Municipal Administration And Water Supply Department Tender
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Municipal Administration And Water Supply Department - MAWS Tender
Civil And Construction
Eprocure
Opening Date16 Sep 2024
Closing Date3 Oct 2024
Tender Amount₹ 1,68,00,000
Costs
EMD
₹ 1,68,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MAWS_484649_1Tender No
2105/2024/E1Tender Authority
Municipal Administration And Water Supply Department ViewPurchaser Address
-Website
http://https://www.tn.gov.in/maws/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
M Sand filling for foundation with river sand including consolidation ramming etc. complete as per standard specifications and as directed by the Engineer-incharge
20.83
-
-
Plain cement concrete 1:4:8 using 40 mm hard broken granite metal for levelling course including cost of placikng, ramming, consolidating, curing etc. complete for footings.(1.5m to 4.5m below GL)
15.47
-
-
R.C.C.M 30 design mix using 20 mm size hard broken granite stone for the following items excluding the cost of reinforcement and centeringkl charges but including the cost of mixing, placing in position, consolidating, vibrating of concrete, curing etc. complete complying with standard specifications and as directed by Dept officers.a) Beyond 1.5 m below GL
38.93
-
-
Upto 1.5 m below G.L.
7.58
-
-
Upto 4.50 m ht. Above G.L.
13.05
-
-
From 4.50 m to 7.32 m ht. From G.L.
7.2
-
-
From 7.32 m to 10.98 m ht. From G.L.
9.17
-
-
From 10.98 m to 14.64 m ht. From G.L.
9.34
-
-
From 14.64 m to 16.00m
66.24
-
-
From 16.00 m to 20.05m
24.13
-
-
Centering soffits of RCC works including strutting and shuttering charges etc., complete for the followinga) Column 0 to 3.3m ht above GL and below GL
78
-
-
Column above 3.3m to 4.3m ht from GL
14.2
-
-
column above 4.3 m to 5.3m ht from GL
16.2
-
-
column above 5.3 m to 6.3m ht from GL
16.2
-
-
column above 6.3 m to 7.3m ht from GL
15.3
-
-
Column above 7.3m to 8.3m ht from GL
14.7
-
-
column above 8.3 m to 9.3m ht from GL
16.2
-
-
column above 9.3 m to 10.3m ht from GL
16.2
-
-
column above 10.3 m to 11.3m ht from GL
13.8
-
-
column above 11.3 m to 12.3m ht from GL
16.2
-
-
column above 12.3 m to 13.3m ht from GL
16.2
-
-
column above 13.3 m to 14.3m ht from GL
16.2
-
-
column above 14.3 m to 15.3m ht from GL
9.18
-
-
column above 15.3 m to 16.3m ht from GL
1.03
-
-
Below GL upto 3.3m above GL
73.15
-
-
3.3 m to 4.3m ht from GL
147.74
-
-
6.3 m to 7.3m ht from GL
26.71
-
-
7.3 m to 8.3m ht from GL
24.28
-
-
10.30 m to 11.30m ht from GL
50.99
-
-
15.3 m to 16.3 m from GL
151.41
-
-
From 0 to 3.3m from floor level
224.5
-
-
from 3.3m to 4.3 m ht from floor level
54.25
-
-
Supplying, fabricating and placing in position of RTS grills for reinforcement for various members including cost of steel for all RCC works etc., complete as per standard specifications and as directed by Engineer-in-charge.
214.3
-
-
Ceiling Plastering for RCC slab and beams in CM 1:3 - 10 mm thick including hacking and curing etc complete.
742.97
-
-
White wasing one coat over new surface with approved quality of lime including cost of cleaning surface thoroughly scaffolding and taxes etc. all complete as per specification and direction of Engineer
742.97
-
-
Painting two coats with approved cement paint best quality over the outer wall surface including cost of cement paint etc. complete complying with standard specification etc., complete as per standard specifications and as directed by Engineer-in-charge
742.97
-
-
Labour charges for Painting Emblem in accordance with the size and specifications as approved by the Board on the Service Reservoirs including cost of all consumables, one coat of base paint, scaffolding charges including painting Logo on the Service Reservoirs.
5
-
-
Providing Cut stone set in CM 1:3 (one cement and three sand) using well dressed cut stone supporting inlet pipe of size 0.45 x 0.45 x 0.15m for service reservoir etc., complete as per standard specifications and as directed by Engineer-in-charge
0.03
-
-
Providing and fixing RCC inside access ladder of approved pattern and design in RCC 1:1.5:3 design mix of ISS gauge 0.40m width, 0.10m thickness, 0.12m breadth for side post, 0.05m thickness 0.12m breadth for steps with suitable inclination including cost of cement, reinforcement centering, finishing, curing etc., complete and as directed by TWAD Board Officers.
8.4
-
-
Supply, delivery and fixing in position of CI manhole of size 0.60 m x 0.60 m including locking arrangement, cost of materials etc. complete and as directed by the Dept. officers.
2
-
-
Providing RCC (1:1.5:3) Ventilator using 20mm HBG stone including cost of all materials, centering, shuttering, strutting,reinforcement, placing of concrete, finishing, curing and fixing in position on the roof slab with mosquito proof net arrangement and etc., complete and as directed by the officers incharge (As per Annexure )
2
-
-
Providing pipe connection by lifting pipes and specials in vertical direction and placing the same for required alignment including lifting the pipes and specials in various heights of inlet, outlet, overflow and scour including earthwork excavation conveying the pipe and specials into the trenches, laying to proper grade and alignment cutting, threading and jointing with jointing materials with required specification including labour charges and supply of valves pipes, specials MS Clamps to fix the pipes with the columns including all taxes duties and connected charges etc. complete and taxes duties and connected charges etc. complete and as directed by Engineer in charge.
1
-
-
Refilling the foundation with excavated Soil (other than sand) in layers of not more than 15cm thick, watering, well ramming, consolidating, complying with standard specification and as directed by Engineer .
195.15
-
-
Disposal of surplus earth including loading & unloading, conveyance within a distance of 3 Km and spreading as directed by the Engineer-In-Charge.
142.4
-
-
Construction of RCC Spiral stair case in R.C.C. 1:1 1/2 : 3 (M 20 using 20mm HBGS) of 1.80m dia of required height for approach to the roof of service reservoir with RCC Handrails as per type design No. Sanitary Engineer/ PH (M) No. 18/64-65 sanitary Engineer (PH) 3/64 including necessary earthwork excavation in various soil met with at the site of work for providing foundation concrete in C.C. 1:4:8 mix, RCC footing 1:1 1/2:3 mix, G.L. platform etc. including cost of steel reinforcement, fabrication charges, scaffolding, centering, precasting charges, cement, painting etc., complete and as directed by the the officers incharge The stair case shall be braced to the column of service Reservoir at suitable inverval and as directed by the officers incharge (As per Annexure)
1
-
-
Supply and fixing of RCC Hand Rails of 1 m height over the top of Roof slab in RCC 1:1 1/2 :3 (One Cement one and half sand and three hard blue granite stone of 20mm size ISS gauge) of approved pattern and design including the cost of cement, reinforcement, centering, precasting, finishing curing etc., complete as directed by the (As per Annexure )
34.07
-
-
Supply, delivery and fixing in position of water level indicator with float of approved pattern for inner and outer compartments including cost of materials etc. and as directed by the Dept. officers.
1
-
-
Inlet
1
-
-
Outlet
1
-
-
Scour
1
-
-
Overflow
1
-
-
Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram,gravel,stoney earth and earth mixed with small size boulders SS.20B in ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring and baling out water wherever necessary refilling the sides of foundation with excavated soil other than sand in layers of 15cm thick well rammed and completed depositing the surplus excavated soil with in the compound in places shown by the departmental officers with intial lead and lifts and cleaning and levelling the site etc.,complete with standard specificationa) Footings
38
-
-
Supplying and filling in foundation and basement with filling n layers of not more than 15cm.thick well rammed watered and compacted -1m3 etc., complete complying with standard specification.
4
-
-
Plain Cement concrete 1:4:8 (one cement, four sand, eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication.
4
-
-
Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X 10cm and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed (SI 154-Aa) Footing & Grade Beam
60
-
-
Columns
46
-
-
Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of sand, but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - The Coarse and Fine aggregates to be used should comply with the requiremnents of IS staandards. (No separate payment will be made by the Department for the excess usage of materials) a) Up to Basement
11
-
-
Ground floor
2
-
-
Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors.
1050
-
-
Brick work in CM 1:5 (one cement & five sand) using II class ground moulded bricks of size 9"X43/8"X 2 3/4" including finishing, curing, etc., complete complying with standard specification ) Ground floor
21
-
-
Plastering with cement mortar 1:5 (One cement and five sand) ,12 mm ,thick in all floors including cost and conveyance of all materials to site etc,complete as per standard specifications
213
-
-
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
213
-
-
Supply and fixing of M.S Grills with with one coat of Red oxide with primer including all costs such as Welding ,grinding and fabrication charges, cost and conveyance of all materials to site etc,complete as per standared specification .TNBP- Spl
162
-
-
Painting two coats in all floors over the new iron work ready mixed Enamel paint of approved quality colour without priming coat including the cost all materials etc.,complete as per standared specification
5.4
-
-
Earthwork excavation and depositing on bank with an initial lead of 10 meters and initial lift of 2 meters in hard stiff clay, stiff black cotton, hard red earth,shales, murram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil SS 20 B etc and as directed by Engineer-In-Charge. First Depth 0 - 1.50m below GL
2
-
-
Supply and filling of M sand For foundation including leveing and consolidation in layers of 15 cm thick as per standard specification and as directed by the Engineers.
1
-
-
Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and Eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification
1
-
-
Supply and erection of steel centering, shuttering for soffits and sides including necessary supports and strutting for all RCC works using MS sheets of suitable size of BG 10 stiffened with MS angle of size 25 X 25 X 3mm for ring laid over Silver Oak joists of size 10cm X 6.5cm space at 10cm c/c and supported by Casurino Props 10cm - 13cm spaced at 75cm c/c etc., complete and as directed by Engineer
12
-
-
Providing and laying in position Standardised Concrete Mix M-30 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - a) Up to Ground Level
2
-
-
Ground Floor
2
-
-
Supplying, fabricating and placing in position RTS reinforcement and chairs including provision of cover blocks and wooden walk ways at intervals. The rate shall include cost of binding wire,labour for tieing, transportation, cutting, bending, cranking, welding etc., complete as per standard specifications and as per directed by Engineer in charge.
0.48
-
-
Brick work in CM 1:5 (one cement & Five Crushed Stone Sand (M- Sand)) using II class ground moulded bricks of size 9" X 43/8"X 2 3/4" including finishing, curing, etc., complete complying with standard specification - 100CFTa) Up To Ground Level
1
-
-
Ground Floor
8
-
-
Plastering with cement mortar 1:5 (One part of Cement and Five part of Plastering Sand (P- Sand)) 12mm, thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard
69
-
-
Special Ceiling Plastering for RCC slab and beams in CM 1:3 - 10 mm thick including hacking and curing etc complete.
9
-
-
White wasing one coat over new surface with approved quality of lime including cost of cleaning surface thoroughly scaffolding and taxes etc. all complete as per specification and direction of Engineer
78
-
-
Applying two coats of cement paint of approved colour and quality over cement plastered wall surfaces including cleaning, preparing the surface area and including cost of all materials, labour charges, curing etc., complete as per specification and direction of Engineer-In-Charge
78
-
-
Supply and fixing of M.S Grills with Doors and Windows with one coat of Red oxide with Primer including all costs such as welding,grinding and fabrication charges, cost and conveyance of all materials to site etc,complete as per standard specification.
