Mission Bhagiratha Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Mission Bhagiratha Department Tender

Works
Civil And Construction
Pipe Line Project
Opening Date4 Nov 2024
Closing Date7 Nov 2024
Tender Amount₹ 33,02,229 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
aying of pipeline from velthurlapally X road;RCC(1:1.5:3) prop using 20mm gauge HG crusher metal including cost and conveyance of all materials and labour charges, centring, mixing, curing charges but excluding cost and fabrication charges of steel for reinforcement for cover slab

0.09

16578

1492.05

... More
aying of pipeline from velthurlapally X road;RCC(1:1.5:3) prop using 20mm gauge HG crusher metal including cost and conveyance of all materials and labour charges, centring, mixing, curing charges but excluding cost and fabrication charges of steel for reinforcement for side wall long

0.63

21670

13652.52

... More
aying of pipeline from velthurlapally X road;RCC(1:1.5:3) prop using 20mm gauge HG crusher metal including cost and conveyance of all materials and labour charges, centring, mixing, curing charges but excluding cost and fabrication charges of steel for reinforcement for Raft

0.11

10485

1153.39

... More
aying of pipeline from velthurlapally X road;Cement concrete (1:4:8)prop using 40 mm gauge HG metal including cost &conveyance of all materials and labour charges ,seigniorage charges using concret mixer etc complete

0.18

5474

985.41

... More
aying of pipeline from velthurlapally X road;Earth work excavation and depositing on bank with an initial lead of 50m and lift of 3.0m in all types of soils except hard rock requiring blasting for founadtion by manual means

2.94

237

699.13

... More
aying of pipeline from velthurlapally X road;Lowering of valve and keeping in postion

1

124

124.14

... More
aying of pipeline from velthurlapally X road;Labour charges for lowering DI pipes (2 jobs)

1

51

51.82

... More
aying of pipeline from velthurlapally X road;Jointing materials such as bolts nuts and rubber vouchers including material cost for main line - 2nos

1

434

434.14

... More
aying of pipeline from velthurlapally X road;Cost of MS flanges 2nos

1

378

378

... More
aying of pipeline from velthurlapally X road;Cost of HDPE Tial pieces 2 nos

1

160

160

... More
aying of pipeline from velthurlapally X road;Cost of 0.6m DI D/F pipes 2nos

1

3409

3409.92

... More
aying of pipeline from velthurlapally X road;Transportation charges(5%)

1

749

749.25

... More
aying of pipeline from velthurlapally X road;Cost of Dismantling Joint (up to 300 mm dia CI and above 300 mm dia MS

1

5559

5559

... More
aying of pipeline from velthurlapally X road;DI D/F Gate valves ( soft Seated ) valves conforming to IS 3896-oart 2-1985 wedge fully rubber lined with EPDM food grade quality and the valve should be of vacuum tight and 100% leak proof with face to face dimensions. All the valves should be with Electrostatic powder caoting both insisde and outside pockets body passages.Drilled as per IS: 1538

1

9426

9426

... More
aying of pipeline from velthurlapally X road;Add: contractors profit 13.615%

2

3587

7174.32

... More
aying of pipeline from velthurlapally X road;Cost and fabrication charges of Steel for reinforcement including cutting, bending, cranking, tying with binding wire etc complete

132.42

67

8917.16

... More
aying of pipeline from velthurlapally X road;RCC(1:1.5:3) prop using 20mm gauge HG crusher metal including cost and conveyance of all materials and labour charges, centring, mixing, curing charges but excluding cost and fabrication charges of steel for reinforcement for cover slab

0.2

16578

3315.68

... More
aying of pipeline from velthurlapally X road;RCC(1:1.5:3) prop using 20mm gauge HG crusher metal including cost and conveyance of all materials and labour charges, centring, mixing, curing charges but excluding cost and fabrication charges of steel for reinforcement for side wall long

1.98

21670

42907.93

... More
aying of pipeline from velthurlapally X road;RCC(1:1.5:3) prop using 20mm gauge HG crusher metal including cost and conveyance of all materials and labour charges, centring, mixing, curing charges but excluding cost and fabrication charges of steel for reinforcement for Raft

0.26

10485

2726.2

... More
aying of pipeline from velthurlapally X road;Cement concrete (1:4:8)prop using 40 mm gauge HG metal including cost &conveyance of all materials and labour charges ,seigniorage charges using concret mixer etc complete

0.42

5474

2299.29

... More
aying of pipeline from velthurlapally X road;Earth work excavation and depositing on bank with an initial lead of 50m and lift of 3.0m in all types of soils except hard rock requiring blasting for founadtion by manual means

9.8

237

2330.44

... More
aying of pipeline from velthurlapally X road;Lowering of valve and keeping in postion

2

164

329.7

... More
aying of pipeline from velthurlapally X road;Labour charges for lowering DI pipes (2 jobs)

2

65

131.08

... More
aying of pipeline from velthurlapally X road;Jointing materials such as bolts nuts and rubber vouchers including material cost for main line - 2nos

2

773

1546.74

... More
aying of pipeline from velthurlapally X road;Cost of MS flanges 2nos

2

458

916

... More
aying of pipeline from velthurlapally X road;Cost of HDPE Tial pieces 2 nos

2

516

1032

... More
aying of pipeline from velthurlapally X road;Cost of 0.6m DI D/F pipes 2nos

2

4008

8017.92

... More
aying of pipeline from velthurlapally X road;Transportation charges(5%)

2

986

1972.8

... More
aying of pipeline from velthurlapally X road;Cost of Dismantling Joint (up to 300 mm dia CI and above 300 mm dia MS

2

7294

14588

... More
aying of pipeline from velthurlapally X road;DI D/F Gate valves ( soft Seated ) valves conforming to IS 3896-oart 2-1985 wedge fully rubber lined with EPDM food grade quality and the valve should be of vacuum tight and 100% leak proof with face to face dimensions. All the valves should be with Electrostatic powder caoting both insisde and outside pockets body passages.Drilled as per IS: 1538

2

12434

24868

... More
aying of pipeline from velthurlapally X road;Add: contractors profit 13.615% 50mm Air valves on 110mm Dia 8kg/cm2 piep line

6

7373

44241.24

... More
aying of pipeline from velthurlapally X road;Cost and fabrication charges of Steel for reinforcement including cutting, bending, cranking, tying with binding wire etc complete

327.54

67

22056.54

... More
aying of pipeline from velthurlapally X road;RCC with (1:1.5:3) grade using 20mm gauge HBG crusher metal including cost and conveyance of all materials and labour charges, centring, mixing, curing charges but excluding cost and fabrication charges of steel for reinforcement for COLUMN

1.56

13751

21452.65

... More
aying of pipeline from velthurlapally X road;RCC with (1:1.5:3) grade using 20mm gauge HBG crusher metal including cost and conveyance of all materials and labour charges, centring, mixing, curing charges but excluding cost and fabrication charges of steel for reinforcement for raft

1.56

10485

16357.22

... More
aying of pipeline from velthurlapally X road;PCC(1:4:8)mix using 40mm gauge hard granite metal including cost and conveyance of all materials and labour charges etc complete

0.72

5474

3941.63

... More
aying of pipeline from velthurlapally X road;Earth work excavation and depositing on bank with an initial lead of 50m and lift of 3.0m in all types of soils except hard rock requiring blasting for founadtion

16.44

237

3909.43

... More
aying of pipeline from velthurlapally X road;Labour charges for fixing of Air valve with isolated sluice Valve

6

236

1416

... More
aying of pipeline from velthurlapally X road;Labour charges for lowering DI pipes and tees - (2 jobs+1job)+3

6

188

1131.54

... More
aying of pipeline from velthurlapally X road;Jointing materials such as bolts nuts and rubber washers for Air valve and Isolated Gate Valve and extra stem pipe fixing

6

168

1011.18

... More
aying of pipeline from velthurlapally X road;Labour charges including jointing materials such as bolts nuts and rubber vouchers for main line - 4nos joints

6

1105

6635.04

... More
aying of pipeline from velthurlapally X road;Cost of MS flanges 2nos

6

458

2748

... More
aying of pipeline from velthurlapally X road;Cost of HDPE Tail pieces 2 nos

6

516

3096

... More
aying of pipeline from velthurlapally X road;Cost of D/F DI Stem pipe

6

3681

22091.08

... More
aying of pipeline from velthurlapally X road;Cost of 0.6m D/F DI pipes 2nos

6

4008

24053.76

... More
aying of pipeline from velthurlapally X road;Cost of Air Tee DI A/F

6

3783

22702.08

... More
aying of pipeline from velthurlapally X road;Transportation charges(5%)

6

1905

11430

... More
aying of pipeline from velthurlapally X road;Cost and supply of DI D/F bewel geared Isolaated sluice valve confirming to IS 3986 part - 2 1985 etc.

6

7360

44160

... More
aying of pipeline from velthurlapally X road;Single Chamber DI Air Valve with Body and cover in Ductile Iron of grade SG 400/12 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions

6

30745

184470

... More
aying of pipeline from velthurlapally X road;Construction of pipe line for water supply with HDPE pipes as per IS:4984:1985, with its amendments and revisions there on including supplying of pipes, specials as per requirements, lowering, laying and jointing of pipe lines true to alignment and gradient , trench excavation for pipe lines in all soils except Rock requiring blasting and refilling trenches with excavated earth(other than rocky soil and boulders) with watering, tamping and removing surplus earth from site of work and filling pipe line with water and testing etc., complete. The rates are inclusive of cost, conveyance of all materials and labour charges for finished item of pipe line work and excluding all Taxes. 75 mm Dia 8kg/cm2 HDPE Pipe line

120

421

50608.8

... More
aying of pipeline from velthurlapally X road;Construction of pipe line for water supply with HDPE pipes as per IS:4984:1985, with its amendments and revisions there on including supplying of pipes, specials as per requirements, lowering, laying and jointing of pipe lines true to alignment and gradient , trench excavation for pipe lines in all soils except Rock requiring blasting and refilling trenches with excavated earth(other than rocky soil and boulders) with watering, tamping and removing surplus earth from site of work and filling pipe line with water and testing etc., complete. The rates are inclusive of cost, conveyance of all materials and labour charges for finished item of pipe line work and excluding all Taxes. 125mm Dia 8kg/cm2 HDPE Pipe line

3200

818

2620480



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.