Tamil Nadu Generation And Distribution Corporation Limited Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date2 Jul 2024
Closing Date15 Jul 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Transporting of 9.14 m poles from Road side to pole pit

1

-

-

... More
Structure pole mass Concreting and coping 0.6x0.6x1.65 for DP structure Including cost of materials and cement.

1

-

-

... More
Erection of structure materials complete such as top channel, seating channel, belting angle, cross bracing. DPDC channel, T.I. Fitting etc., in complete.

1

-

-

... More
Excavation of stay pit 0.95x0.60x1.5m and erection of stay set complete

1

-

-

... More
Sleeve concrete for stay set including all materials

1

-

-

... More
Erection of HG fuse set with transport

1

-

-

... More
Erection of 11 KV AB switch complete set with transport

1

-

-

... More
Transformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe with salt, coal and earth refiling etc., complete including cost of coal and salt

1

-

-

... More
Erection of Aluminium bus bar pipe complete for H.T. Bus bar arrangements for DP Structure

1

-

-

... More
For Triple Pole and four pole structure

1

-

-

... More
Erection of L.T. Open type fuse unit including cable jumpering upto the line.

1

-

-

... More
Providing LT bus bar arrangements in DT structure including fixing of cross arm and insulator.

1

-

-

... More
Erection of H.T. jumpering in DP structure complete

1

-

-

... More
Erection of H.T. LAS

1

-

-

... More
Erection of L.T. LAS

1

-

-

... More
Erection of DT excluing loading and unloading

-

-

-

... More
Upto 100 KVA

1

-

-

... More
Above 100 KVA

1

-

-

... More
Painting of two coats of Aluminium paints for DP structure and iron materials including cost of paint and distemper etc.

1

-

-

... More
Loading and unloading of Distribution Transformer at site and store.

1

-

-

... More
Dismantling of failed DT from the structure including removing HT & LT connection and all other incidental works. (excluding loading and unloading)

-

-

-

... More
Upto 100 KVA

1

-

-

... More
Above 100 KVA

1

-

-

... More
Crane hire charges

1

-

-

... More
LAYING OF HT CABLE

-

-

-

... More
Excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights, indication arrangements lead, lift, labour and tools and plants etc.,

-

-

-

... More
Normal Road (earth)

1

-

-

... More
Tar Road

1

-

-

... More
Concrete Road

1

-

-

... More
Transporting of 11 KV HT cable from departmental stores to work spot by engaging private vehicle including recoiling , coiling and loading and unloading at both sites.

-

-

-

... More
3x300 sq mm XLPE (1 drum: 200 m)

1

-

-

... More
3x120 sq mm XLPE (1 drum: 200 m)

1

-

-

... More
LAYING OF HT CABLE

-

-

-

... More
Laying of 300 sq mm XLPE cable

1

-

-

... More
Laying of 120 sq mm XLPE cable

1

-

-

... More
Covering HT cable by cement "V" trough after covering the cable with good loose earth including loading, unloading and transport from stores to site and letter painting of feeding details & Cable size on the trough

1

-

-

... More
Refilling with excavated earth layers well consolidated as per std specification including all materials, lead, lift etc., complete.

1

-

-

... More
Transport back any balance cable, empty drums and other materials if any by engaging private vehicle including recoiling, coiling and loading and unloading at both sides from workspot to departmental stores (minimum 2 empty drums)

1

-

-

... More
LAYING OF LT CABLE

-

-

-

... More
Tansport of LT cable to work site by engaging vehicle including recoiling, coiling, loading & unloading at both sites.

-

-

-

... More
240 sq.mm ( 1 drum - 200 m)

1

-

-

... More
120 sq. mm ( 1 drum - 500 m)

1

-

-

... More
Excavation of cable trench size 0.45m x0.75 m including cost of providing sign boards, danger lights, indication arrangements, lead, lift, labour and T&P etc.

-

-

-

... More
Normal Road (earth)

1

-

-

... More
Tar Road

1

-

-

... More
Concrete Road

1

-

-

... More
LAYING OF LT CABLE

-

-

-

... More
Laying of 240 sq.mm cable

1

-

-

... More
Laying of 120 sq.mm cable

1

-

-

... More
Laying of 25 sq.mm cable

1

-

-

... More
Laying of 16 sq.mm cable

1

-

-

... More
Refilling with excavated earth layers as per std specification including all materials, lead, lift etc., complete.

