Hyderabad Metropolitan Development Authority Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
528676Bid Award Id
ViewTender No
627/Parks/11/UF/H/2024Tender Authority
Hyderabad Metropolitan Development Authority ViewPurchaser Address
-Website
http://https://hmda.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Item;Maintenance of Hedge/Shrub Planting: Trimming of hedges once in 15 days Watering to hedges once in a day @ 5 litres / per sqmt / per day (sub soil moisture shall be maintained continuously) Formation of basins for each and every plant upto 1 ft away from the plant Application of fertilizers, insecticides, fungicides etc a) with manual watering (for 6 months)
700
2930
123093.18
Item;Internal transport of bag plants to planting site 6"x12"
1000
107
1075.4
Item;Over and above 3km lead add following rates per km per 100 plants From Ghatkesar nursery to Bhongir park 60kms - 3kms = 57 kms 6"x12" 3.02 100 nos per km x 57 kms
1000
172
1721.4
Item;Transportation of plants from nursery site to planting site upto a lead of 3km including loading and unloading wherever departmental vehicles are not provided 6"x12"From Tellapur to Teachers Colony B.N Reddy Nagar: 60kms - 3kms = 57 kms
1000
338
3388.3
Item;Laying of shabad stone pathway flooring with 40mm thickness rough shabad stone, set over base coat of mud motor 12mm thickness including with red earth 6 inches dul filling joint near by including cost of all materials like red earth, carpet grass and shabad stone etc., complete labour charges for dressing of flooring stone per finished item of work
120
743
89210.4
Item;Individual Shrubs Planting: Topiary / Palms / Garden tree planting ? Digging of 45x45x45 cm pit, filling with soil mixture of red soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants and planting the plants (excluding cost of plant material, fertilizers and chemicals (@ 20 gms/pit/sqmt))
500
194
97035
Item;Individual Shrubs Planting: Topiary / Palms / Garden tree planting ? Digging of 60x60x60 cm pit, filling with soil mixture of red soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants and planting the plants (excluding cost of plant material, fertilizers and chemicals (@ 20 gms/pit/sqmt))
350
385
134981
Item;Hedge / shrub planting: Digging the trench of size 45 cm depth, refilling the trench with red soil including cost of red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides etc., (@20 gms/pit/sqmt) complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) andplant material
700
953
667121
Item;Laying of carpet grass and ramming
800
58
46480
Item;Cost of carpet grass
800
135
108000
Item;Dressing the surface to the desired shape, laying 6? layer of fine red soil, covered with a thin layer of sand, watering, rolling with hand roller, including the cost of red earth, sand and labor charges etc complete but excluding the cost of fertilizers, chemicals and grass Carpet grass - 1200 sq mt
800
333
267000
Item;Carting of debris in shrub trench area including the loading and unloading etc complete
120
174
20976
Item;Engaging of Men and Women mazdoor for cleaning of Jungle growth, shrubs, weed etc and making the site a visible, clean and neat by disposing of all cleared materials from the site and pruning of existing plants lower branches in open space areas including removal of all weeds 10 Mandays x 10 days = 100 nos
200
560
112000
Item;Development of Greenery work with landscaping at Nandi Hills Colony Park
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements