Hyderabad Metropolitan Development Authority Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Hyderabad Metropolitan Development Authority - HMDA Tender

Works
Housekeeping Services
Opening Date14 Jul 2024
Closing Date20 Jul 2024
Tender Amount₹ 23,75,693 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Item;Maintenance of Hedge/Shrub Planting: Trimming of hedges once in 15 days Watering to hedges once in a day @ 5 litres / per sqmt / per day (sub soil moisture shall be maintained continuously) Formation of basins for each and every plant upto 1 ft away from the plant Application of fertilizers, insecticides, fungicides etc a) with manual watering (for 6 months)

700

2930

123093.18

... More
Item;Internal transport of bag plants to planting site 6"x12"

1000

107

1075.4

... More
Item;Over and above 3km lead add following rates per km per 100 plants From Ghatkesar nursery to Bhongir park 60kms - 3kms = 57 kms 6"x12" 3.02 100 nos per km x 57 kms

1000

172

1721.4

... More
Item;Transportation of plants from nursery site to planting site upto a lead of 3km including loading and unloading wherever departmental vehicles are not provided 6"x12"From Tellapur to Teachers Colony B.N Reddy Nagar: 60kms - 3kms = 57 kms

1000

338

3388.3

... More
Item;Laying of shabad stone pathway flooring with 40mm thickness rough shabad stone, set over base coat of mud motor 12mm thickness including with red earth 6 inches dul filling joint near by including cost of all materials like red earth, carpet grass and shabad stone etc., complete labour charges for dressing of flooring stone per finished item of work

120

743

89210.4

... More
Item;Individual Shrubs Planting: Topiary / Palms / Garden tree planting ? Digging of 45x45x45 cm pit, filling with soil mixture of red soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants and planting the plants (excluding cost of plant material, fertilizers and chemicals (@ 20 gms/pit/sqmt))

500

194

97035

... More
Item;Individual Shrubs Planting: Topiary / Palms / Garden tree planting ? Digging of 60x60x60 cm pit, filling with soil mixture of red soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants and planting the plants (excluding cost of plant material, fertilizers and chemicals (@ 20 gms/pit/sqmt))

350

385

134981

... More
Item;Hedge / shrub planting: Digging the trench of size 45 cm depth, refilling the trench with red soil including cost of red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides etc., (@20 gms/pit/sqmt) complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) andplant material

700

953

667121

... More
Item;Laying of carpet grass and ramming

800

58

46480

... More
Item;Cost of carpet grass

800

135

108000

... More
Item;Dressing the surface to the desired shape, laying 6? layer of fine red soil, covered with a thin layer of sand, watering, rolling with hand roller, including the cost of red earth, sand and labor charges etc complete but excluding the cost of fertilizers, chemicals and grass Carpet grass - 1200 sq mt

800

333

267000

... More
Item;Carting of debris in shrub trench area including the loading and unloading etc complete

120

174

20976

... More
Item;Engaging of Men and Women mazdoor for cleaning of Jungle growth, shrubs, weed etc and making the site a visible, clean and neat by disposing of all cleared materials from the site and pruning of existing plants lower branches in open space areas including removal of all weeds 10 Mandays x 10 days = 100 nos

200

560

112000

... More
Item;Development of Greenery work with landscaping at Nandi Hills Colony Park

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.