Hyderabad Metropolitan Development Authority Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
511505Bid Award Id
ViewTender No
187/1/UF/HMDA/2024Tender Authority
Hyderabad Metropolitan Development Authority ViewPurchaser Address
-Website
http://https://hmda.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Item;Maintenance From December-2023 to March-2024(4Months)
-
-
-
Item;Transport of plants from nursery site to planting site upto a lead of 3km including loading and unloading wherever departmental vehicles are not provided.(8"x12")Bags Total lead 25Km =22km x10.58=232.76+542.19
2525
774
19567.49
Item;Cost of Shub Plants
2525
50
126250
Item;Shrub planting: Digging the pit of size 0.45x0.45x0.45 m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides (@ 20 gms/pit/sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material.
5050
194
980053.5
Item;Engaging of JCB for Clening and leveling of sites including the fuel charges and driver batta etc complete 3days X 8 Hours = 24 Hours
24
850
20400
Item;Individual Shrub Plantation
-
-
-
Item;Engaging of Water tankers for Watering to the Plants through tankers of 5000 Ltrs each trip Capacity 5 trips Per day @ 25000 Ltrs for 3 Month 1800x5x28/25000=10.084 Daysx4Months=40.32
40.32
3352
135164.74
Item;Maintenance of hedge planting trimming once in 15 days watering once in a day @ 5ltrs per plant with manual watering
1800
2930
211016.88
Item;Transport of plants from nursery site to planting site upto a lead of 3km including loading and unloading wherever departmental vehicles are not provided.(6"x12")Bags Total lead 25Km =22km x3.02=66.44+338.83
18000
405
72948.6
Item;Cost of Hedge Plants
18000
35
630000
Item;Hedge planting: Digging the trench of size 30 cm depth, refilling the trench with red soil including cost of red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides etc., (@20 gms/pit/sqmt) complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material 1 Km x0.45x2Sides
1800
756
1361682
Item;Carting of debris and unwanted boulders and vegetation from site including loading and unloading etc complete =1000 Sqmt X 0.45x2 = 1800 Cum
1800
174
314640
Item;Hedge Plantation along the Walking Track (2000 RMT @ 45 cm width Both sides = 450 Sq.Mtrs
-
-
-
Item;Protection, maitenance, watering, tending the plants, upkeep of fencing & removal of unwanted growth.From December-2023 to March-2024 (4 months)
333
360
4807.72
Item;cost of water to plants through tankers for watering 5000 lts each trip capacity 5 trips per day 20lts per plant in each avenue plants each watering (16 Waterings) From December-2023 to March-2024 =333x20x16/25000=4.26
4.26
3352
14280.8
Item;1st soil working 10 cms deep using crowbars to a radious of 50 cms around the plant
333
482
1607.78
Item;1st circular weeding without application of fertilizers to radious of 50 cms around the plant
333
160
535.94
Item;Replacement of causalities to a maximum of 10% of the planted, including re-opening of pits, transport of plants internal transport and planting. ( 10"x16" Tall plants)
33
2261
746.13
Item;Signboards
-
-
500000
Item;Cost of Sculptures (2 Nos)
2
-
1400000
Item;Application of fertilizers (2 doses)
333
293
978.79
Item;Cost of chemicals and fertilizers 20 grams per pit (2 doses)
333
-
333
Item;Cost of supporting stacke of 2.5 mtr long sturdy and straight and minimum 10cm grith at the base (if bamboos are not supplied by Dept) (10"x16")
333
28
9324
Item;Planting of bag plants after refilling the pits/support sticks10"x16" bags
333
2139
7123.54
Item;Internal transport of bag plants to planting site 10X16 bags
333
608
2026.11
Item;10"x16"Bags(10.58x22+735.93)
233
968
2257.05
Item;Transport of plants from nursery site to planting site upto a lead of 3km including loading and unloading wherever departmental vehicles are 3km lead total lead 53Km
-
-
-
Item;Cost of Avnue Plants
100
250
25000
Item;Application of Folidol dust (10%) @20gms/pit/dose
333
57
190.16
Item;Application of Red soil and FYM including internal distribution 75cmt cube pit
333
1233
4108.81
Item;Cost of Folidol dust (10%) @20grms/pit
333
-
166.5
Item;Cost and conveyance of well decomposed FYM (0.60 mt pits)
333
2558
8520.57
Item;Importation of good quality red earth congenial for plant growth of light textured, crystalline, porous and friable, generally acidic or neutral but not alkaline, fertile, cost, transportation, loading, unloading etc complete 0.60mt pits (0.60X0.60X0.60=0.216x333=71.92 cum x 20%=14.38 cum
14.38
1228
17665.83
Item;Digging of pits of size0.60x0.60x0.60 mts
333
6761
22514.85
Item;Alignment and Stacking including cost of stacks(45%)
150
97
145.63
Item;Clearing of unwanted light Jungle growth (bushes, shrubs etc., wherever necessary)
666
65
437.95
Item;Avenue Plantation along the Walking Track (1500 RMT @ 3mx3m espacement both sides = 333 Plants
-
-
-
Item;Engaging of Water tankers for Watering to the Plants through tankers of 5000 Ltrs each trip Capacity 5 trips Per day @ 25000 Ltrs for 4 Month 6000x10x30/25000=72 Daysx4 Months=288
288
3352
965462.4
Item;Maintenance of Lawn @ 10-15 Ltrs per Sq.Mtrs basing on the season ans weather condition and the watering shall be carried out daily during on non rainy days with manual watering
6000
660
158419.2
Item;Maintenance of Lawns from December-2023 to March-2024 (4 Months)
-
-
-
Item;Cost of Sculptures (1 Nos)
-
-
600000
Item;Supply and fixing of Granite stone benches of minimum length of 5 feet with flammed finish of approved design and colour including the cost of earth work excavation laying of PCC 1:2:4 in required dimensions fixing chagre labour charges making charges incidental and operation charges contractor profit etc complete for finished item of work and as directed by the engineer
24
11000
264000
Item;Internal Transportation spereading of gravel
1200
71
86328
Item;Lawn Mounds, Gravel filling
1200
204
245040
Item;Laying of shabad stone flooring with ran door white 50.80 mm thickness over a base of mud motor of 30mm thickness and pointing of full depth stores with red soil and carpet grass including cost and conveyance of all material and labour chagres 2 feetx2 feet x 300 Rmt= 1200
1200
4299
515922
Item;Laying of carpet grass and ramming
6000
58
348600
Item;Cost of carpet grass
6000
135
810000
Item;Dressing the surface to the desired shape, laying 6? layer of fine red soil, covered with a thin layer of sand, watering, rolling with hand roller, including the cost of red earth, sand and labor charges etc complete but excluding the cost of fertilizers, chemicals and grass ( 4? thickness after rolling )
6000
333
2002500
Item;Internal Transportation & application of gravel including spreading
2400
99
238656
Item;Supply & stacking of gravel at site to the department guage for permeasurements and it shall be composed for wellgraded coars silicious grains shrp & gritty to touch and free from dirt & other deleteriious matter the cost including of transportation, loading, unloading charges taxes & seiniorage charges etc complete = 1200 Sqm x2 M Height =2400 Cum
2400
204
490080
Item;Carting of debris including excavation, loading, unloading and transport upto a lead of 10 kms
3000
137
411000
Item;ESTIMATE FOR DEVELOPEMNT OF LANDSCAPING WORK AT LINGAMAIAH PARK, AMEENPUR DURING THE YEAR 2023-24
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements