Municipal Administration Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Administration Department Tender

Works
Civil And Construction
Pipe Line Project
Opening Date26 Feb 2024
Closing Date1 Mar 2024
Tender Amount₹ 4,08,534 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
laying of di pipe line;Lowering, Laying, jointing of PVC/HDPE/MDPE pipes as per BIS No.7634 part-III/75 for PVC and BIS No.7634 part-II/75 for HDPE pipes including earth work excavation, testing to hydraulic test pressure including cost of water with a water lead of 500m etc., complete, but excluding road cutting (BT/CC) charges., Complete.

50

48

2442.5

... More
laying of di pipe line;Manufacture, Supply & Delivery of MDPE pipe conforming to ISO 4427 Part-2 (or any equivalent Bureau of Indian Standards code) of PE-80 grade material along with all fittings, including cost of materials, manufacturing, loading, unloading, stacking, transit insurance, transportation to any where in Telangana but excluding GST.20mm dia

50

34

1722.5

... More
laying of di pipe line;Providing High Yield Strength Deformed (HYSD) / Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)

93.6

72

6776.64

... More
laying of di pipe line;BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level : Plain Cement concrete nominal mix M-20 (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nomonal reinforcement M 20 for Thrust Blocks

1.56

5986

9339.56

... More
laying of di pipe line;BLD-CSTN-6-4 Plastering with 12mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials to site, seigniorage charges on all materials, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903).

7.69

182

1404.96

... More
laying of di pipe line;BLD-CSTN-4-1-(34) Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126

42

85

3601.92

... More
laying of di pipe line;BLD-CSTN-3-13-(30)-C RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering . for RCC SLABS - 150mm thick

0.25

10340

2617.4

... More
laying of di pipe line;BLD-CSTN-2-11-Using Concrete mixture up to Plinth Level Plain Cement concrete nominal mix M-20 grade using 12mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work. for walls

1

7149

7149.68

... More
laying of di pipe line;Using Concrete mixture all works up to Plinth Level: Plain Cement concrete1:4:8 using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

0.22

4421

955.13

... More
laying of di pipe line;RBR-FNDN-1 : Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH for Valve Chambers by manual means upto 3 m depth

2.02

270

545.27

... More
laying of di pipe line;PHE-JCIF-5-: Jointing DI pipes, fittings and valves with flanged ends including cost of jointing materials such as bolts, rubber insertion, white lead including filling with water, with lead up to 500 meters and testing to required pressure complete. (Reference to specifications. BIS No.3114/1994.)

2

303

607.36

... More
laying of di pipe line;PHE-CISV-15 : Lowering, keeping in position and fixing D.I. sluice valves (with cap / with hand wheel & reflex valves) including cost of bolts, nuts, rubber insertion, sluice valve and tail pieces, 100mm dia di

1

212

212.45

... More
laying of di pipe line;Manufacture, Supply and delivery of DI D/F Gate Valves (Soft Seated) Resilient seated soft sealing gate valves (Sluice valves) with body bonnet of ductile cast iron of grade GGG40/SG- 400/15 or GGG-50/SG-500/7 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions, wedge fully rubber lined with EPDM food grade quality and seals of NBR and the valves should be of vacuum tight and 100% leak proof with face to face dimensions as per BS5163-89/IS14846-2000/DIN 3202 F 4. All the valves should be with Electrostatic powder coating both inside and outside pocket less body passage. Drilled as per IS:1538.DI. D/F Sluice valves of PN.16 class , 100mm dia di

1

14833

14833.23

... More
laying of di pipe line;Manufacture, supply and delivery of centrifugally cast (spun ) ductile iron fittings conforming to IS No. 9523/2000 having dimentions as per table. , zinc coated externally with inside mortor lining (with finishing as per class 13/IS 9523/2000 as per Code No 1 ) including transportation, taxes and duties etc.Tees,Flanged Sockets,Double socket bends

71

151

10779.93

... More
laying of di pipe line;PHE-JCIR-4: Jointing the C.I. Pipes, D.I. Pipes & fittings with Rubber Gasket including cost of the gasket, all sundries filling with water with a water lead upto 500 m and testing to required pressure etc., complete as per BIS No.3114/85.100mm dia di

35

271

9496.9

... More
laying of di pipe line;PHE-LCIS-1: Lowering C.I. / D.I. Pipes (all classes) and specials (fittings) with s/s ends carefully into trenches and laying them true to alignment and gradient including all sundries but excluding cost and conveyance of pipes from source of supply (Ref to specifications. BIS No.3114/1994)100mm dia di

190

53

10229.6

... More
laying of di pipe line;Centrifugally cast (spun) Ductile Iron pressure pipes for water, Gas and sewage with socket spigot ends confirming to I.S.: 8329/2000 in standard working lengths of 4,5,5.5 & 6 meterfor classification K7 suitable for push on joint ( Rubber Gasket D jointing) with cement mortar lining inside the pipes with out side Zinc coating. Rates are including Transportationand CED and ST etc,. complete.

190

1400

266129.2

... More
laying of di pipe line;BLD-CSTN-2-8 (16) : Collection ,Supply and filling of Crushed stone 2.36 mm and below from approved quarry to work site and stacking at work site to Dept. gauge for premeasurements including cost and convenyance of all material and all labour charges etc. complete as per standard specifications. Clause 305.3.9 MORD & 304 MORTH

42.75

804

34389.38

... More
laying of di pipe line;RBR-FNDN-1 - manual means : Earthwork excavation for structures in all types of soil as per drawing and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH. for Sumps,Thrust blocks, Chambers and Man Holes etc. by manual means.

1.56

270

421.93

... More
laying of di pipe line;RBR-FNDN-1- (i-A) In ordinary soils, by Manual means Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Lines by manual means.

10.69

270

2891.32

... More
laying of di pipe line;RBR-FNDN-1- (i-B) - In ordinary soils, by Mechanical means Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Lines by mechanical means.

96.19

109

10491.44

... More
laying of di pipe line;Cutting open BT road surface as well as asphalt concrete including water bound macadam and stacking of excavated materials for pipe line trench work. as directed by the departmental officers

3.38

1242

4201.17



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.