Hyderabad Metropolitan Development Authority Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
523229Bid Award Id
ViewTender No
187/8/HMDA/UF/2024Tender Authority
Hyderabad Metropolitan Development Authority ViewPurchaser Address
-Website
http://https://hmda.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Item;Maintenance of Individual shrubs, rose plants topiary, ornamental bamboo and palms etc 1. Trimming once in 15 days.2. Watering once in a day@ 5 litrs/per/sqm/perday (sub soil mointure shall be maintained continuosly)iii)Formation of basins 1 ft away from the hedge, iv) Application of fertilizers, insectisides, Fungisides (@20 gms/pit/smt)etc.,
1234
380
28187.03
Item;Cost and supply of water through water tankers once in a day @ 5 Lites/per smt/ per day (sub soil moisture shall be maintained) = 10539Sqmt X 5 X 28 days X 6months = 354.11days
354.11
3352
1187082.95
Item;Maintenance of hedge/shrub planting: i)Trimming once in 15 days, ii) Watering once in a day @ 5 Lts per day / plant, iii)Formation of basins 1 ft away from the hedge, iv) Application of fertilizers, insectisides, Fungisides (@20 gms/pit/smt)etc.,
10539
2930
1853255.75
Item;Protection, maintenance, watering, tending the plants, upkeep of fencing and removal of unwanted growth
1496
216
19438.43
Item;Cost and supply of water through water tankers Each watering 20 per watering thrugh tankers of 5000 ltrs eachtrip capacity 5 trips per day @ 25000 Ltrs for 2 months = 1496 X 20 X 18watering = 21.54days
21.54
3352
72208.54
Item;1st soil working 10cms deep using crowbars to a radius of 50cms around the plant
1496
413
6191.11
Item;1st circular weeding without apllication of fertilisers to a radius of 50cms around the plant
1496
137
2063.76
Item;Application of chemicals and fertilizers/ Neem cake etc (2 doses)
1496
251
3769.02
Item;Cost of chemicals and fertilizers @ 20gms/pit/dose (2 doses)
1496
1
1496
Item;2ND year Maintenance of Avenue Plantation and Central medain from Yadagirigutta to Turkapally Road, Yadagirigutta, ( bit 01)
-
-
-
Item;Cost and supply of water through water tankers once in a day @ 10 Lites/per smt/ per day (sub soil moisture shall be maintained) = 1700 Sqmt X 10 X 28 days X 12Months = 114.24
228.48
3352
765933.5
Item;Maintenance of Lawns: i) Watering of the lawns @10-15 Liters/Sqmt/day basing on the season and weather conditions (sub soil moisture shall be maintained continuously) ii) Lawn mowing and edging of thelawns iii) Edging of the lawns in a such a way that the lawn grass iv) Keeping the lawns always in lush green & weed-free condition
1700
792
161568
Item;Cost and water for Individual plants through tankers of 5000 ltrs each trip capaity 5 trips per day @ 25000 ltrs = 1234 X 5 Ltr X 15 days X 12 Months = 44.24 Days
44.24
3352
148305.75
Item;Maintenance of Individual shrubs, rose plants topiary, ornamental bamboo and palms etc 1. Trimming once in 15 days.2. Watering once in a day@ 5 litrs/per/sqm/perday (sub soil mointure shall be maintained continuosly)iii)Formation of basins 1 ft away from the hedge, iv) Application of fertilizers, insectisides, Fungisides (@20 gms/pit/smt)etc.,
1234
380
56374.06
Item;Cost and supply of water through water tankers once in a day @ 5 Lites/per smt/ per day (sub soil moisture shall be maintained) = 10539Sqmt X 5 X 28 days X 12months = 708days
708.22
3352
2374165.91
Item;Maintenance of hedge/shrub planting: i)Trimming once in 15 days, ii) Watering once in a day @ 5 Lts per day / plant, iii)Formation of basins 1 ft away from the hedge, iv) Application of fertilizers, insectisides, Fungisides (@20 gms/pit/smt)etc.,
10539
2930
3706511.5
Item;Protection, maintenance, watering, tending the plants, upkeep of fencing and removal of unwanted growth
1496
216
38876.85
Item;Cost and supply of water through water tankers Each watering 20 per watering thrugh tankers of 5000 ltrs eachtrip capacity 5 trips per day @ 25000 Ltrs for 2 months = 1496 X 20 X 32watering = 38.29days
38.29
3352
