For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 29,21,954Document Cost
Refer DocumentsTender Fee
₹ 11,800
Summary
Phase-ii Modernization Of Kattaleru Anicut And Its Canals Near Bheemavaram (gangadevarapadu)
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
558877Tender No
N I T. No: 04/2024-25, Dated:03-08-2024 (2nd Call)Tender Authority
Irrigation And CAD Department ViewPurchaser Address
-Website
http://https://irrigation.telangana.gov.in/icad/home
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Phase II Modernization of Kattaleru Anicut;Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for Sub/Super structure including cost of all materials,machinery, labour, formwork,scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curingetc., complete with initial lead upto 50 m and all lifts.If water is to be brought from other place add only lead charges @ 500 ltr / cum. (Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
2455.7
8767
21529613
Phase II Modernization of Kattaleru Anicut;Providing homogeneous embankment using soil from approved borrow area in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out,transportation, spreading soil in layer of specified thickness, breaking clods,sectioning, watering, compacting each layer to density control of not less than 95 percent or as stipulated using Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.
14005
243
3408817
Phase II Modernization of Kattaleru Anicut;Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
872
2806
2447181
Phase II Modernization of Kattaleru Anicut;Granular Sub-Base with Coarse Graded Material(Table:- 400- 2 Construction of granular sub-base by providing coarse graded material,spreading in uniform layers with motor grade ron prepared surface,mixing by mix in place method with rotavatorat OMC,and compacting with vibratory roller to achieve the desired density, complete as per clause 401 MORT
4013
1542
6188849
Phase II Modernization of Kattaleru Anicut;Providing, fabricating and placing in position reinforcement steel bars for RCC works including cleaning, straightening, cutting, bending, hooking, lapping, welding wherever required,tying with 1.25 mm dia soft annealed steel wire, including cost of all materials, machinery, labour etc.,complete with initial lead upto 50 and all lifts.
316736
76
24135283
Phase II Modernization of Kattaleru Anicut;Providing and fixing 25 mm dia. 2.75 m long ribbed steel anchor rods with one end split and driven firmly using steel wedge into 1.25 m deep 45 to 50 mm dia. hole drilled in bed rock and other end provided with L- bend for embedding in concrete / masonry for spillway and appurtenant works including drilling and cleaning hole, filling hole with thick cement slurry, driving anchor rod, cost of all materials, machinery, labour, steel wedge etc., complete with initial lead upto 1 km and all lifts Consider 25 anchor rods for analysis.
18
1236
22255
Phase II Modernization of Kattaleru Anicut;Excavation for Structures- Mechanical Means(Data adopted from MORTH)Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specifica tion, including setting out, construction of shoring etc,complete.
55570.4
124
6890730
Phase II Modernization of Kattaleru Anicut;Providing cohesive non-swelling ( CNS ) soil lining to canals using soil from approved borrow area including spreading soil in layers of thickness not more than 15 cm, breaking clods, watering, compacting to density control of not less than 98 percent or as stipulated, dressing to required profile etc., complete with initial lead upto 1 km and all lifts.
59635
382
22786534
Phase II Modernization of Kattaleru Anicut;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork,cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete with initial lead upto 50 m and all lifts.(Cement content: 260 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
8873.2
7623
67643953
Phase II Modernization of Kattaleru Anicut;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than15 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials,machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position,levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum).
11615
8460
98271031
Phase II Modernization of Kattaleru Anicut;Providing and fixing 100 mm dia perforated PVC pipes 40 cm long for Weep holes including cost of all materials, labour, drilling 8 mm dia holes etc. complete with all leads and lifts.
11610
253
2943135
Phase II Modernization of Kattaleru Anicut;Providing and laying insitu vibrated M-20( 28 days cube compressive strength not less than20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for deck slab & kerb including cost of all materials,machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 380 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
1113
12913
14372837
Phase II Modernization of Kattaleru Anicut;Providing and laying insitu M- 25 ( 28 days cube compressive strength not less than25 N /sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting, finishing, curing, packing joints with asphalt mortar etc., complete with initial lead upto 1 km and all lifts.If water is to be brought from other place add only lead charges @ 500 ltr / cum. to the data (Cement content: 380 kg / cum with use of super plasticiser(0.4% by wt. of cement), (CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
128.3
8224
1055139
Phase II Modernization of Kattaleru Anicut;Providing rubble and sand filling in layers of 22.5 to 30 cm including cost of all materials, machinery, labour, watering, ramming etc., complete with initial lead upto 50 m and all lifts.
1840.2
2393
4404887
Phase II Modernization of Kattaleru Anicut;Manufacture, Supply and Delivery of 300 mm R.C.C. Np3 Socket & Spigot pipes conforming to B.I.S. 458/2003 at ex-factory (rate per meter of effective length) Excluding transportation, taxes & duties including
45
1834
82557
Phase II Modernization of Kattaleru Anicut;Laying and jointing 300 mm dia class or IRC standard hume pipes in CM 1:2 proportion by volume including cost of all materials(excluding pipes and collars),machinery,labour,aligning,packing joints with hemp,finishing,curing etc,complete with initial lead up to 50 m and all lifts. of all materials, machinery, labour, seal fixing etc., complete as per specifications and approved drawings
12
551
6614
Phase II Modernization of Kattaleru Anicut;OT sluice Shutters EM Parts:Fabrication, supply, erection, testing and commissioning of Embedded parts consisting of sil beam, slide tracks, seal seats, Guide plates etc. with all accessories including cost of all materials, machinery, labour, etc. complete as per specifications and approved drawings.
2.82
117485
331310
Phase II Modernization of Kattaleru Anicut;(OT Sluice shutters) for Below 5 Tons capcity (small gates) Fabrication, Supply, testing, Erection and commissioning of Sluice shutters consisting of Skin plate,Horizontal and vertical angles , stiffners, rubber seals ,clamps with all accessories for sluice shutters including cost of material,machinery,labour, seal fixing etc., complete as per specification of drawings.
0.4
298493
119397
Phase II Modernization of Kattaleru Anicut;OT SLUICE SHUTTERS Screw Gear Hoist Including Platform for below 5 Tons Capacity (Small Gates) Fabrication, supply, erection, testing and commissioning of Embedded parts consisting of supporting structure, platform etc. with all accessories for operating canal escape/ regulator gate with all accessories including cost of all materials, machinery, labour, cutting, bending, aligning, anchoring, welding, finishing etc. complete as per Specification and approved drawings.
2.48
166087
411898
Phase II Modernization of Kattaleru Anicut;EM PARTS of all types of Gates:Surface cleaning of metal surface by chemica cleaners and then by hand and power tool cleaners and removing dust. After cleaning, applying primary coat with one coat of protective mastic to a thickness of 70+5 microns, followed by finishing two coats with soventless coal tar epoxy each coat with a DFT of 150+5 and the total DFT of all coats including primary coat should not be less than 350 microns with material, labour and all accessories with all leads and lifts.
47.5
724
34428
Phase II Modernization of Kattaleru Anicut;Surface cleaning of metal surfaces by chemical cleaners and then by hand and power tool cleaners and removing dust. After cleaning, applying primary coat with two coat of Zinc Chromite Red oxide primer followed by finishing three coats with synthetic enamel paint with material labour and all accessories with all leads and lifts.
34
593
20189
Phase II Modernization of Kattaleru Anicut;Excavation in all kinds of soil including boulders upto 0.3 m diameter for canal, seating of embankment, filter drains / catch water drains etc., including dressing bed and sides to required level and profile, cost of all materials, machinery, labour, placing the excavated soil neatly in dump area or for the formation of service road / embankment as directed etc.,complete with initial lead upto 1 km and all lifts.
449
132
59537
Phase II Modernization of Kattaleru Anicut;Laying and fixing of 100 mm Dia 300 mm long precast porus CC plugs in bed and sides using 1.181 Kgs of cement per each using 20 mm HG metal and placing in local filters of size 600x600x750 mm in size including Excavation of drains and Cost of procuring of all materials including 50 m lead and for all lifts.
125.24
993
124388
Phase II Modernization of Kattaleru Anicut;Providing and laying 75 mm thick in situ M-15 (28 days cube compressive strength not less than 15 N /Sqmm ) grade cement concrete with 20 mm down size approved, clean, hard, graded aggregates for canal lining using, vibrating, cylinder type mechanical paver including cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position, finishing, forming contraction joints, fixing PVC joint sealing strips, curing, shifting of paver from one side to othere side of canal etc., complete with initial lead upto 1 Km and all lifts.(Paver Lining)
5986.41
634
3795983
Phase II Modernization of Kattaleru Anicut;Providing and forming 35 mm wide and 10 mm thick construction / contraction joints for concrete lining by mastic filler including cost of all materials, labour etc., complete with all leads and lifts.all leads and lifts.
2604.54
35
91419
Phase II Modernization of Kattaleru Anicut;Providing and fixing 20 mm thick 100 mm depth tarfelt expansion joint filler boards for cement concrete lining of canal including cost of all materials, labour etc., complete with all leads and lifts.
15.68
87
1370
Phase II Modernization of Kattaleru Anicut;Providing & constructing Sand filling below foudation including cost of all materials, machinery, labour, watering, ramming etc., complete with initial lead upto 50 m and all lifts.
794
1142
906748
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%