Hyderabad Metropolitan Development Authority Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
531578Tender No
627/Lakes/II/4/UF/HMDA/2024Tender Authority
Hyderabad Metropolitan Development Authority ViewPurchaser Address
-Website
http://https://hmda.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Item;Maintenance of individual shrubs: i) Trimming once in 15 days.ii)Watering once in a day @ 5 litres / per plant / per day (sub soil moisture shall be maintained continuously).iii)Formation of basins for each and every plantupto 1 ft. away from the plant.iv)Application of fertilizers, insecticides,Fungicides (@ 20 gms/pit/sqmt) etc.,(a)With Manual watering
500
444
17765.6
Item;Maintenance of hedge planting: i) Trimming of hedges / shrubs once in 15 days.ii)Watering hedges / shrubs once in a day @ 5 litres/ per Sqmts / per day (sub soil moisture shall bemaintained continuously). iii) Formation of basins 1 ft. away from the hedge.iv)Application of fertilizers, insecticides,Fungicides (@ 20 gms/pit/sqmt) etc.,
350
2930
82062.12
Item;Maintenance of Lawns : i) Watering of lawns @10-15 litres / Sqm. / day basing on the season and weather conditions (Sub soil moisture shall be allowed)ii) Lawn moving and edging of the lawns in the following frequency. Keeping the lawn grass blade not more than 2 cm.iii) Edging of the lawns in such a way that the lawn grass do not penetrate into the plants and in a defined perfect geometric shapes or smooth curves.iv) Keeping the lawns always in lush green & weed-free condition.v) Application of fertilizers, insecticide, fungicides etc. a) With Manual watering.
1000
924
73928.8
Item;cost of Plants
7000
55
385000
Item;Digging the trench of size 30 cm depth, refilling the trench with red soil including cost of red soil and farmyardmanure at 4:1 ratio, internal transportation ofplants and planting the plants including theapplication of fertilizers and pesticides etc., (@20 gms/pit/sqmt) complete but excluding thecost of the fertilizers (@ 20 gms/pit/sqmt) andplant material.
350
756
264771.5
Item;Hedge planting
-
-
-
Item;Transportaion of Gorund cover plants Transport of plants from nursery site to planting site upto a lead of 3km including loading and unloading wherever departmental vehicles are 3km lead total lead 75Km 72x3.02=217.44+338.83
9000
556
50064.3
Item;Internal transportation of planting of the ground cover
450
30
13905
Item;Ground covers: Bed preparation 6? layer of soil mixture 3:1:1 ratio red soil, farmyard manure and river sand and application of fertilizers, smooth surface as per design including cost of soil mixture, filling of the soil mixture and internal transportation
450
305
137394
Item;Malphigea balls
30
5000
150000
Item;Terminalia mantaly
20
750
15000
Item;Umbrella topiaries
5
10000
50000
Item;Multi-Head topiaries
20
10000
200000
Item;cost of Plants
-
-
-
Item;Planting of individual shrubs: Digging the pit of size 0.75x0.75x0.75m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides (@ 20 gms/pit/sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material.
500
746
373300
Item;laying Gass Pavers flooring with ran door white 50.80MM thickness over a base of mud motor of 30MM thickness and pointing to Full depth of sttores with red soil and carpet grass including cost and conveyance of all meterial and logout charges
1300
48
62400
Item;Laying of carpet grass and ramming
1000
58
58100
Item;Cost of Carpetgrass
1000
135
135000
Item;Dressing the surface to the desired shape, laying 6? layer of fine red soil, covered with a thin layer of sand, watering, rolling with hand roller, including the cost of red earth, sand and labour charges etc complete but excluding the cost of fertilizers, chemicals and grass
1000
333
333750
Item;Formation of earthen mounds by using the available earth at site to the concave/convex land including water ,rolling with hand roller etc complete including the labour charges, watering charges ,hire charges of hand roller etc complete including all taxes etc
400
49
19700
Item;Spreading of red soil,gravel or sand including watering and rolling with hand roller irrespective of thickness in layer
724.8
22
16308
Item;Internal transport & application of red earth,gravel,soil mixture plantation areas parks
724.8
94
68450.11
Item;Supply & stacking of gravel at site for the department gauge for premeasurements and it shall be composed of wellgraded course silicious grains sharp & gritty to touch and free from dirt & other deleterious matter. Further it shall not contain lumps larger than 20 mm and the finer shall not exceed 10% passing through 75 micron is sieve and should have liquid limit and plasticity index not more than 6 as per standard specification no 138 of APSS. the cost including of transportation, loading,unloading,stackinag at the site including all labour charges, taxes & seiniorage chares etc. complete. Lawn area 832 Sqmtsx0..15=124.80 Grond cover & Creepers/Droopers/Grasses= (600Sqm) x1Mtr
724.8
204
148004.16
Item;Supply and fixing of pre cast ACC curb with size 600mm X 375mm X 110 mm semi bated at the top in M30 grade including cost and conveyence to site and labour charges for complete for laying true to aalingment and 200Mtrs X2Sides
500
450
225000
Item;Engaging of back hoe loaders (JCB,s) for clearance of sites.leveling, loading of unwanted cleared materials
50
1000
50000
Item;DEVELOPMENT OF GREENERY WORK WITH LANDSCAPING AT POTHAN CHERUVU,SHAMBIPUR,QUTHBULAPUR
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements