Rural Development And Panchayat Raj Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Rural Development And Panchayat Raj Department - RDPR Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date27 Jul 2024
Closing Date1 Aug 2024
Tender Amount₹ 8,04,000 
Notes
Download

Costs

Summary

Construction Of New Oht10000 Periyakariyan Kottai H/o Pulikkal Tn09-07-13 Nabard Ridf Xx1x Karimangalam Block

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Sand filling for foundation with clear river sand including cost of sand watering, ramming and consolidation etc complete as directed by TWAD Board officers.

1.44

-

-

... More
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by TWAD Board officers.

2.17

-

-

... More
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete as directed by TWAD Board officers.

2.63

-

-

... More
For items 1.5m to 4.5m below GL for FOOTING for Rectangular Portion and Trapenzoidal Portion

1.03

-

-

... More
For items 0m to 4.5m above GL Columns Brace at 3.375 m ht.

2.11

-

-

... More
For items 4.51m to 7.32m above GL Columns Brace at 6.375 m ht.

1.5

-

-

... More
For items 7.32m to 10.98 m above Column up to 9.30 m ht. For Beam at 7.00 m ht. above GL For floor slab at 7.2 m above GL

2.49

-

-

... More
For items above 7.32 m & up to 10.98 m from GL side wallFor haunches from 5.70m to 6.03m

3.65

-

-

... More
For Roof Slab 10.93m to 11.08m Deduction for manhole cover For GI Ventilating arrangements

1.07

-

-

... More
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete and as directed by TWAD Board officers. Plant Surfaces Below G.L & upto 32.30m ht for footing sides for GL Brace Bottom for Brace sides inner , for GL Brace sided Outer Roof slab bottom deduct for Manhole deduct for sidewall junction ADD Sides of Manhole

15.96

-

-

... More
For GL Brace bottom For GL Brace sides innerFor GL Brace sides outer

5.75

-

-

... More
Grid beam inside Grid beam outside Grid beam bottom Bottom of floor slab Deduction for Floor beam junction

22.26

-

-

... More
Curved Surface for 0 to 3.30m, Floor slab sides, Side wall outer, Side wall inner, Haunch (slanting) ,Sides of roof slab

44.19

-

-

... More
Square column ,Below G.L. ,Ground level to 3.30 m,D/F Brace

20.64

-

-

... More
3.30 to 4.30m ,D/F Brace

3.6

-

-

... More
4.31 to 5.30m ,

4.8

-

-

... More
5.31 to 6.30m

4.8

-

-

... More
,6.31 to 7.30m ,D/F Brace

3.6

-

-

... More
7.31 to 8.30m

4.8

-

-

... More
8.31 to 9.30m

3.36

-

-

... More
for Painting two coats with approved cement paint over one coat of priming coat over cement plastered exposed surface of the Reservoir including cleaning, preparing the surface and curing etc., complete and as directed by TWAD Board officers 1.For column 2.Brace at 2.775m above G.L. 3.Floor beam outer face 4.Inner face 5.Bottom 6.Floor slab bottom 7.Floor slab sides 8.Floor slab top offset 9.Side wall outer 10.Roof slab sides 11.Deduct column & Brace junction 12.Floor beam junction with floor slab 13.Add Roof slab Bottom projection

74.7

-

-

... More
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete and as directed by TWAD Board officers. Up to16 mm dia and above 16 mm dia rods

16.2

-

-

... More
FabricatFabrication, supply, delivery and fixing of outside MS ladder of 45cm wide made out Fabrication, supply, delivery and fixing of outside MS ladder of 45cm wide made out of 50x50x6mm MS angle for sides and steps in 16mm MS plain rods fixed at 30cm centre to centre welded, jointed etc., providing with suitable side supports, clamps, and locking arrangements provided with one coat of red oxide paint for providing access to roof top of 10,000 lit. capacity OHT of suitable inclined length, including bottom anchorage and transportation and as directed by TWAD Board officers.

1

-

-

... More
Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 (one cement, one and half sane! and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete curing etc., to required height and clear width of 4Scm consisting of two Nos. of ve~ical post of 10cm x lScm and step slab of 25mm x 25mm etc., complete and as directed by TWAD Board officers. (Vide seperate Sheet)

1

-

-

... More
Providing GI ventilating arrangements mosquito proof nylon net with 110 mm PVC pipes and cowl and as directed by TWAD Board officers

2

-

-

... More
Providing manhole cover of size 0.60 m X 0.60 m in RCC 1: 1.5:3 with suitable reinforcement and 5O x 5O x 6mm MS angle fixed along edges and as directed by TWAD Board officers.

1

-

-

... More
Refilling the foundation with excavated earth including consolidation as directed by the TWAD Board officers As per item l(a) + l(b) Less item 2,3 & 4A & 4B Total .

22.55

-

-

... More
Providing GI pipe connection to the OHT

1

-

-

... More
PIPELINE Works Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B

183.6

-

-

... More
Supply of 50mm HDPE including cost and conveyance of all materials to site and all labour charges etc., completed.

680

-

-

... More
Labour charges for laying and joining 40mm HDPE Pipes including all labour charges for laying pipes in proper alingment and gradient including cost of solvent cement etc., complete.

680

-

-

... More
Refilling with excavated earth after laying of pipes including all labour charges Solvent cement etc., complete.

182.27

-

-

... More
Provsion for Name Board.

1

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.