1

-

-

... More
ERECTION OF PILLAR BOX

-

-

-

... More
Erection of pillar box including excavation of foundation pits as per standard specification 2 Nos pillar concrete walls, coping and earthing including cost of all materials, elec. works, transportion, lead, lift etc.,

-

-

-

... More
4/6/8 way & mini pillar boxes for 2 feet i-e 0.6m

1

-

-

... More
4/6/8 way & mini pillar boxes for 3 feet i-e 0.9m(Rate for HB/Con)

1

-

-

... More
4/6/8 way & mini pillar boxes for 4 feet i-e 1.2 m(Rate for HB/Con)

1

-

-

... More
4/6/8 way & mini pillar boxes for 5 feet i-e 1.5 m(Rate for HB/Con)

1

-

-

... More
Cleaning & painting with Aluminium paint 2 coats & numbering with fdr details

-

-

-

... More
8 way pillar box

1

-

-

... More
6 way pillar box

1

-

-

... More
4 way pillar box

1

-

-

... More
Mini way pillar box

1

-

-

... More
DISMANTLING OF PILLAR BOX

-

-

-

... More
Dismantling of old pillar box including associated accessories, loading on the vehicle, transporting, unloading at stores and stacking.

-

-

-

... More
4/6/8 way pillar box

1

-

-

... More
Mini pillar box

1

-

-

... More
MISCELLANEOUS - OH Erection Work

-

-

-

... More
Erection of RCC/RSJ/PSC pole and other poles including excavation of pole pit (pit size 2'x3'x1/6th of the length of poles)

-

-

-

... More
Excavation of pole pit for 7.5/8 meters

1

-

-

... More
Erection of pole pit for7.5/8 meters

1

-

-

... More
Excavaion of pole pit for 9.14 meters

1

-

-

... More
Erection of pole pit for 9.14 meters

1

-

-

... More
Base concerting 30 cm thick for one pole including of all materials

1

-

-

... More
Erection of V cross arm 3 1/2' size

1

-

-

... More
Erection of V cross arm 4 1/2' size

1

-

-

... More
Erection of Tapping channel 5 ' size

1

-

-

... More
Erection of stay set complete

1

-

-

... More
Fixing of 11 KV TI fitting

1

-

-

... More
Fixing of 33 KV TI fitting

1

-

-

... More
Fixing of LT 3 phase cross arm

1

-

-

... More
Fixing of LT TI fitting

1

-

-

... More
Fixing of single phase cross arm

1

-

-

... More
LT pin insulator with pin

1

-

-

... More
LT shackle with strap sets

1

-

-

... More
11 KV pin insulator with GI pin

1

-

-

... More
33 KV pin insulator with GI pin

1

-

-

... More
11 KV strain disc with metal parts

1

-

-

... More
33 KV strain disc with metal parts

1

-

-

... More
Fixing of Aluminium knob

1

-

-

... More
Providing of fly stay (excluding pole erection and earth excavation)

1

-

-

... More
Concreting of poles with 1:3:6 mix, 1.1/2 broken metal jelly and M sand including coping (M sand, jelly and cement, will be supplied by the contractor) (size 2x3x1/6th of pole height)

-

-

-

... More
7.5 meters/8 meters pole

1

-

-

... More
9.14 meters pole (with coping of 1' dia upto height of 1.1/2' above ground level)

1

-

-

... More
Earthing of poles

1

-

-

... More
Paving out conductor, stringing and sagging of line of all sizes of ACSR / AAAC conductors of HT/LT lines including pin binding of supports and terminating at shackle points using aluminium roller, including jumpering.

-

-

-

... More
Upto 7/2.59 mm ACSR/7/2.50 AAAC

1

-

-

... More
Upto 7/3.35 mm ACSR/7/3.15 AAAC

1

-

-

... More
Raccoon 7/4.09 per

1

-

-

... More
Dog conductor 7/4.72

1

-

-

... More
Numbering of location/each including cost of paint and labour

1

-

-

... More
Providing of guarding per span excluding of stay set erection

-

-

-

... More
2 wire flat guarding(Split neutral grounding)

1

-

-

... More
4 wire flat guarding

1

-

-

... More
Craddle guarding including earthing and earth pit excavation

1

-

-

... More
Erection of street ligh fittings 2 feet/4 feet (All materials supplied by the Board) Labour alone.

1

-

-

... More
Erection of cross bracing set

-

-

-

... More
DP structure

1

-

-

... More
TP structure

1

-

-

... More
Erection of Top Channels

-

-

-

... More
10' Centre

1

-

-

... More
15' Centre

1

-

-

... More
Erection of 33 KV centre rotating AB switch complete set

1

-

-

... More
Erection of 11 KV centre rotating AB switch complete set

1

-

-

... More
Erection of spacers , Line seperators & jumpers

-

-

-

... More
Single phase spacer / Line seperators

1

-

-

... More
Three phase spacer / Line seperators

1

-

-

... More
Provision of paa jumper per phase for LT

1

-

-

... More
Provision of paa jumper per phase for HT

1

-

-

... More
Metering set loading & unloading

-

-

-

... More
Loading

1

-

-

... More
Un loading

1

-

-

... More
Erection of metering sets

-

-

-

... More
Up to 11 metering set

1

-

-

... More
A).Loading of poles

-

-

-

... More
7.5/8 meters pole /Each

1

-

-

... More
9.14 meters pole RCC /9.0 mtr PSC/9.14 RSJ /Each

1

-

-

... More
B).Un Loading of poles

-

-

-

... More
7.5/8 meters pole (RCC/PSC)/Each

1

-

-

... More
9.14 meters pole RCC /9.0 mtr PSC/9.14 RSJ /Each

1

-

-

... More
Loading of conductor drum

-

-

-

... More
Conductor drum of all sizes with conductor

1

-

-

... More
Conductor drum of all sizes without conductor

1

-

-

... More
Un loading of conductor drum

-

-

-

... More
Conductor drum of all sizes with conductor

1

-

-

... More
Conductor drum of all sizes without conductor

1

-

-

... More
MAINTENANCE WORK

-

-

-

... More
Maintenance of DT structure for various capacity (pole mounted structure)

1

-

-

... More
DP/TP Structure maintenance

1

-

-

... More
DT maintenance

1

-

-

... More
Replacement of HT Bushing rod

1

-

-

... More
Replacement of LT Bushing rod

1

-

-

... More
Replacement of Gasket

1

-

-

... More
Structure earthi re - wiring .

1

-

-

... More
Replacement of Structure earthing in complete without material

1

-

-

... More
DT structure Yard cleaning

1

-

-

... More
Numbering of location including cost of paint and labour

1

-

-

... More
Maintenance of pillars works such as replacement of damaged insulators worn out stem bolts, lugs, termination of cables and dressing.

-

-

-

... More
8 way pillar box /6 way pillar box

1

-

-

... More
4 way pillar box

1

-

-

... More
Mini pillar box

1

-

-

... More
Fixing of Missing Doors in Pillars including materials

-

-

-

... More
MS Mini Pillar Door

1

-

-

... More
MS 4 Way Pillar Door

1

-

-

... More
MS 6 Way / 8 way Pillar Door

1

-

-

... More
FRP 4 Way Pillar Door

1

-

-

... More
Maintenance of 11 KV ABS only. (Checking of alignment and replacement of wornout fixed and moving contacts PT insulator, changing earthing and Lubricating).

-

-

-

... More
11 KV AB switch at structure in work site

1

-

-

... More
11 KV AB switch at SS

1

-

-

... More
Maintenance of 33 KV ABS only. (Checking of alignment and replacement of wornout fixed and moving contacts PT insulator, changing earthing and Lubricating).

-

-

-

... More
33 KV AB switch at SS/ Structure

1

-

-

... More
Tree cutting (Tree clearance)

-

-

-

... More
Cutting of big tree fouling on the line.

