Forest Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 1,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
499932Tender No
253/2024/S1Tender Authority
Forest Department ViewPurchaser Address
-Website
http://http://forests.telangana.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Construction of Dormitory up to Plinth Level;Providing traditional centering, shuttering and scaffolding using Cashewrina balli props and bracings supporting wooden brackets, wooden wall plates, wooden runners and steel plate form work as per the approved plan and other accessories as per the standard trade practice including hire charges for ballies, runners, wooden members and cost and conveyance of all other consumable accessories, taxes etc complete for finished item of work.- For RCC Plinth Beam
53
950
50389.28
Construction of Dormitory up to Plinth Level;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, also Excluding centering, shuttering.- For RCC Column (Upto Plinth)
1
8540
8540
Construction of Dormitory up to Plinth Level;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, also Excluding centering, shuttering.- For RCC Plinth Beam
6
7999
47994.57
Construction of Dormitory up to Plinth Level;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc.,and overheads & contractors profit complete for finished item of work. (APSS No. 402)- For Grade Slab
9
4819
43375.26
Construction of Dormitory up to Plinth Level;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc.,and overheads & contractors profit complete for finished item of work. (APSS No. 402)- For Plinth Protection
3
4819
14458.42
Construction of Dormitory up to Plinth Level;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc.,and overheads & contractors profit complete for finished item of work. (APSS No. 402)- Below Footing
5
4819
24097.37
Construction of Dormitory up to Plinth Level;Providing Anti termite treatment as per IS 6315 (Part-2) 2001 (Pre-constructional chemical treatment measures) along the internal & external vertical faces of the columns, plinth beams, basement and top surface of the basement filling below flooring bed as per the specified procedure conforming to IS 6315 (Part-2) 2001 and other relevant approved specification duly using Chlorpyriphos / Lindane emulsifiable concentrate 20 % with 1% concentration @7.5 Liters / sqm of the vertical surface & @5.0 Liters/sqm of the horizontal surface of the sub structure to a depth of 500 mm around columns & 300 mm deep around plinth beams, basements & floor filling area including excavation channel along the wall & rodding etc & cost & conveyance of all materials to the site, cost of labour for spraying, rodding etc complete for finished item of work as per the approval of the Engineer-in-Charge
105
157
16582.11
Construction of Dormitory up to Plinth Level;Providing rubble and sand filling in layers of 22.5 to 30 cm including cost of all materials, machinery, labour, watering, ramming etc., complete with initial lead upto 50 m and all lifts.
24
1618
38833.97
Construction of Dormitory up to Plinth Level;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. APSS No.309 & 310
42
181
7617.3
Construction of Dormitory up to Plinth Level;Earth work excavation for foundations for buildings in ordinary soils and depositing on bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work including seigniorage excluding dewatering charges etc., as per SS 20 B(APSS 308)
69
225
15551.87
Construction of Dormitory up to Plinth Level;Clearing thick jungle growth ( less than 50 percent open space ) including bushes upto 30 cm / parthenium and other weeds including burning or disposing off the same as directed etc., complete.
105
3
325.08
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements