Endowments Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Endowments Department Tender

Works
Civil And Construction
Opening Date8 Nov 2024
Closing Date25 Nov 2024
Tender Amount₹ 34,69,943 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Civil Work;Supplying and fixing of teak wood ornamental door shuters with 2 leaves as per temple design including cost of frame and flanks and preparation charges, fixing of shutters in position, locking arrangements etc., complete, padmam with padmarekulu & plain frame

20.29

2850

57826

... More
Civil Work;Painting to new walls with 2 coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 50 grams/ Ltr., or equivalent and shade over priming coat with cement primer water base interior Gr- on new plastered surface after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges but excluding GST etc., complete for finished item of work for external walls

367.23

1730

63561

... More
Civil Work;Supplying and fixing of scaffolding during execution of work including cost and conveyance of all materials such as Casino poles, bamboos platform, nails and coir rope etc., complete

2600

12

31200

... More
Civil Work;Supply and fixing of black granite stone including fine dressing charges and polishing to the shape and dimensions as per the approved drawing including cost and conveyance of all materials and labour charges etc., complete but excluding seigniorage charges and taxes etc., complete

1

7500

7500

... More
Civil Work;Supply and fixing of Black Granite stone including fine dressing and polishing to the shape and dimesnions as per the approved drawing including cost and conveyance of all material and labour charges etc., excluding seigniorage charges 7 taxes on all materials complete

1

25000

25000

... More
Civil Work;Plastering to brick masonry with 20mm thick single coat in CM (1:5) dubara sponge finish including cost and conveyance of all materials and labour charges, over heads & contractor profit all operationa, incidental such as scaffolding charges, lift charges, including cutting of grroves, finishing, curing but excluding GST and Seigniorage charges, etc., complete for finished item of work

34.17

2206

7540

... More
Civil Work;Plastering to brick masonry with 12mm thick single coat in CM (1:3) dubara sponge finish including cost and conveyance of all materials and labour charges, over heads & contractor profit all operationa, incidental such as scaffolding charges, lift charges, including cutting of grroves, finishing, curing but excluding GST and Seigniorage charges, etc., complete for finished item of work

282.88

1858

52571

... More
Civil Work;Brick Masonry in CM (1:8) mix using 2nd class bricks including cost and conveyance of all materials and labour charges, operational charges etc., complete but excluding seigniorage charges and taxes

19.1

8144

155559

... More
Civil Work;Impervious coat to exposed RCC roof slab surface with CM (1:3) 20 mm thick with 1 kg of water proof compound/ bag of cement laid over roof when it is in green including cost and conveyance of all materials to site, cost of, all taxes, finishing, curing, scaffolding and all operational, incidental, labour charges, etc., including cutting grooves where ever necessary etc., complete for finished item of work.

40.45

4751

19218

... More
Civil Work;Pushpa Pothikas

12

1400

16800

... More
Civil Work;Pillars

148

194

28712

... More
Civil Work;2nd Storey

35.53

28872

102584

... More
Civil Work;1st Storey

50.17

26601

133459

... More
Civil Work;Salaharam

149.14

26601

396733

... More
Civil Work;Up to Prastharam

240.61

11829

284619

... More
Civil Work;Ornamental Plastering 1" to 1 1/4" thick with base plastering 1/2" to 3/4" with CM (1:3) and top finishing 1/2" thick with CM (1:2) to bring the required ornamentation, fine and rendering with neat cement including cost and conveyance of all materials, labour charges,all incidental and operational charges, curing etc., complete. to the required shape and size as per the approved drawing and as per silpi drawing and as per silpi norms. excluding seigniorage charges, operational charges etc., complete

-

9133

-

... More
Civil Work;2nd Storey

11.86

12166

144297

... More
Civil Work;1st Storey

12.17

11852

144249

... More
Civil Work;Prakaram wall

61.57

11538

710451

... More
Civil Work;Ornamental Brick Masonry in CM (1:5) mix, using 2nd class bricks including cost and conveyance of all materials, labour charges, operational charges etc., complete but excluding seigniorage charges and taxes

-

-

-

... More
Civil Work;M.S/Tor Steel Wrought and putup including cost and conveyance of all materials and labour charges for fabrication and errection charges etc., complete

4

73338

293354

... More
Civil Work;Kodangai

12.19

1309

15961

... More
Civil Work;Roof Slab 125mm thick

182.69

1308

239108

... More
Civil Work;Roof Beam

4.6

10980

50511

... More
Civil Work;Plinth Beam

3.68

10968

40366

... More
Civil Work;Columns

3.56

11300

40231

... More
Civil Work;Pedastals

0.51

8807

4492

... More
Civil Work;Footings

2.83

8219

23261

... More
Civil Work;Supply and placing of the VRCC M20 Nominal mix Concrete ( Cement: fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 usign with 20mm size graded machine crushed Hard Granite metal (Coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggreagate(sand), coarse aggreagate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as machine mixing using concrete mixer, laying concrete, curing, including contractor's profit and over head charges etc., complete but excluding cost of steel and its fabrication charges for finished item of work including steel centering & shuttering, laying concrete, vibrating, curing etc., complete but excluding GST charges for finished item of work

-

-

-

... More
Civil Work;Construction of RR masonry in CM (1:8) Cement: Sand using hard granite stones from approved quarry including cost and conveyance of all materials like trap stones, cement, sand,water etc., to site including cost and conveyance of all materials and all operational, incidetnal and labour charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., and including over heads & contractor's profit, but excluding GST and seigniorage charges complete for finished item of work for foundation and basement

60.8

3580

217668

... More
Civil Work;C.C. (1:4:8) in prop. (Cement:fine aggregate: coarse aggregate) using 40mm size (SS 5) hard granite machine crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, labour charges, machine mixing, laying of concrete in foundations and under flooring bed, ramming in layers not exceeding 15cm thick, finishing top surface to the required level, curing etc., but excluding seigniorage charges and GST complete forfinished item of work

10.38

4000

41527

... More
Civil Work;Earth work excavation for foundation and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting ,etc., complete for finished item of work including excluding seigniorage excluding dewatering charges etc., including cost and conveyance of all material and labour charges, and contractors profit & over heads but excluding seigniorage charges and GST etc., complete for ordinary soil- Manual Means upto 3 m depth for foundation - open excavation

120.3

225

27114



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.