128359.57
Item;2 soil working 10cms deep using crowbars to a radius of 50cms around the plant
1496
413
6191.11
Item;2 circular weeding without apllication of fertilisers to a radius of 50cms around the plant
1496
137
2063.76
Item;1st soil working 10cms deep using crowbars to a radius of 50cms around the plant
1496
413
6191.11
Item;1st circular weeding without apllication of fertilisers to a radius of 50cms around the plant
1496
137
2063.76
Item;Application of chemicals and fertilizers/ Neem cake etc (2 doses)
1496
251
3769.02
Item;Cost of chemicals and fertilizers @ 20gms/pit/dose (2 doses)
1496
1
1496
Item;Cost and water for Individual plants through tankers of 5000 ltrs each trip capaity 5 trips per day @ 25000 ltrs = 1354 X 5 Ltr X 15 days X 11 Months = 44.68 Days
44.68
3352
149780.76
Item;Maintenance of Individual shrubs, rose plants topiary, ornamental bamboo and palms etc 1. Trimming once in 15 days.2. Watering once in a day@ 5 litrs/per/sqm/perday (sub soil mointure shall be maintained continuosly)iii)Formation of basins 1 ft away from the hedge, iv) Application of fertilizers, insectisides, Fungisides (@20 gms/pit/smt)etc.,
1354
380
61856.14
Item;Cost and supply of water through water tankers once in a day @ 5 Lites/per smt/ per day (sub soil moisture shall be maintained) = 3123Sqmt X 5 X 28 days X 11 months = 192.37 days
192.37
3352
644881.95
Item;Maintenance of hedge/shrub planting: i)Trimming once in 15 days, ii) Watering once in a day @ 5 Lts per day / plant, iii)Formation of basins 1 ft away from the hedge, iv) Application of fertilizers, insectisides, Fungisides (@20 gms/pit/smt)etc.,
3123
2930
1098342.86
Item;Protection, maintenance, watering, tending the plants, upkeep of fencing and removal of unwanted growth
11238
216
292044.15
Item;Cost and supply of water through water tankers Each watering 20 per watering thrugh tankers of 5000 ltrs eachtrip capacity 5 trips per day @ 25000 Ltrs for 2 months = 11238 X 20 X 48watering = 431.53 days
431.53
3352
1446618.02
Item;2 nd soil working 10cms deep using crowbars to a radius of 50cms around the plant
11238
413
46507.79
Item;2nd circular weeding without apllication of fertilisers to a radius of 50cms around the plant
11238
137
15503.05
Item;1st soil working 10cms deep using crowbars to a radius of 50cms around the plant
11238
413
46507.79
Item;1st circular weeding without apllication of fertilisers to a radius of 50cms around the plant
11238
137
15503.05
Item;Application of chemicals and fertilizers/ Neem cake etc (2 doses)
11238
251
28313.02
Item;Cost of chemicals and fertilizers @ 20gms/pit/dose (2 doses)
11238
1
11238
Item;Cost and water for Individual plants through tankers of 5000 ltrs each trip capaity 5 trips per day @ 25000 ltrs = 950 X 5 Ltr X 15 days X 11 Months = 31.35 Days
31.35
3352
105094.61
Item;Maintenance of Individual shrubs, rose plants topiary, ornamental bamboo and palms etc 1. Trimming once in 15 days.2. Watering once in a day@ 5 litrs/per/sqm/perday (sub soil mointure shall be maintained continuosly)iii)Formation of basins 1 ft away from the hedge, iv) Application of fertilizers, insectisides, Fungisides (@20 gms/pit/smt)etc.,
950
380
43399.8
Item;Cost and supply of water through water tankers once in a day @ 5 Lites/per smt/ per day (sub soil moisture shall be maintained) = 8297 Sqmt X 5 X 28 days X 11 months =511 days
511
3352
1713025.3
Item;Maintenance of hedge/shrub planting: i)Trimming once in 15 days, ii) Watering once in a day @ 5 Lts per day / plant, iii)Formation of basins 1 ft away from the hedge, iv) Application of fertilizers, insectisides, Fungisides (@20 gms/pit/smt)etc.,
8297
2930
2918011.76
Item;Maintanance of Central medain from Yadagirigutta to Turkapally Road, YadagiriguttA, 1ST year Maintenance of Avenue Plantation 12KM)and Central medain (7KM)from Yadagirigutta to Turkapally Road and 2ND year Maintenance of Avenue Plantation and Central medain from Yadagirigutta to Turkapally Road, Yadagirigutta
-
-
-