99
Estimate for the Development and Maintenanc;Replacement of casualities to a maximum of 20% of the planted, including re-opening of pits, transportation of plants, internal transport and planting (10"x16" / 14" x 15" Tall Plants) only after verification by the DUB for survivials replacements shall be taken up in the month of Oct. If any casualities during the year, the Contractor agency has to taken up the gap filling plantation to the extent of dead at his own cost and must show 100% survival
94
2261
2125.34
Estimate for the Development and Maintenanc;Application of chemicals and fertilizers/Neem Cake etc (2 doses)
470
293
1381.42
Estimate for the Development and Maintenanc;Cost of Chemicals and fertilizers @ 20gms/pit/dose (2 doses)
470
-
987
Estimate for the Development and Maintenanc;Application of Folidol/Lindane dust (10%) @ 20 gms/pit/dose (2 doses)
470
57
268.37
Estimate for the Development and Maintenanc;Cost of Folidol/Lindane dust (10%) @ 20 gms/pit (@50gms per plant)
470
-
493.5
Estimate for the Development and Maintenanc;Cost, transport and fixing of support sticks (Stick should be minimum 6ft Ht Above ground level after fixing and girth of 20 cm at Breast ht) and Loop tying to plants
470
28
13160
Estimate for the Development and Maintenanc;Planting of bag plants after refilling the pits with FYM and soil and tightly packing with soil (10"x16" / 14" x 15" bag plants)
470
2139
10054.24
Estimate for the Development and Maintenanc;Internal transporation of Bag plants to planting site
470
608
2859.67
Estimate for the Development and Maintenanc;Transportation of plants from nursery site to planting site upto a lead of 3 km including loading and unoading (10"x16" / 14" x 15" bag size)
470
861
4050.88
Estimate for the Development and Maintenanc;Application of FYM including internal distribution in red soil areas 60 cm pit
470
247
1163.08
Estimate for the Development and Maintenanc;Cost and conveyance of well-decomposed Farmyard manure to planting site 60 cm cube (0.50 cft/pit)
470
2558
12026.03
Estimate for the Development and Maintenanc;Digging of pits 0.60 mt X 0.60 mt X 0.30 mt
470
6761
31777.72
Estimate for the Development and Maintenanc;Raising:Alignment and staking including cost of stakes
470
97
456.32