Forest Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 1,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
499938Tender No
253/2024/S1Tender Authority
Forest Department ViewPurchaser Address
-Website
http://http://forests.telangana.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Construction of Eco Hut No. 1 at Turkam Cheruvu Eco Tourism Site;Roofing will be provided with 0.5mm thick galvanized / pre painted G.I. profiled sheets fixed to the purlins with 14 size self-drilling screws with neoprene washer. Side laps are stitched with self tapping / drilling screws. End laps are to be sealed with 25x3 mm Butyl tape. The sheets are provided with anti-capillary grove.
47
922
43360.03
Construction of Eco Hut No. 1 at Turkam Cheruvu Eco Tourism Site;Supply , erecting & fixing all structural steel works like purlins, rafters, trusses and Girders erecting in position and fixing by using chain pulley blocks, Derek pole arrangements and cranes etc., complete in position including approved steel primer and two coats of Zinc chromate red oxide primer paint etc all complete including cost and conveyance of all materials to work site and all operational, incidental, labour charges
497.43
142
70865.22
Construction of Eco Hut No. 1 at Turkam Cheruvu Eco Tourism Site;Supplying and fixing Gypsum Board Fine Line Grid false ceiling (GS-FLC-4.6 as per India Gypsum) in size 600 mm x 600 mm using 12.5 mm thick/ 9.5 mm thick Gyp Board sheet tiles of size 595 mm x 595 mm or 595 mm x 1195 mm conforming to IS 2095 - 1982 fixing to Gyp steel precoated GI wall angle of size 25 mm x 25 mm x of 0.70 mm thick along the perimeter of ceiling screw fixed to brick work/ partition at 610 mm c/c and suspending the frame work using precoated GI Tee section (24 mm x 38 mm x 0.7 mm) from soffit at 1220 mm c/c fixed with GI Soffit Cleat, rawl plugs and steel expansion fasteners & connecting clip to the GI T section with 4 mm dia GI Rod with galvanised spring steel level clip of PVC unversal holding clips system at 1200 mm c/c and fixing the 12.5 mm / 9.5 mm Gypboard Sheet tiles of size 595 mm x 595 mm or 595 mm x 1195 mm and finishing two coats of drywall topcoat complete for finished item of work as per India Gypsum Ltd specification.
21
1707
35857.42
Construction of Eco Hut No. 1 at Turkam Cheruvu Eco Tourism Site;Providing, constructing and fixing of frameless Shower glass partition of 2600mm high with door glazing consisting of 12mm clear toughened glass ( Saint gobain/ Modi make) and glass to be fixed by means of aluminium 'U' channel in the floor, ceiling/bottom to glass connector, glass to glass connector, handle, doorset, floor spring, pivot etc, all the necessary fittings upto all height including scaffolding all complete as shown in attached drawing and as per the direction of PM/EIC. Cost also to include providing grooves and provision of brushed finished aluminium 'U' channel wherever required as per architect's instructions.
4
8758
35035.19
Construction of Eco Hut No. 1 at Turkam Cheruvu Eco Tourism Site;Supply and fixing Aluminium Anodised Two/ Three Track Sliding Windows as per approved drawing with aluminium anodised sections of Series C Jindal sections and Shutter top and bottom of 20988, Shutter side handle of 20709, Frame bottom of 21055 and Frame top & side of 20696 and Weather interlocking frame of 20708 with plain clear float glass 6 mm thick fixed including supply and fixing aluminium handles of 100 mm for each shutter, nylon rollers assembly and all labour charges for fixing the fixtures with required no.of screws, bolts and nuts and including labour charges for fixing the frame in position, fixing shutter to frame etc. completed for finished item of work For Window no,3 (Size 600 mm x 900mm)
1
5392
5392.84
Construction of Eco Hut No. 1 at Turkam Cheruvu Eco Tourism Site;Supply and fixing Aluminium Anodised Two/ Three Track Sliding Windows as per approved drawing with aluminium anodised sections of Series C Jindal sections and Shutter top and bottom of 20988, Shutter side handle of 20709, Frame bottom of 21055 and Frame top & side of 20696 and Weather interlocking frame of 20708 with plain clear float glass 6 mm thick fixed including supply and fixing aluminium handles of 100 mm for each shutter, nylon rollers assembly and all labour charges for fixing the fixtures with required no.of screws, bolts and nuts and including labour charges for fixing the frame in position, fixing shutter to frame etc. completed for finished item of work For Window no.2 (Size 2400 mm x 1500mm)
4
5392
21571.37
Construction of Eco Hut No. 1 at Turkam Cheruvu Eco Tourism Site;Supply and fixing Aluminium Anodised Two/ Three Track Sliding Windows as per approved drawing with aluminium anodised sections of Series C Jindal sections and Shutter top and bottom of 20988, Shutter side handle of 20709, Frame bottom of 21055 and Frame top & side of 20696 and Weather interlocking frame of 20708 with plain clear float glass 6 mm thick fixed including supply and fixing aluminium handles of 100 mm for each shutter, nylon rollers assembly and all labour charges for fixing the fixtures with required no.of screws, bolts and nuts and including labour charges for fixing the frame in position, fixing shutter to frame etc. completed for finished item of work For Window no.1(Size 1800 mm x 1500 mm)
3
5392
16178.53
Construction of Eco Hut No. 1 at Turkam Cheruvu Eco Tourism Site;Supply and fixing Flush type Doors with 35mm Thick Flush Shutters with Bond wood solied Block Board Type Faced on Both the sides with Commercial Type Plywood with teak wood frame including approved hardware. Shutter shall be finished with Melamine Laminate Sheets - Glossy Finish: 1.00 mm thick on both side and all labour charges for fixing the fixtures with required no.of screws, bolts and nuts and including labour charges for fixing the frame in position, fixing shutter to frame and hardware etc. completed for finished item of work For Single Leaf door (Size 750 mm x 2400 mm )
2
6851
13703.81
Construction of Eco Hut No. 1 at Turkam Cheruvu Eco Tourism Site;Supply and fixing Flush type Doors with 35mm Thick Flush Shutters with Bond wood solied Block Board Type Faced on Both the sides with Commercial Type Plywood with teak wood frame including approved hardware. Shutter shall be finished with Melamine Laminate Sheets - Glossy Finish: 1.00 mm thick on both side and all labour charges for fixing the fixtures with required no.of screws, bolts and nuts and including labour charges for fixing the frame in position, fixing shutter to frame and hardware etc. completed for finished item of work For Single Leaf door (Size 1000 mm x 2400 mm )
3
8660
25981.51
Construction of Eco Hut No. 1 at Turkam Cheruvu Eco Tourism Site;Providing and fixing about 550mm wide washbasin counters/vanity counters of approved design, colour and shade @ 19mm thick granite stone top; fixed on ply with necessary MS angle frame support as required, making Zari in walls/column to insert stones, making good, cutting hole for wash-basin and plumbing accessories as detailed, fixing @ 100mm high same granite stone facia patti fixed to ply with nut and bolt etc. all complete as per specifications, detailed drawings and instructions, protecting on-going and complete work as specified, work at all leads and lifts to the entire satisfaction of the PM/EIC.
1
6538
6538.45
Construction of Eco Hut No. 1 at Turkam Cheruvu Eco Tourism Site;Providing skirting to internal walls to 15cm height/risers of steps with 25mm thick polished White Bethamcherla (marble type) stone equal to flooring stones, set over base coat of CM (1:3) 12mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like Shahabad stone, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work, For 150 mm high raiser
1
969
969.21
Construction of Eco Hut No. 1 at Turkam Cheruvu Eco Tourism Site;Flooring with 22-25mm thick polished White Bethamcherla (marble type) stone set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones etc., complete, including seigniorage charges, labour charges for dressing of flooring stones etc., complete for finished item of work, but excluding the cost of conveyance of all materials. For 300mm wide tread
2
941
1883.03
Construction of Eco Hut No. 1 at Turkam Cheruvu Eco Tourism Site;Dadooing to walls with glazed full body porcelain wall tiles of size 300 x 600 mm with any type of design texture such as marble finish, wooden, bamboo, stone finishes 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, any brand as approved by Engineer - in - charge and set over a base coat of CM (1:5), 12mm thick and neat cement paste at the rate of 3.3 Kg/Sqmt. and jointed with white cement paste mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, etc. to site, seigniorage charges, sales and other taxes on all materials, and all opertional, incidental and all labour charges such as mixing of cement mortar, laying in position, curing, lift charges etc., complete for finished item of work.
18
1382
24881.85
Construction of Eco Hut No. 1 at Turkam Cheruvu Eco Tourism Site;Providing skirting to internal walls to 15 cm height/risers of steps with vitrified tiles length equal to flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials
3
1271
3814.07
Construction of Eco Hut No. 1 at Turkam Cheruvu Eco Tourism Site;Flooring with 1st quality full body porcelain vitrified tiles with any type of design texture such as marble finish, wooden, bamboo, stone finishes etc., set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials.
27
1262
34084.9
Construction of Eco Hut No. 1 at Turkam Cheruvu Eco Tourism Site;20mm thick rough cast exterior cement plaster on walls up to height of 10 metres above ground level consisting of 10mm thick backing coat of 1:3 cement mortar (1 cement : 3 sand ) and 10mm thick finishing coat of 1:3 cement mortar (1 cement : 3 coarse aggregate of size 6 mm to 10 mm ) including arrises, chamfers and / or rounded angles not exceeding 80 mm in girth.
74
449
33235.14
Construction of Eco Hut No. 1 at Turkam Cheruvu Eco Tourism Site;Providing 12 mm thick plastering in cement mortar 1:4 proportion by volume including cost of all materials, machinery, labour, scaffolding, cleaning joints, smooth finishing, curing etc., complete with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit and Overheads)
74
157
11654.9
Construction of Eco Hut No. 1 at Turkam Cheruvu Eco Tourism Site;11.5 cm wide Brick masonry for super-structure on ground floor in cm (1:3) using second class traditional size bricks including cost of all materials, seigniorage charges, labour and all operations for constructing half brick masonry, mixing cement mortar, curing etc., complete for finished item of work, but excluding conveyance charges of materials.
10
965
9659.73
Construction of Eco Hut No. 1 at Turkam Cheruvu Eco Tourism Site;Providing and constructing 230mm or more thick brick masonry in CM (1:6) prop using locally available approved quality bricks having a crushing strength not less than 35 Kg/ Sqcm including cost and conveyance of material and water to work site seigniorage and all operational, incidental labour charges such as mixing mortor, constructing masonary, lift charges, curing etc complete for finished item of work as per SS . For Above Ground
10
7875
78752.72
Construction of Eco Hut No. 1 at Turkam Cheruvu Eco Tourism Site;Construction of RR Masonry in CM (1:6) Cement: Sand) using hard granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site including cost and conveyance of all material and all operational, incidental, and labor charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., and including over heads & contractor's profit, but excluding VAT and seigniorage charges complete for finished item of work for foundation. (APSS No. 601 & 615) - For Foundation
22
4415
97131.32
Construction of Eco Hut No. 1 at Turkam Cheruvu Eco Tourism Site;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lapsplicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, laour charges such as cutting, bending placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors. (APSS No.126)
0.62
86433
53257.88
Construction of Eco Hut No. 1 at Turkam Cheruvu Eco Tourism Site;Providing traditional centering, shuttering and scaffolding using Cashewrina balli props and bracings supporting wooden brackets, wooden wall plates, wooden runners and steel plate form work as per the approved plan and other accessories as per the standard trade practice including hire charges for ballies, runners, wooden members and cost and conveyance of all other consumable accessories, taxes etc complete for finished item of work. For RCC Lintel
2.5
950
2376.85
Construction of Eco Hut No. 1 at Turkam Cheruvu Eco Tourism Site;Providing traditional centering, shuttering and scaffolding using Cashewrina balli props and bracings supporting wooden brackets, wooden wall plates, wooden runners and steel plate form work as per the approved plan and other accessories as per the standard trade practice including hire charges for ballies, runners, wooden members and cost and conveyance of all other consumable accessories, taxes etc complete for finished item of work. For RCC Roof Beam
19
950
18064.08
Construction of Eco Hut No. 1 at Turkam Cheruvu Eco Tourism Site;Providing traditional centering, shuttering and scaffolding using Cashewrina balli props and bracings supporting wooden brackets, wooden wall plates, wooden runners and steel plate form work as per the approved plan and other accessories as per the standard trade practice including hire charges for ballies, runners, wooden members and cost and conveyance of all other consumable accessories, taxes etc complete for finished item of work. For RCC Column
12
950
11408.89
Construction of Eco Hut No. 1 at Turkam Cheruvu Eco Tourism Site;Providing traditional centering, shuttering and scaffolding using Cashewrina balli props and bracings supporting wooden brackets, wooden wall plates, wooden runners and steel plate form work as per the approved plan and other accessories as per the standard trade practice including hire charges for ballies, runners, wooden members and cost and conveyance of all other consumable accessories, taxes etc complete for finished item of work. For RCC Plinth Beam
23
950
21867.05
Construction of Eco Hut No. 1 at Turkam Cheruvu Eco Tourism Site;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, also Excluding centering, shuttering.- For RCC Lintel
0.5
6419
3209.9
Construction of Eco Hut No. 1 at Turkam Cheruvu Eco Tourism Site;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, also Excluding centering, shuttering.- For RCC Roof Beam
2
6419
12839.62
Construction of Eco Hut No. 1 at Turkam Cheruvu Eco Tourism Site;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, also Excluding centering, shuttering.- For RCC Column
2
8540
17080
Construction of Eco Hut No. 1 at Turkam Cheruvu Eco Tourism Site;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, also Excluding centering, shuttering.- For RCC Plinth Beam.
3
7999
23997.29
Construction of Eco Hut No. 1 at Turkam Cheruvu Eco Tourism Site;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc.,and overheads & contractors profit complete for finished item of work. (APSS No. 402) For Grade Slab
3
4819
14458.42
Construction of Eco Hut No. 1 at Turkam Cheruvu Eco Tourism Site;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc.,and overheads & contractors profit complete for finished item of work. (APSS No. 402)-For Plinth protection
2
4819
9638.95
Construction of Eco Hut No. 1 at Turkam Cheruvu Eco Tourism Site;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc.,and overheads & contractors profit complete for finished item of work. (APSS No. 402)-Below footing
2
4819
9638.95
Construction of Eco Hut No. 1 at Turkam Cheruvu Eco Tourism Site;Providing Anti termite treatment as per IS 6315 (Part-2) 2001 (Pre-constructional chemical treatment measures) along the internal & external vertical faces of the columns, plinth beams, basement and top surface of the basement filling below flooring bed as per the specified procedure conforming to IS 6315 (Part-2) 2001 and other relevant approved specification duly using Chlorpyriphos / Lindane emulsifiable concentrate 20 % with 1% concentration @7.5 Liters / sqm of the vertical surface & @5.0 Liters/sqm of the horizontal surface of the sub structure to a depth of 500 mm around columns & 300 mm deep around plinth beams, basements & floor filling area including excavation channel along the wall & rodding etc & cost & conveyance of all materials to the site, cost of labour for spraying, rodding etc complete for finished item of work as per the approval of the Engineer-in-Charge
37
157
5843.22
Construction of Eco Hut No. 1 at Turkam Cheruvu Eco Tourism Site;Providing rubble and sand filling in layers of 22.5 to 30 cm including cost of all materials, machinery, labour, watering, ramming etc., complete with initial lead upto 50 m and all lifts.
10
1195
11958.82
Construction of Eco Hut No. 1 at Turkam Cheruvu Eco Tourism Site;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. APSS No.309 & 310
17
181
3083.19
Construction of Eco Hut No. 1 at Turkam Cheruvu Eco Tourism Site;Earth work excavation for foundations for buildings in ordinary soils and depositing on bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work including seigniorage excluding dewatering charges etc., as per SS 20 B(APSS 308)
32
225
7212.46
Construction of Eco Hut No. 1 at Turkam Cheruvu Eco Tourism Site;Clearing thick jungle growth ( less than 50 percent open space ) including bushes upto 30 cm / parthenium and other weeds including burning or disposing off the same as directed etc., complete.
37
3
114.55