Pradhan Mantri Gram Sadak Yojana Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date4 Sep 2024
Closing Date18 Sep 2024
Tender Amount₹ 5,00,71,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.

-

-

-

... More
in Km. 0/0 - 8/200

10132.29

-

-

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel shoulder)

-

-

-

... More
in Km. 0/0 - 8/200

16047.85

-

-

... More
Construction of embankment using tractor with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel shoulder)

-

-

-

... More
KM 0/0 - 1/0

486.45

-

-

... More
KM 1/0 - 2/0

559.24

-

-

... More
'KM 2/0 - 3/0

560.87

-

-

... More
'KM 3/0 - 4/0

528.19

-

-

... More
'KM 4/0 - 5/0

535.05

-

-

... More
KM 5/0 - 6/0

560.87

-

-

... More
KM 6/0 - 7/0

558.56

-

-

... More
KM 7/0 - 8/0

561.26

-

-

... More
KM 8/0 - 8/200

110.87

-

-

... More
Providing layer spreading and compacting graded stone aggregate to wet mix macadam specifaction inculding premixing the material with water at OMC in mechanical mixer Pug mill carring of mixed material by tipper to site, laying in uniform layers in sub base/base course on a well prepared sub -base and compacting with smooth wheel roller of 80 to 100 KN weight to achieve the desired density inculding lighting.

-

-

-

... More
km 0/0 - 0/100

72.38

-

-

... More
Construction of Sub base & Base by way of using blended material comprising of 60% Available soil of CBR 5; 40% GSB Material, Grade II; 3% Cement by weight of soil; 1 kg of Terrasil or Equivalent per cum & 1 kg of Zycobond or Equivalent per cum Along with 20mm embedded grit Mechanically blended using a Rotavator at Optimum Moisture Content; laid in Two layers of Equivalent Depth each and duly compacted with Static Roller Including Maintaining the Camber as per specifications. Complete job , finished work to be measured.

-

-

-

... More
KM 0/0 - 1/0

325.98

-

-

... More
KM 1/0 - 2/0

372.82

-

-

... More
'KM 2/0 - 3/0

373.91

-

-

... More
'KM 3/0 - 4/0

352.11

-

-

... More
'KM 4/0 - 5/0

358.36

-

-

... More
KM 5/0 - 6/0

373.91

-

-

... More
KM 6/0 - 7/0

377.58

-

-

... More
KM 7/0 - 8/0

374.17

-

-

... More
KM 8/0 - 8/200

73.91

-

-

... More
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502

-

-

-

... More
km 0/0 - 8/200

30489.6

-

-

... More
Providing and applying Tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 - 0.30 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 502.

-

-

-

... More
km 0/0 - 8/200

30638.49

-

-

... More
Providing, laying and rolling of close-graded premix surfacing material of 25 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 ( Mix Seal Surfacing - Using Waste Plastic )

-

-

-

... More
KM 0/0 - 1/0

3845.63

-

-

... More
KM 1/0 - 2/0

3750

-

-

... More
'KM 2/0 - 3/0

3750

-

-

... More
'KM 3/0 - 4/0

3600.01

-

-

... More
'KM 4/0 - 5/0

3605.48

-

-

... More
KM 5/0 - 6/0

3750

-

-

... More
KM 6/0 - 7/0

3802.05

-

-

... More
KM 7/0 - 8/0

3750

-

-

... More
KM 8/0 - 8/200

750

-

-

... More
Provision of 15 nos rumble strips with covered with premix bituminous carpet, 15-20mm high at centre, 250mm wide placed at 1m centre to centre approved locations to control speed, marked with w hile strips of road making paint.

-

-

-

... More
KM 0/0 - 1/0

5.62

-

-

... More
KM 1/0 - 2/0

5.62

-

-

... More
'KM 2/0 - 3/0

5.62

-

-

... More
'KM 3/0 - 4/0

5.62

-

-

... More
'KM 4/0 - 5/0

5.62

-

-

... More
KM 5/0 - 6/0

5.62

-

-

... More
KM 6/0 - 7/0

5.62

-

-

... More
KM 7/0 - 8/0

5.62

-

-

... More
KM 8/0 - 8/200

5.62

-

-

... More
Providing and fixing Name board

1

-

-

... More
Providing and Fixing 'Logo' of PMGSY Project

5

-

-

... More
Providing and Fixing 'Citizen information Board' of PMGSY Project

2

-

-

... More
Providing and Fixing 'Maintenance information Board' of PMGSY Project

1

-

-

... More
Providing and fixing of Retro Reflectorised Cautionary , Mandatory Signs with Definition Plate made out of High Intensity Grade Prismatic Sheeting conforming to IRC-67:2010 & ASTM D 4956-09,Type IV Specification and Fixed over 1.5mm thick Aluminium Sheet fixed on back support Frame of 25mm x 25mm x 3mm Mild steel angle Iron post 75mm x 75mm x 6mm firmly fixed to the ground by means of properly designed foundation with M15 Grade cement concrete 45cm x 45cm x 60cm below Ground level etc complete including 7 Years warrenty for the Retro Reflective Sheeting as per Clause 6.9 of IRC 67 - 2010 Specification ( as per MORTH & Speccification no : 801 )

-

-

-

... More
90 Cm Equilateral triangle ( Cautionary ) sign board

1

-

-

... More
60 Cm Circular ( Mandatory ) sign board Triangle

8

-

-

... More
Reflector

48

-

-

... More
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703

-

-

-

... More
(ii) Ordinary Kilometer Stone (Precast)

8

-

-

... More
(iii) 200 m stone (precast)

33

-

-

... More
Road Marking with hot applied hermoplastic compound with Reflectorising Glass Beads on Bituminous surface

1640

-

-

... More
Provision for CD Works

-

-

-

... More
Construction of 1.5 m RCC Slab culvert @ Ch. 1230,1430,2850,3425,3836,4064,4485,5700,6480,6852,8084, of Gudamalai to Nanankarai road

-

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
Culvert @ Ch. Km : 1 / 0 - 2 / 0

90.09

-

-

... More
Culvert @ Ch. Km : 1 / 0 - 2 / 0

90.09

-

-

... More
Culvert @ Ch. Km : 2 / 0 - 3 / 0

90.09

-

-

... More
Culvert @ Ch. Km : 3 / 0 - 4 / 0

90.09

-

-

... More
Culvert @ Ch. Km : 3 / 0 - 4 / 0

90.09

-

-

... More
Culvert @ Ch. Km : 4 / 0 - 5 / 0

90.09

-

-

... More
Culvert @ Ch. Km : 4 / 0 - 5 / 0

90.09

-

-

... More
Culvert @ Ch. Km : 5 / 0 - 6 / 0

90.09

-

-

... More
Culvert @ Ch. Km : 6 / 0 - 7 / 0

90.09

-

-

... More
Culvert @ Ch. Km : 6 / 0 - 7 / 0

90.09

-

-

... More
Culvert @ Ch. Km : 8 / 0 - 8 / 200

90.09

-

-

... More
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.

-

-

-

... More
Culvert @ Ch. Km : 1 / 0 - 2 / 0

10.29

-

-

... More
Culvert @ Ch. Km : 1 / 0 - 2 / 0

10.29

-

-

... More
Culvert @ Ch. Km : 2 / 0 - 3 / 0

10.29

-

-

... More
Culvert @ Ch. Km : 3 / 0 - 4 / 0

10.29

-

-

... More
Culvert @ Ch. Km : 3 / 0 - 4 / 0

10.29

-

-

... More
Culvert @ Ch. Km : 4 / 0 - 5 / 0

10.29

-

-

... More
Culvert @ Ch. Km : 4 / 0 - 5 / 0

10.29

-

-

... More
Culvert @ Ch. Km : 5 / 0 - 6 / 0

10.29

-

-

... More
Culvert @ Ch. Km : 6 / 0 - 7 / 0

10.29

-

-

... More
Culvert @ Ch. Km : 6 / 0 - 7 / 0

10.29

-

-

... More
Culvert @ Ch. Km : 8 / 0 - 8 / 200

10.29

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using M15 Grade HBG metal , including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.for foundation

-

-

-

... More
Culvert @ Ch. Km : 1 / 0 - 2 / 0

10.29

-

-

... More
Culvert @ Ch. Km : 1 / 0 - 2 / 0

10.29

-

-

... More
Culvert @ Ch. Km : 2 / 0 - 3 / 0

10.29

-

-

... More
Culvert @ Ch. Km : 3 / 0 - 4 / 0

10.29

-

-

... More
Culvert @ Ch. Km : 4 / 0 - 5 / 0

10.29

-

-

... More
Culvert @ Ch. Km : 3 / 0 - 4 / 0

10.29

-

-

... More
Culvert @ Ch. Km : 4 / 0 - 5 / 0

10.29

-

-

... More
Culvert @ Ch. Km : 5 / 0 - 6 / 0

10.29

-

-

... More
Culvert @ Ch. Km : 6 / 0 - 7 / 0

10.29

-

-

... More
Culvert @ Ch. Km : 6 / 0 - 7 / 0

10.29

-

-

... More
Culvert @ Ch. Km : 8 / 0 - 8 / 200

10.29

-

-

... More
Cement concrete 1 : 2 : 4 mix using M20 Grade HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.(Below Sill Level)

-

-

-

... More
Culvert @ Ch. Km : 1 / 0 - 2 / 0

53.78

-

-

... More
Culvert @ Ch. Km : 1 / 0 - 2 / 0

53.78

-

-

... More
Culvert @ Ch. Km : 2 / 0 - 3 / 0

53.78

-

-

... More
Culvert @ Ch. Km : 3 / 0 - 4 / 0

53.78

-

-

... More
Culvert @ Ch. Km : 4 / 0 - 5 / 0

53.78

-

-

... More
Culvert @ Ch. Km : 3 / 0 - 4 / 0

53.78

-

-

... More
Culvert @ Ch. Km : 4 / 0 - 5 / 0

53.78

-

-

... More
Culvert @ Ch. Km : 5 / 0 - 6 / 0

53.78

-

-

... More
Culvert @ Ch. Km : 6 / 0 - 7 / 0

53.78

-

-

... More
Culvert @ Ch. Km : 6 / 0 - 7 / 0

53.78

-

-

... More
Culvert @ Ch. Km : 8 / 0 - 8 / 200

53.78

-

-

... More
Cement concrete 1 : 2 : 4 mix using M20 Grade HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.(Above Sill Level)

-

-

-

... More
Culvert @ Ch. Km : 1 / 0 - 2 / 0

33.01

-

-

... More
Culvert @ Ch. Km : 1 / 0 - 2 / 0

33.01

-

-

... More
Culvert @ Ch. Km : 2 / 0 - 3 / 0

33.01

-

-

... More
Culvert @ Ch. Km : 3 / 0 - 4 / 0

33.01

-

-

... More
Culvert @ Ch. Km : 4 / 0 - 5 / 0

33.01

-

-

... More
Culvert @ Ch. Km : 3 / 0 - 4 / 0

33.01

-

-

... More
Culvert @ Ch. Km : 4 / 0 - 5 / 0

33.01

-

-

... More
Culvert @ Ch. Km : 5 / 0 - 6 / 0

33.01

-

-

... More
Culvert @ Ch. Km : 6 / 0 - 7 / 0

33.01

-

-

... More
Culvert @ Ch. Km : 6 / 0 - 7 / 0

33.01

-

-

... More
Culvert @ Ch. Km : 8 / 0 - 8 / 200

33.01

-

-

... More
Cement concrete 1 : 2 : 4 mix using M20 Grade HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.(Above Sill Level)

-

-

-

... More
Culvert @ Ch. Km : 1 / 0 - 2 / 0

3.36

-

-

... More
Culvert @ Ch. Km : 1 / 0 - 2 / 0

3.36

-

-

... More
Culvert @ Ch. Km : 2 / 0 - 3 / 0

3.36

-

-

... More
Culvert @ Ch. Km : 3 / 0 - 4 / 0

3.36

-

-

... More
Culvert @ Ch. Km : 4 / 0 - 5 / 0

3.36

-

-

... More
Culvert @ Ch. Km : 3 / 0 - 4 / 0

3.36

-

-

... More
Culvert @ Ch. Km : 4 / 0 - 5 / 0

3.36

-

-

... More
Culvert @ Ch. Km : 5 / 0 - 6 / 0

3.36

-

-

... More
Culvert @ Ch. Km : 6 / 0 - 7 / 0

3.36

-

-

... More
Culvert @ Ch. Km : 6 / 0 - 7 / 0

3.36

-

-

... More
Culvert @ Ch. Km : 8 / 0 - 8 / 200

3.36

-

-

... More
Cement concrete 1:1.5:3 using M25 Grade HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.

-

-

-

... More
Culvert @ Ch. Km : 1 / 0 - 2 / 0

3.31

-

-

... More
Culvert @ Ch. Km : 1 / 0 - 2 / 0

3.31

-

-

... More
Culvert @ Ch. Km : 2 / 0 - 3 / 0

3.31

-

-

... More
Culvert @ Ch. Km : 3 / 0 - 4 / 0

3.31

-

-

... More
Culvert @ Ch. Km : 4 / 0 - 5 / 0

3.31

-

-

... More
Culvert @ Ch. Km : 3 / 0 - 4 / 0

3.31

-

-

... More
Culvert @ Ch. Km : 4 / 0 - 5 / 0

3.31

-

-

... More
Culvert @ Ch. Km : 5 / 0 - 6 / 0

3.31

-

-

... More
Culvert @ Ch. Km : 6 / 0 - 7 / 0

3.31

-

-

... More
Culvert @ Ch. Km : 6 / 0 - 7 / 0

3.31

-

-

... More
Culvert @ Ch. Km : 8 / 0 - 8 / 200

3.31

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

-

-

-

... More
Culvert @ Ch. Km : 1 / 0 - 2 / 0

0.35

-

-

... More
Culvert @ Ch. Km : 1 / 0 - 2 / 0

0.35

-

-

... More
Culvert @ Ch. Km : 2 / 0 - 3 / 0

0.35

-

-

... More
Culvert @ Ch. Km : 3 / 0 - 4 / 0

0.35

-

-

... More
Culvert @ Ch. Km : 4 / 0 - 5 / 0

0.35

-

-

... More
Culvert @ Ch. Km : 3 / 0 - 4 / 0

0.35

-

-

... More
Culvert @ Ch. Km : 4 / 0 - 5 / 0

0.35

-

-

... More
Culvert @ Ch. Km : 5 / 0 - 6 / 0

0.35

-

-

... More
Culvert @ Ch. Km : 6 / 0 - 7 / 0

0.35

-

-

... More
Culvert @ Ch. Km : 6 / 0 - 7 / 0

0.35

-

-

... More
Culvert @ Ch. Km : 8 / 0 - 8 / 200

0.35

-

-

... More
Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications

-

-

-

... More
Culvert @ Ch. Km : 1 / 0 - 2 / 0

15

-

-

... More
Culvert @ Ch. Km : 1 / 0 - 2 / 0

15

-

-

... More
Culvert @ Ch. Km : 2 / 0 - 3 / 0

15

-

-

... More
Culvert @ Ch. Km : 3 / 0 - 4 / 0

15

-

-

... More
Culvert @ Ch. Km : 4 / 0 - 5 / 0

15

-

-

... More
Culvert @ Ch. Km : 3 / 0 - 4 / 0

15

-

-

... More
Culvert @ Ch. Km : 4 / 0 - 5 / 0

15

-

-

... More
Culvert @ Ch. Km : 5 / 0 - 6 / 0

15

-

-

... More
Culvert @ Ch. Km : 6 / 0 - 7 / 0

15

-

-

... More
Culvert @ Ch. Km : 6 / 0 - 7 / 0

15

-

-

... More
Culvert @ Ch. Km : 8 / 0 - 8 / 200

15

-

-

... More
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab

-

-

-

... More
Culvert @ Ch. Km : 1 / 0 - 2 / 0

4.5

-

-

... More
Culvert @ Ch. Km : 1 / 0 - 2 / 0

4.5

-

-

... More
Culvert @ Ch. Km : 2 / 0 - 3 / 0

4.5

-

-

... More
Culvert @ Ch. Km : 3 / 0 - 4 / 0

4.5

-

-

... More
Culvert @ Ch. Km : 4 / 0 - 5 / 0

4.5

-

-

... More
Culvert @ Ch. Km : 3 / 0 - 4 / 0

4.5

-

-

... More
Culvert @ Ch. Km : 4 / 0 - 5 / 0

4.5

-

-

... More
Culvert @ Ch. Km : 5 / 0 - 6 / 0

4.5

-

-

... More
Culvert @ Ch. Km : 6 / 0 - 7 / 0

4.5

-

-

... More
Culvert @ Ch. Km : 6 / 0 - 7 / 0

4.5

-

-

... More
Culvert @ Ch. Km : 8 / 0 - 8 / 200

4.5

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

-

-

-

... More
Culvert @ Ch. Km : 1 / 0 - 2 / 0

12

-

-

... More
Culvert @ Ch. Km : 1 / 0 - 2 / 0

12

-

-

... More
Culvert @ Ch. Km : 2 / 0 - 3 / 0

12

-

-

... More
Culvert @ Ch. Km : 3 / 0 - 4 / 0

12

-

-

... More
Culvert @ Ch. Km : 4 / 0 - 5 / 0

12

-

-

... More
Culvert @ Ch. Km : 3 / 0 - 4 / 0

12

-

-

... More
Culvert @ Ch. Km : 4 / 0 - 5 / 0

12

-

-

... More
Culvert @ Ch. Km : 5 / 0 - 6 / 0

12

-

-

... More
Culvert @ Ch. Km : 6 / 0 - 7 / 0

12

-

-

... More
Culvert @ Ch. Km : 6 / 0 - 7 / 0

12

-

-

... More
Culvert @ Ch. Km : 8 / 0 - 8 / 200

12

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
Culvert @ Ch. Km : 1 / 0 - 2 / 0

8.78

-

-

... More
Culvert @ Ch. Km : 1 / 0 - 2 / 0

8.78

-

-

... More
Culvert @ Ch. Km : 2 / 0 - 3 / 0

8.78

-

-

... More
Culvert @ Ch. Km : 3 / 0 - 4 / 0

8.78

-

-

... More
Culvert @ Ch. Km : 4 / 0 - 5 / 0

8.78

-

-

... More
Culvert @ Ch. Km : 3 / 0 - 4 / 0

8.78

-

-

... More
Culvert @ Ch. Km : 4 / 0 - 5 / 0

8.78

-

-

... More
Culvert @ Ch. Km : 5 / 0 - 6 / 0

8.78

-

-

... More
Culvert @ Ch. Km : 6 / 0 - 7 / 0

8.78

-

-

... More
Culvert @ Ch. Km : 6 / 0 - 7 / 0

8.78

-

-

... More
Culvert @ Ch. Km : 8 / 0 - 8 / 200

8.78

-

-

... More
Construction of 0.6 m RCC Cover Slab culvert @ Ch.6320 of Gudamalai to Nanankarai road

-

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
Culvert @ Ch. 6320

20.33

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
Culvert @ Ch. 6320

3.39

-

-

... More
Cement concrete 1 : 2 : 4 mix using M20 Grade HBG metal , including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.for foundation.(Above Sill Level)

-

-

-

... More
Culvert @ Ch. 6320

9.17

-

-

... More
Cement concrete 1:1.5:3 using M25 Grade HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.

-

-

-

... More
Culvert @ Ch. 6320

1.69

-

-

... More
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.

-

-

-

... More
Culvert @ Ch. 6320

0.16

-

-

... More
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.

-

-

-

... More
Culvert @ Ch. 6320

4.88

-

-

... More
Providing Existing 22row 900mm dia piped cause way Wearing Coat only @ CH 4893 - 4936m.

-

-

-

... More
Construction of Cell Fill Compacted Concrete Pavement (M30) over prepared sub base with coarse and fine aggregates conforming to IS:383, the size of coarse aggregate not exceeding 25 mm minimum cement content of 375 kg per cum, mixing in concrete mixer at optimum moisture content, transporting to site, laying with wheel barrows or steel pans or with mechanical paver, compacting with plate vibrator, to achieve the designed flexural strength, finishing and curing as per Technical Specification.

-

-

-

... More
Km 4/0 - 5/0

25.8

-

-

... More
Dismantling Existing CD works @ Km. 6320 , 1430 , 3425 , 3836 , 4064 , 4485 ,5700 ,6852 ,8084 , 2850 of Gudamalai to Nanankarai road

-

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
Ch.1430 , 3425 , 3836

67.6

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
Ch.1430 , 3425 , 3836

5.63

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202., Reinforced Cement Concrete

-

-

-

... More
Ch.6320

0.81

-

-

... More
Removing all types of Hume pipes and stacking within a lead of 1000 m including Earthwork and Dismantling of Masonry Works as per Technical Specification Clause 202

-

-

-

... More
Ch.1430 , 3425 , 3836

54

-

-

... More
Construction of Protective work at KM 2450-2500, 2540-2555, 2750-2810, 3330-3345, 3655-3670, 4883-4893, 4936-4946, 5125-5145, 5420-5435, 7530-7565 of Gudamalai to Nanankarai road

-

-

-

... More
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.

-

-

-

... More
Km : 2 / 0 - 3 / 0

126

-

-

... More
Km : 3 / 0 - 4 / 0

39.38

-

-

... More
Km : 4 / 0 - 5 / 0

54

-

-

... More
Km : 5 / 0 - 6 / 0

36.75

-

-

... More
km : 7 / 0 - 8 / 0

63.75

-

-

... More
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.

-

-

-

... More
Km : 2 / 0 - 3 / 0

50.4

-

-

... More
Km : 3 / 0 - 4 / 0

15.75

-

-

... More
Km : 4 / 0 - 5 / 0

21.6

-

-

... More
Km : 5 / 0 - 6 / 0

11.9

-

-

... More
km : 7 / 0 - 8 / 0

25.5

-

-

... More
Cement concrete 1 : 2 : 4 mix using M20 Grade HBG metal , including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.for foundation.(Below Sill Level)

-

-

-

... More
Km : 2 / 0 - 3 / 0

130.05

-

-

... More
Km : 3 / 0 - 4 / 0

39.16

-

-

... More
Km : 4 / 0 - 5 / 0

52.2

-

-

... More
Km : 5 / 0 - 6 / 0

39.38

-

-

... More
km : 7 / 0 - 8 / 0

63

-

-

... More
Cement concrete 1 : 2 : 4 mix using M20 Grade HBG metal , including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.for foundation.(above Sill Level)

-

-

-

... More
Km : 2 / 0 - 3 / 0

130.21

-

-

... More
Km : 3 / 0 - 4 / 0

55.07

-

-

... More
Km : 4 / 0 - 5 / 0

78.81

-

-

... More
Km : 5 / 0 - 6 / 0

25.4

-

-

... More
km : 7 / 0 - 8 / 0

82.56

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

-

-

-

... More
Km : 2 / 0 - 3 / 0

73

-

-

... More
Km : 3 / 0 - 4 / 0

20

-

-

... More
Km : 4 / 0 - 5 / 0

28

-

-

... More
Km : 5 / 0 - 6 / 0

23

-

-

... More
km : 7 / 0 - 8 / 0

33

-

-

... More
Providing and fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications

-

-

-

... More
Km : 2 / 0 - 3 / 0

5.32

-

-

... More
Km : 5 / 0 - 6 / 0

1.5

-

-

... More
Km : 5 / 0 - 6 / 0

3.1

-

-

... More
Routine Maintenance after completion of work the road sufrace and shoulder to be maintained in proper condition to make them free from excessive edge drop offs, roughness, scouring and pot holes and cleaning of surface drain including culverts for frre flow of water. Relettering name boards and K.M & H.M stone and other maintenance operation required to keep the road traffic worthly at all the time for the maintenance period for the following years. As per General condition of contract para 32.2.2

-

-

-

... More
For 1st Year

8.2

-

-

... More
For 2nd Year

8.2

-

-

... More
For 3rd Year

8.2

-

-

... More
For 4th Year

8.2

-

-

... More
For 5th Year

8.2

-

-

... More
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.