Municipal Administration And Water Supply Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Municipal Administration And Water Supply Department - MAWS Tender
Civil And Construction
Eprocure
Opening Date18 Nov 2024
Closing Date27 Nov 2024
Tender Amount₹ 4,99,000
Costs
EMD
₹ 4,990Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Reconstruction Of Swd And Culvert At Periyar Street North Side In Ward No.30,north Zone
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MAWS_501683_30Tender No
E3/NorthZone/2024-25Tender Authority
Municipal Administration And Water Supply Department ViewPurchaser Address
-Website
http://https://www.tn.gov.in/maws/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 cum. in volume including rough dressing and dumping the excavated materials away from work site manually within 10m initial lead and 2m initial lift as per the direction of Engineer-in-charge for Drain.
90
-
-
Cement concrete 1:4:8 (one cement, four sand and eight aggregate) using 40mm hard broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted etc., complete complying with standard specification.
10.5
-
-
Supplying and erecting SHUTTTERING including necessary supports for plane surfaces etc, using mild steel sheets and BG 10 stiffened with welded mild steel angles for boarding supported by Casuarinas props at suitable intervals etc., complete complying with standard specification and as directed.
190
-
-
Cement concrete 1:3:6 (one cement, three sand and six aggregate ) using 20mm hard broken granite stone jelly for all CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete.
33
-
-
Supplying and erecting CENTERING for sides and soffits including supports and strutting up to 3.29 m high for plane surfaces such as RCC SLABS, RECTANGULAR BEAMS, TEE or ELL BEAMS, LINTELS, BED BLOCKS. STAIRCASE WAIST, LANDING SLAB, LANDING BEAM and CANOPY etc., in all floors with all cross bracings using mild steel sheets of size 90cm X 60cm and BG 10 stiffened with welded mild steel angles of size 25mm * 25mm * 3mm for boarding laid over country wood joists of size 10cm X 6.50cm spaced at about 90cm centre to centre and supported by Casuarinas props of 10cm to 13cm dia spaced at 75cm centre to centre etc., complete and as directed.
8
-
-
Cement concrete 1:1.5:3 (one cement, one and a half sand and three aggregate) using 20mm hard broken granite stone jelly for All RCC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing, vibrator charges etc., complete and also including fixing fan clamps and fixtures in RCC works wherever necessary as directed by departmental officer etc., complete.
2
-
-
PLASTERING with cement mortar 1:5(one cement and five sand by volume) 12mm thick for all internal/external surfaces like super structure, rainwater, ducts, elevation in all floors complying with standard specifications.
36
-
-
Supplying, fabricating and placing in position TMT/CTD rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification.
2
-
-
Supplying of man hole cover and frame (SFRC) IS 12592 including fixing etc. completed 60x 60 CM square type etc., complete complying with standard specification.
1
-
-
Cement concrete 1:2:4 (one cement, two sand and four aggregate ) using 20mm gauge hard broken granite stone jelly for All CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete..
1
-
-
Conveying the debris,earth ,silt etc from the site 0 to 15 km distance at the etc., compelete
90
-
-
Add :- GST @ 18%
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements