Hyderabad Metropolitan Development Authority Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
511577Bid Award Id
ViewTender No
187/4/ORR/UF/HMDA/2024Tender Authority
Hyderabad Metropolitan Development Authority ViewPurchaser Address
-Website
http://https://hmda.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Item;Carting of debris transport upto a lead of 10 kms Hedge/Shrub area in development works effective area central median 1242 X 0.30 =
700
191
134260
Item;Watering the plants through tankers of 5000 litres each trip capacity ( 5 trips per day - 25000 ltrs )
400
3352
1340920
Item;Maintenance of Lawns: Watering of the lawns @10-15 Liters/Sqmt/day basing on the season and weather conditions (sub soil moisture shall be maintained continuously) Lawn mowing and edging of the lawns in the following frequency Edging of the lawns in a such a way that the lawn grass should not penetrate into the plants and in a defined perfect geometric shapes or smooth curves Keeping the lawns always in lush green & weed-free condition Application of fertilizers, insecticides, fungicides etc a) with manual watering (for 6 months)
1000
924
55446.6
Item;Maintenance of Individual shrubs: Trimming of shrubs once in 15 days Watering to shrubs once in a day @ 5 litres / per plant / per day (sub soil moisture shall be maintained continuously) Formation of basins for each and every plant upto 1 ft away from the plant Application of fertilizers, insecticides, fungicides etc a) with manual watering (for 6 months)
250
444
13324.2
Item;Maintenance of Hedge/Shrub Planting: Trimming of hedges once in 15 days Watering to hedges once in a day @ 5 litres / per sqmt / per day (sub soil moisture shall be maintained continuously) Formation of basins for each and every plant upto 1 ft away from the plant Application of fertilizers, insecticides, fungicides etc a) with manual watering (for 6 months)
5500
2930
1934321.4
Item;Railing & painting & sign bords
-
-
500000
Item;Laying of steping stone
400
743
297368
Item;Cost of sculptures
4
250000
1000000
Item;Cost of Topiry/Plams
250
5000
1250000
Item;cost of Hedge plants
55000
50
2750000
Item;Transport of plants from nursery site to planting site upto a lead of 3km including loading and unloading where-ever departmental vehicleOver and above 3km lead add following rates per kms are not provided lead 22km
55000
404
222618
Item;Individual Shrubs Planting: Topiary / Palms / Garden tree planting ? Digging of 75x75x75 cm pit, filling with soil mixture of red soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants and planting the plants (excluding cost of plant material, fertilizers and chemicals (@ 20 gms/pit/sqmt)) Plams=20Nos Topiry=20
250
746
186650
Item;Hedge / shrub planting: Digging the trench of size 30 cm depth, refilling the trench with red soil including cost of red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides etc., (@20 gms/pit/sqmt) complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) andplant material
5500
756
4160695
Item;Laying of carpet grass and ramming
1000
58
58100
Item;Cost of carpet grass
1000
135
135000
Item;Dressing the surface to the desired shape, laying 6? layer of fine red soil, covered with a thin layer of sand, watering, rolling with hand roller, including the cost of red earth, sand and labour charges etc complete but excluding the cost of fertilizers, chemicals and grass
1000
333
333750
Item;Formation of earthen mounds for using the soil available at site 750Sqmtsx2.15=
2500
49
123125
Item;Spreading of red soil,gravel or sand including watering and rolling with hand roller irrespective of thickness in layer
1000
22
22500
Item;Internal transport & application of red earth,gravel,soil mixture plantation areas parks
1000
94
94440
Item;Supply & stacking of gravel at site to the department gauge for premeasurements and it shall be composed of wellgraded coars silicious grains shrp & gritty to touch and free from dirt & other deleterious matter.. the cost including of transportation, loading,unloading, stackinag at the site including all labour charges, taxes & seiniorage chares Internal transportation & application of gravel including spreading etc. complete. 1500x0.5Mtrs=
1000
432
432540
Item;Supply and fixing of pre cast ACC curb with size 600mm X 375mm X 110 mm semi bated at the top in M30 grade including cost and conveyence to site and labour charges for complete for laying true to aalingment and
750
227
170250
Item;Carting of debris and unwanted boulders and vegetation from site including loading and unloading etc complete = 1500 Sqmt X 0.30 = 600 Cum
600
174
104880
Item;Engaging of Men and Women mazdoor for removal of unwanted vegetation, plastic materials Basic rate: 520/- + 20% Municipal limits on labour component
100
520
52000
Item;Engaging of JCB on hire charges including fuel and driver batha as per the direction of the departmental authority
40
850
34000
Item;Estimate for Replacement of Greenery, Soft landscape work at Keesara Rotaries, In between Central Median during the year 2023-24 , Estimate for Refurbishment of Hedge Plantation in ORR Central Median from Shameerpet(61.70km to 82km) during the year 2023-24
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements