Hyderabad Metropolitan Development Authority Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Hyderabad Metropolitan Development Authority - HMDA Tender

Works
Civil And Construction
Excavation
Opening Date16 Mar 2024
Closing Date3 Apr 2024
Tender Amount₹ 2,62,79,319 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Item;Cost and fixing of supporting stakes

30000

17

520800

... More
Item;Garden Tree Planting Digging of 0.45x0.45x0.45 cm pit ,filling with soil mixture of red soil, farmyard manure and sand in the ratio 3:1:1 ratio including internal transport application of fertilizers and chemicals @20 gms /pit/sqmt/,internal transportation of plants and planting the plants (excluding cost of plant material fertilizers and chemicals @20 gms/pit/sqmt)

30000

194

5822100

... More
Item;Maintenance of Individual shrubs: Trimming of shrubs once in 15 days Watering to shrubs once in a day @ 5 litres / per plant / per day (sub soil moisture shall be maintained continuously) Formation of basins for each and every plant upto 1 ft away from the plant Application of fertilizers, insecticides, fungicides etc a) with manual watering (for 12 months)

1820

612

133794.02

... More
Item;Maintenance of Lawns: Watering of the lawns @10-15 Liters/Sqmt/day basing on the season and weather conditions (sub soil moisture shall be maintained continuously) Lawn mowing and edging of the lawns in the following frequency June to November - once in 15 days December to May - once in 30 days Edging of the lawns in a such a way that the lawn grass should not penetrate into the plants and in a defined perfect geometric shapes or smooth curves Keeping the lawns always in lush green & weed-free condition Application of fertilizers, insecticides, fungicides etc a) drip system ( for 12 months )

200

924

22178.64

... More
Item;Maintenance of Hedge/Shrub Planting: Trimming of hedges once in 15 days Watering to hedges once in a day @ 5 litres / per sqmt / per day (sub soil moisture shall be maintained continuously) Formation of basins for each and every plant upto 1 ft away from the plant Application of fertilizers, insecticides, fungicides etc a) with manual watering (for 12 months)

200

2930

70338.96

... More
Item;Garden tree plants 18"x18"

200

450

90000

... More
Item;Individual shrub plants 13"x13"

600

165

99000

... More
Item;Acalipha holland red 8?x8"

350

55

19250

... More
Item;Cannas 8?x8"

350

55

19250

... More
Item;Mandaram 8?x8"

350

55

19250

... More
Item;Tecoma orange 8?x8"

350

55

19250

... More
Item;Alamanda yellow 8?x8"

350

55

19250

... More
Item;Bombay border 8?x8"

350

55

19250

... More
Item;Spider lilly 8"x8"

350

55

19250

... More
Item;Leucophyllum 8"x8"

350

55

19250

... More
Item;Jetropha 8"x8"

350

55

19250

... More
Item;Dracena Colorama 8"x8"

350

55

19250

... More
Item;Dracena Mahatma 8"x8"

350

55

19250

... More
Item;Padanus 8"x8"

350

55

19250

... More
Item;Adenium

170

600

102000

... More
Item;Aloevera

170

175

29750

... More
Item;Euphorbia miniature

170

80

13600

... More
Item;Sensvaria (Snake plant)

170

350

59500

... More
Item;Saklens

170

250

42500

... More
Item;Cactus

170

250

42500

... More
Item;Cost and supply of 1inch dia HDPE pipe 30mts length bundle

5

2850

14250

... More
Item;Cost and conveyance of well decomposed FYM

25

1340

33517.25

... More
Item;Digging of pits 0.45x0.45x0.45

1020

2438

24873.52

... More
Item;Importation of good quality red earth

100

1228

122850

... More
Item;Pebbles

2500

20

50000

... More
Item;20 mm Metal

55

2500

137500

... More
Item;Sand for rock garden

50

2600

130000

... More
Item;DAP 45 - 50 Kgs bag

10

1450

14500

... More
Item;Rock garden: Neem cake

150

25

3750

... More
Item;Laying of carpet grass and ramming

200

58

11620

... More
Item;Cost of carpet grass

200

135

27000

... More
Item;Dressing the surface to the desired shape, laying 6? layer of fine red soil, covered with a thin layer of sand, watering, rolling with hand roller, including the cost of red earth, sand and labor charges etc complete but excluding the cost of fertilizers, chemicals and grass

200

333

66750

... More
Item;Individual Shrubs Planting: Topiary / Palms / Garden tree planting ? Digging of 45x45x45 cm pit, filling with soil mixture of red soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants and planting the plants (excluding cost of plant material, fertilizers and chemicals (@ 20 gms/pit/sqmt))

600

194

116442

... More
Item;Individual Shrubs Planting: Topiary / Palms / Garden tree planting ? Digging of 60x60x60 cm pit, filling with soil mixture of red soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants and planting the plants (excluding cost of plant material, fertilizers and chemicals (@ 20 gms/pit/sqmt))

200

385

77132

... More
Item;Hedge / shrub planting: Digging the trench of size 30 cm depth, refilling the trench with red soil including cost of red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides etc., (@20 gms/pit/sqmt) complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) andplant material

200

756

151298

... More
Item;Cost of gravel including internal transportation, application and spreading complete

500

432

216270

... More
Item;Carting of debris in shrub trench area including the loading and unloading etc complete

400

174

69920

... More
Item;Engaging of Men and Women mazdoor for removal of unwanted vegetation and plastic materials and pruning of existing trees lower branches 10 Mandays x 20 days = 200 Nos Basic rate: 520/- + 20% Municipal limits for labour component

159

624

99216

... More
Item;Engaging of JCB on hire charges as per the direction of the Departmental authority including fuel and driver batha charges 8 days x 8 hrs = 64 hrs

50

1000

50000

... More
Item;Maintenance of Individual shrubs: Trimming of shrubs once in 15 days Watering to shrubs once in a day @ 5 litres / per plant / per day (sub soil moisture shall be maintained continuously) Formation of basins for each and every plant upto 1 ft away from the plant Application of fertilizers, insecticides, fungicides etc a) with manual watering (for 12 months)

800

612

58810.56

... More
Item;Maintenance of Lawns: Watering of the lawns @10-15 Liters/Sqmt/day basing on the season and weather conditions (sub soil moisture shall be maintained continuously) Lawn mowing and edging of the lawns in the following frequency June to November - once in 15 days December to May - once in 30 days Edging of the lawns in a such a way that the lawn grass should not penetrate into the plants and in a defined perfect geometric shapes or smooth curves Keeping the lawns always in lush green & weed-free condition Application of fertilizers, insecticides, fungicides etc a) drip system ( for 12 months )

100

924

11089.32

... More
Item;Maintenance of Hedge/Shrub Planting: Trimming of hedges once in 15 days Watering to hedges once in a day @ 5 litres / per sqmt / per day (sub soil moisture shall be maintained continuously) Formation of basins for each and every plant upto 1 ft away from the plant Application of fertilizers, insecticides, fungicides etc a) with manual watering (for 12 months)

100

2930

35169.48

... More
Item;Garden tree plants 18"x18"

100

450

45000

... More
Item;Individual shrub plants 13"x13"

100

165

16500

... More
Item;Acalipha holland red 8?x8"

160

55

8800

... More
Item;Cannas 8?x8"

160

55

8800

... More
Item;Mandaram 8?x8"

160

55

8800

... More
Item;Tecoma orange 8?x8"

160

55

8800

... More
Item;Alamanda yellow 8?x8"

160

55

8800

... More
Item;Bombay border 8?x8"

160

55

8800

... More
Item;Spider lilly 8"x8"

160

55

8800

... More
Item;Leucophyllum 8"x8"

160

55

8800

... More
Item;Jetropha 8"x8"

160

55

8800

... More
Item;Dracena Colorama 8"x8"

160

55

8800

... More
Item;Dracena Mahatma 8"x8"

160

55

8800

... More
Item;Padanus 8"x8"

160

55

8800

... More
Item;Adenium

100

600

60000

... More
Item;Aloevera

100

175

17500

... More
Item;Euphorbia miniature

100

80

8000

... More
Item;Sensvaria (Snake plant)

100

350

35000

... More
Item;Saklens

100

250

25000

... More
Item;Cactus

100

250

25000

... More
Item;Cost and supply of 1inch dia HDPE pipe 30mts length bundle

5

2850

14250

... More
Item;Cost and conveyance of well decomposed FYM

10

1340

13406.9

... More
Item;Digging of pits 0.45x0.45x0.45

600

2438

14631.48

... More
Item;Importation of good quality red earth

20

1228

24570

... More
Item;Pebbles

500

20

10000

... More
Item;20 mm Metal

25

2500

62500

... More
Item;Sand for rock garden

25

2600

65000

... More
Item;DAP 45 - 50 Kgs bag

5

1450

7250

... More
Item;Rock garden: Neem cake

50

25

1250

... More
Item;Laying of carpet grass and ramming

100

58

5810

... More
Item;Cost of carpet grass

100

135

13500

... More
Item;Dressing the surface to the desired shape, laying 6? layer of fine red soil, covered with a thin layer of sand, watering, rolling with hand roller, including the cost of red earth, sand and labor charges etc complete but excluding the cost of fertilizers, chemicals and grass

100

333

33375

... More
Item;Individual Shrubs Planting: Topiary / Palms / Garden tree planting ? Digging of 45x45x45 cm pit, filling with soil mixture of red soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants and planting the plants (excluding cost of plant material, fertilizers and chemicals (@ 20 gms/pit/sqmt))

100

194

19407

... More
Item;Individual Shrubs Planting: Topiary / Palms / Garden tree planting ? Digging of 60x60x60 cm pit, filling with soil mixture of red soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants and planting the plants (excluding cost of plant material, fertilizers and chemicals (@ 20 gms/pit/sqmt))

100

385

38566

... More
Item;Hedge / shrub planting: Digging the trench of size 30 cm depth, refilling the trench with red soil including cost of red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides etc., (@20 gms/pit/sqmt) complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) andplant material

100

756

75649

... More
Item;Cost of gravel including internal transportation, application and spreading complete

150

432

64881

... More
Item;Carting of debris in shrub trench area including the loading and unloading etc complete

300

174

52440

... More
Item;Engaging of Men and Women mazdoor for removal of unwanted vegetation and plastic materials and pruning of existing trees lower branches 10 Mandays x 3 days = 30 Nos Basic rate: 520/- + 20% Municipal limits for labour component

30

624

18720

... More
Item;Engaging of JCB on hire charges as per the direction of the Departmental authority including fuel and driver batha charges 2 days x 8 hrs = 16 hrs

16

1000

16000

... More
Item;Maintenance of Individual shrubs: Trimming of shrubs once in 15 days Watering to shrubs once in a day @ 5 litres / per plant / per day (sub soil moisture shall be maintained continuously) Formation of basins for each and every plant upto 1 ft away from the plant Application of fertilizers, insecticides, fungicides etc a) with manual watering (for 12 months)

4500

612

330809.4

... More
Item;Maintenance of Lawns: Watering of the lawns @10-15 Liters/Sqmt/day basing on the season and weather conditions (sub soil moisture shall be maintained continuously) Lawn mowing and edging of the lawns in the following frequency June to November - once in 15 days December to May - once in 30 days Edging of the lawns in a such a way that the lawn grass should not penetrate into the plants and in a defined perfect geometric shapes or smooth curves Keeping the lawns always in lush green & weed-free condition Application of fertilizers, insecticides, fungicides etc a) drip system ( for 12 months )

1500

924

166339.8

... More
Item;Maintenance of Hedge/Shrub Planting: Trimming of hedges once in 15 days Watering to hedges once in a day @ 5 litres / per sqmt / per day (sub soil moisture shall be maintained continuously) Formation of basins for each and every plant upto 1 ft away from the plant Application of fertilizers, insecticides, fungicides etc a) with manual watering (for 12 months)

1200

2930

422033.76

... More
Item;Garden tree plants 18"x18"

2000

450

900000

... More
Item;Individual shrub plants 13"x13"

4000

165

660000

... More
Item;Acalipha holland red 8?x8"

3100

55

170500

... More
Item;Cannas 8?x8"

3100

55

170500

... More
Item;Mandaram 8?x8"

3100

55

170500

... More
Item;Tecoma orange 8?x8"

3100

55

170500

... More
Item;Alamanda yellow 8?x8"

3100

55

170500

... More
Item;Bombay border 8?x8"

3100

55

170500

... More
Item;Spider lilly 8"x8"

3100

55

170500

... More
Item;Leucophyllum 8"x8"

3100

55

170500

... More
Item;Acalipha red 8?x8"

3100

55

170500

... More
Item;Jetropha 8"x8"

3100

55

170500

... More
Item;Dracena Colorama 8"x8"

3100

55

170500

... More
Item;Dracena Mahatma 8"x8"

3100

55

170500

... More
Item;Padanus 8"x8"

3100

55

170500

... More
Item;Adenium

1500

600

900000

... More
Item;Aloevera

1500

175

262500

... More
Item;Euphorbia miniature

1500

80

120000

... More
Item;Sensvaria (Snake plant)

1500

350

525000

... More
Item;Saklens

1500

250

375000

... More
Item;Cactus

1500

250

375000

... More
Item;Cost and supply of 1inch dia HDPE pipe 30mts length bundle

20

2850

57000

... More
Item;Cost and conveyance of well decomposed FYM

70

1340

93848.3

... More
Item;Digging of pits 0.45x0.45x0.45

8000

2438

195086.4

... More
Item;Importation of good quality red earth

120

1228

147420

... More
Item;Pebbles

15000

20

300000

... More
Item;20 mm Metal

300

2500

750000

... More
Item;Sand for rock garden

350

2600

910000

... More
Item;DAP 45 - 50 Kgs bag

50

1450

72500

... More
Item;Rock garden: Neem cake

1500

25

37500

... More
Item;Laying of carpet grass and ramming

1500

58

87150

... More
Item;Cost of carpet grass

1500

135

202500

... More
Item;Dressing the surface to the desired shape, laying 6? layer of fine red soil, covered with a thin layer of sand, watering, rolling with hand roller, including the cost of red earth, sand and labor charges etc complete but excluding the cost of fertilizers, chemicals and grass

1500

333

500625

... More
Item;Supplying and fixing of AAC brick kerbs with 100mm thick, 600mm long and 300mm width including cost and conveyance to site and labour charges for laying true to alignment and pointing with CM(1:3) prop etc complete

3000

225

676500

... More
Item;Individual Shrubs Planting: Topiary / Palms / Garden tree planting ? Digging of 45x45x45 cm pit, filling with soil mixture of red soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants and planting the plants (excluding cost of plant material, fertilizers and chemicals (@ 20 gms/pit/sqmt))

3000

194

582210

... More
Item;Individual Shrubs Planting: Topiary / Palms / Garden tree planting ? Digging of 60x60x60 cm pit, filling with soil mixture of red soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants and planting the plants (excluding cost of plant material, fertilizers and chemicals (@ 20 gms/pit/sqmt))

1500

385

578490

... More
Item;Hedge / shrub planting: Digging the trench of size 30 cm depth, refilling the trench with red soil including cost of red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides etc., (@20 gms/pit/sqmt) complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) andplant material

1200

756

907788

... More
Item;Cost of gravel including internal transportation, application and spreading complete 8000 x 0.6 = 4800 cumt Gravel pathway: 120rmt x 1.5m x 2 rows x 2 sides x 0.15 = 108 cumt

2500

432

1081350

... More
Item;Carting of debris in shrub trench area including the loading and unloading etc complete 8000 x 0.1 = 800 cumt

800

174

139840

... More
Item;Engaging of Men and Women mazdoor for removal of unwanted vegetation and plastic materials and pruning of existing trees lower branches 20 Mandays x 30 days = 600 Nos Basic rate: 520/- + 20% Municipal limits for labour component

600

624

374400

... More
Item;Engaging of JCB on hire charges as per the direction of the Departmental authority including fuel and driver batha charges 20 days x 8 hrs = 160 hrs

150

1000

150000

... More
Item;Estimate for Development of Rock Garden Interchange at Pedda Amberpet during the year 2023-24

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.