Hyderabad Metropolitan Water Supply And Sewerage Board Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Hyderabad Metropolitan Water Supply And Sewerage Board - HMWSSB Tender
Civil And Construction
Drainage Work
Opening Date6 Nov 2024
Closing Date8 Nov 2024
Tender Amount₹ 10,14,386
Costs
EMD
₹ 10,144Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
555668Tender No
166/CGM(E)/O&MC.II/AME-Work-D5/2024-25, Dt.06.11.2024. (1st Call)Tender Authority
Hyderabad Metropolitan Water Supply And Sewerage Board ViewPurchaser Address
-Website
http://https://www.hyderabadwater.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Sewerage work;Construction of 1.2M X1.2M dia meter sewer manhole up to 1.8m depth with cement bricks in CM 1:8prop. With CC bed 1:6 prop. With CC bed 1:4:8 prop. Benching with CC 1:2:4 prop. Internal plastering 20mm thick in CM 1:3 prop. And external plasterting 12mm thick in CM 1:6 prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the HMWS&SB Engineers..
3
37620
112860
Sewerage work;Internal Plastering of 0.9X0.9M dia meter sewer manholes with 20mm thick in CM 1:3 prop..including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the HMWS&SB Engineers.
50
341
17071.5
Sewerage work;Construction of 0.9M X 0.9M dia meter sewer manhole up to 0.1m additional depth with cement bricks in CM 1:6 prop. With CC bed 1:6 prop. With CC bed 1:4:8 prop. Benching with CC 1:2:4 prop. Internal plastering 20mm thick in CM 1:3 prop. And external plasterting 12mm thick in CM 1:6 prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the HMWS&SB Engineers.
50
1126
56300
Sewerage work;Construction of 0.9M X 0.9M dia meter sewer manhole up to 1.0m depth with cement bricks in CM 1:6 prop. With CC bed 1:6 prop. With CC bed 1:4:8 prop. Benching with CC 1:2:4 prop. Internal plastering 20mm thick in CM 1:3 prop. And external plasterting 12mm thick in CM 1:6 prop. including cost of all materials fixing of CI steps and only fixing charges FRC cover and frames as directed by the HMWS&SB Engineers..
16
14968
239488
Sewerage work;Carting away the surplus excavated materials such as rock / earth the site to a suitable distance of about 8 Kms including loading, unloading, conveyance charges and dumping the carted material at the contractors cost labour charges, all leads and lifts, all other incidential and operational charges etc., complete. as directed by the H.M.W.S.&. S. Board Engineers.
40.28
186
7529.94
Sewerage work;Plain Cement Concrete (1:2:4) mix with 6mm to 20 mm guage hard granite machine crushed metal including cost and conveyance of all meterial to site, machine mixing of concrete, lifts, leads, form work laying in position, vibrating, compacting, curing, all labour charges, tools and plants and all other incidental and operational charges etc. complete as directed by departmental officers as directed by the H.M.W.S.&,S. Board Engineers. (For Road restoration).
35.47
6052
214680.4
Sewerage work;Supply, delivery and filling of quarry dust (50% Rubbish 50% HBG Stone 2.36mm) where ever required as directed by departmental officers including cost and conveyance stacking leveling watering tampering rolling all leads labour charges and other incidential and operatinal charges etc. complete as directed by departmental officers.
35.47
644
22863.96
Sewerage work;Lowering, laying the 250mm dia SWG pipes carefully into the ready made trenches true to alignment and gradient jointing with cement (1:1) prop: excluding cost of SWG pipes but including curing, testing and jointing of materials such as hump yarn and cement mortor with all other operational and incidental charges etc., complete as directed by the H.MW.S.&.S. Board Engineers.
15
468
7026
Sewerage work;Lowering, laying the 200mm dia SWG pipes carefully into the ready made trenches true to alignment and gradient jointing with cement (1:1) prop: excluding cost of SWG pipes but including curing, testing and jointing of materials such as hump yarn and cement mortor with all other operational and incidental charges etc., complete as directed by the H.MW.S.&.S. Board Engineers.
20
376
7522
Sewerage work;Dewatering pipeline trenches duly bailing out water with engine driven pumps including hire charges fuel charges wages of driver and helper and all other incidental and operational charges including suction and delivery hoses lead of drain into natural drain etc. complete as directed by the H.M.W.S.&.S. Board Engineers.
80
417
33361.6
Sewerage work;Barricading, Boarding lighting and watching etc., for water supply and sewerage works trenches of depth upto 6'0"(2 meters) below G.L. using casurina ballies 125mm dia 2.5 meters long placed at 5ft c/c complete including all incidental and operation charges as directed by dept Officers. (250/200mm dia SWG)
226.1
234
53065.67
Sewerage work;Earthwork excavation for structures in all types of soil as per drawing and technical specifications including setting out. construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD/304 MORTH. for Sumps, Thrust blocks, Chambers and Man Holes etc. by manual means, etc., complete as directed by the HMWS&SB Engineers..
74.73
324
24219.99
Sewerage work;Earthwork excavation and depositing on the bank in all types of soils like black cotton soil, red earth, and ordinary gravel, hard gravelly soils, mixture of gravel, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by the departmental officers, including protecting the walls and other structures , existing water supply lines, sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to distrub the existing utility services etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and including backfilling for pipeline trenches for laying Water supply/sewer lines including all incidental and operational charges etc., complete as directed by the HMWS&SB Engineers.. (For Junction portion and pipeline trenches).
26.55
497
13216.59
Sewerage work;Cutting of open CC road surface including labour charges, all leads and other incidental and operational charges tool and plants etc complete for pipe line trenches as directed by the HMWS&SB Engineers.
35.47
2939
104274.71
Sewerage work;Cutting of open BT road surface including labour charges, all leads and other incidental and operational charges tool and plants etc complete for pipe line trenches as directed by the HMWS&SB Engineers.
4.81
1412
6795.81