1

-

-

... More
Clearing of heavy bushes

1

-

-

... More
Jungle/bushes/velikathan clearence

1

-

-

... More
Straitening of leaned HT/LT Poles

-

-

-

... More
Pin Point location

1

-

-

... More
Cut Point Location

1

-

-

... More
Resagging of HT/LT lines for all conductor sizes

1

-

-

... More
Re-sagging (HT) 7/4.72 mm

1

-

-

... More
Re-sagging (HT/LT) 7/4.09 mm

1

-

-

... More
Re-sagging (HT/LT) 7/3.35 mm and 7/3.15 sqmm

1

-

-

... More
Re-sagging (HT/LT) 7/2.59 mm and 7/2.50 sqmm

1

-

-

... More
DISMANTLING WORKS

-

-

-

... More
Dismantling of 9.14 Mtr. Poles/RSJ/Tubular Poles

1

-

-

... More
Dismantling of 8Mtr / 7.5 Mtr Poles /

1

-

-

... More
Dismantling of Stay set complete

1

-

-

... More
Dismantling of conductors upto 7/2.59 MM including Coiling and Transporting from workspot to road side

1

-

-

... More
Dismantling of conductors 7/3.35 MM and above including Coiling and Transporting from workspot to road side

1

-

-

... More
Dismantling of damaged 6 way / 4 way Pillar box

1

-

-

... More
Dismatling of Transformer structure materials

1

-

-

... More
Dismatling of AB Switch with HG Fuse set

1

-

-

... More
Releasing of " V " X Arm

1

-

-

... More
Stacking of materials / Scarp

1

-

-

... More
Substation Maintenance

-

-

-

... More
Removing weed in Substation/Office premises per sq.mtr(Jungle Clearance)

1

-

-

... More
Hot oil circulation for replacement of Tr.oil in Pr.Tr. With filter machine & loading.

1

-

-

... More
Transporting of filter machine unit& oil drum (to&fro)

1

-

-

... More
Cleaning of 110 KV Breakers including CTs and allied maintenance work

1

-

-

... More
Cleaning of 110 KV LAS

1

-

-

... More
Cleaning of 110 KV AB Switch and applying Petroleum jelly

1

-

-

... More
Cleaning of 110 KV Power transformer insulators and other maintenance work

1

-

-

... More
Cleaning of 110 KV Bus Insulators

1

-

-

... More
Cleaning of 33/ 11 KV Breakers including CTs and allied maintenance work

1

-

-

... More
Cleaning of 33 KV /11 KV LAS

1

-

-

... More
Cleaning of 33/11 KV AB Switch including tightening of Bolt & Nutt and applying Petroleum jelly

1

-

-

... More
Cleaning of 33/11 KV KV Power transformer insulators and other maintenance work

1

-

-

... More
Cleaning of 33/11 KV Bus Insulators

1

-

-

... More
Aluminium painting in substation

1

-

-

... More
33KV structure

1

-

-

... More
11KV structure

1

-

-

... More
Power transformer

1

-

-

... More
Breaker

1

-

-

... More
ERECTION OF SINGLE POLE DT STRUCTURE

-

-

-

... More
Loading and unloading of RCC 9 / 9.14 mtr Square Pole

1

-

-

... More
Excavation of pole pit for 3' x 3' x 6' size

1

-

-

... More
Erection of RCC 9 / 9.14 mtr Square Pole including base plate erection.

1

-

-

... More
Loading , unloading and erection of HVDS DT (16 ,25 & 40 KVA)

1

-

-

... More
Excavation of stay Pit for 2' x 2' x 6' size

1

-

-

... More
Erection of stay set complete including base plate

1

-

-

... More
SINGLE POLE Transformer structure grounding and earthing of structure complete including excavtion of earth pit and erection of earth pipe and pit filled with mixture of salt, coal and earth refiling etc., complete including cost of coal and salt ,Fixing of earth connections with GI wire , bolt and Nuts.

1

-

-

... More
Erection of Transformer Structure materials

1

-

-

... More
Erection of HG fuse set

1

-

-

... More
Erection of 11 KV AB switch complete set

1

-

-

... More
Provision of Mass concreting of pole with cement , sand and jelly

1

-

-

... More
Erection of H.T. LAS

1

-

-

... More
Erection of L.T. LAS

1

-

-

... More
Erection of H.T. jumpering in DT structure complete

1

-

-

... More
Erection of L.T. Open type fuse unit including cable jumpering complete set.

1

-

-

... More
Erection of AB switch alone for DP Switch

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.