80
-
-
Painting two coats with Ready Mixed Enamel Paint over the new iron works of approved quality and colour without priming coat including the cost all materials etc.,complete, in all floors.
8
-
-
Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum
1078
-
-
Supply and delivery of D.I Pipes, specials including cost and conveyance of materials and all labour charges etc., complete as per standard specification.a ) 150mm D.I Pipe K7
1078
-
-
100mm Double Orifice Kinetic Air Valve
1
-
-
150mm Mechnical collar Joints
2
-
-
150mm C.I sluice valve
2
-
-
150mm DI Bellmouth Flanged 20kg
80
-
-
150x150 mm D.I Tee 40 kg
40
-
-
150x100mm D.I Tee 31 kg
31
-
-
150mm D.I Bend 32 kg
224
-
-
Lowering of D.I Pipes and specials in the trenches and laying to proper grade andalignment and as directed by the Departmental Officers.a) 150mm D.I K7
1078
-
-
Jointing C.I/ D.I-S/S pipes and specials with rubber gaskets (tyton joint) including cost of
lubricants. (including cost of jointing materials ) 150mm D.I K7
212
-
-
Testing of pipes for water supply with hydraulic testing equipment by filling with water (including cost of water) and testing to recommended pressure in convenient stretches and attending the bursts if any occured during the test, excluding the cost of pipes but including other incidential and operational charges etc., complete for the following diametres of pipes. a) 150mm D.I K7
1078
-
-
Refilling with excavated soil for Pipe Line Work including Labour charges etc., Complete as per standard specification.
1078
-
-
Barricading work (Where, there is less traffic areas and broader roads etc.) for laying of pipe line using casurina poles at 1.50m center to center (8cm to 10cm dia and 1.80m height) vertical with horizontal poles in three rows including painting the vertical poles in the road facing sides with ready mix paint, tying the vertical and horizontal poles with coir rope including fixing charges and fixing 75mm dia reflectors including earth work excavation for fixing vertical posts and finally removing and stacking the materials safely for further use etc., complete and as directed by TWAD Board officers.
1078
-
-
Supply and delivery of Open well Submersible pump set conforming to IS 14220 /2002 and as amended thereafter and BEE 3 Star Rated capable of discharging the following duties due to all causes. The Pump efficiency should not be less than 50%. The pump shall be with stainless steel shaft and dynamically balanced bronze mixed type impeller, CI FG 200 grade casing and brass screws and rotor shall be of copper rod as per IS 613/1984 with ISI mark. The pump suitable for installation in sump with 1.1KV grade 3 core suitable copper flat submersible cable to a length of 15m with necessary cable joints. The non-return valve located at the top of the pump in the discharge outlet connection is to be designed with minimum friction. The pump should be directly coupled to 2880 RPM, three phase, 50 Hz (±5), 415V+6% & 415V-15% squirrel cage induction motor suitable for DOL upto 5 HP , Fully Automatic Air break Star Delta up to 20 HP and Auto Transformer starter for above 20 HP starting and for continuous operation. OPENWELL SUBMERSIBLE PUMPSET AS PER IS 14220 / 2002 WITHOUT PANEL BOARD
2
-
-
Labour charges for the erection of submersible pumpset in borewell/openwell including fixing and jointing submersible cable with proper clamps upto the starter to required depth and also fixing of riser pipes to the required depth valves erection clamps, pressure gauges upto the exterior wall of pump room and erection of panel board consisting of TPICN switches starter, Voltmeter, Ammeter, three pilot (indicating) lamps capacitor single phasing preventor, water level guard and laying and jointing the cables and twin earthing as per IE rules etc., complete and testing the pumpset and trail run for 10 days.
1
-
-
L.T Cables 3,3.5,4 Core 1.1 KV Grade Armoured Aluminium Conductor Cross linked poly Ethylene insulated PVC Sheated cables Confirming toIS 7098 (PART I)/1988
50
-
-
Construction of Valve Chamber of size 1.00 X 1.00X 1.55 in Brick work with CM 1:5 mix with RCC Slab 100 mm thick including cost and conveyance of all materials and labour charges to site etc., complete as per Standard specification
2
-
-
Excavating of driving pit and receiving pit of size 3.00m (length) x 3.50m (breadth), depth upto 5m in all soil including shoring and strutting using 6mm tk MS Plate of size 3.50m x 3.50m usable for 15 operations and providing 16mm thickness MS plate of size 3.00m x
3.50m with 100mm x100mm x 12mm angles of 4m length for holding the MS plates for Thrust arrangements to receive the impacts during pushing operation of encasing pipe. Lowering the following325 size of MS encasing pipe by using Contractor’s crane and machineries and jointing MS pipes by welding, across the National Highways/State Highways/ Railways/Canal crossing etc and driving
the horizontal bore by pushing / jacking method (trenchless technology method) using contractor’s machineries such as cranes, jacks, jacking materials, generator, welding machineries, compressor, jack hammer and other equipments etc. without interfering and causing any hindrance to the movement of traffic or
any other vehicles, without any disturbances to the railway/road/canal formation etc. including bailing / pumping of water where ever necessary without affecting any installation like water supply pipeline/telephone cable, electric cables etc. passing nearby area and scooping the earth inside the pipes and pit and depositing the surplus earth in a convenient place and leveling the
site after completion of entire work as directed by TWAD Engineers. The rate includes the cost of driving pit, thrust bed/wall and receiving pit to the depth of om to 5m excluding the cost of MS pipes.a) B.T. Roads (or) Maccadam road
20
-
-
D/F Loose Soil Qty
20
-
-
Labour for cutting open road for laying water mains or sewer.(Rate as per TWAD SOR 2024-2025)) B.T. Roads (or) Maccadam road
26.4
-
-
D/F Loose Soil Qty
26.4
-
-
Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cuma) 225mm HDPE -PN6
1300
-
-
110mm HDPE -PN6
600
-
-
Supply and delivery of HDPE Pipes, specials including cost and conveyance of materials and all labour charges etc., complete as per standard specification.A) 200mm DI K7
22
-
-
225mm HDPE -PN6
1300
-
-
110mm HDPE -PN6
600
-
-
200mm sluice valve
1
-
-
225mm HDPE- PN6 Bend
5
-
-
225mm HDPE- PN6 Tee
5
-
-
110mm HDPE- PN6 Bend
5
-
-
110mm HDPE- PN6 Tee
4
-
-
225-110 Reducer
4
-
-
End Cap for 225mm HDPE Pipe
5
-
-
a)Lowering of HDPE Pipes and specials in the trenches and laying to proper grade and alignment and as directed by the Departmental Officers. A) 225mm HDPE -PN6
1300
-
-
110mm HDPE -PN6
600
-
-
Jointing C.I/ D.I-S/S pipes and specials with rubber gaskets (tyton joint) including cost of
lubricants. (including cost of jointing materials A) 200mm DI K7
4
-
-
225mm HDPE -PN6
26
-
-
110mm HDPE -PN6
12
-
-
Testing of pipes for water supply with hydraulic testing equipment by filling with water (including cost of water) and testing to recommended pressure in convenient stretches and attending the bursts if any occured during the test, excluding the cost of pipes but including other incidential and operational charges etc., complete for the following diametres of pipes. a) 200mm DI K7
22
-
-
225mm HDPE -PN6
1300
-
-
110mm HDPE -PN6
600
-
-
Refilling with excavated soil for Pipe Line Work including Labour charges etc., Complete as per standard specification.a) 225mm HDPE -PN6
1300
-
-
110mm HDPE -PN6
600
-
-
Barricading work (Where, there is less traffic areas and broader roads etc.) for laying of pipe line using casurina poles at 1.50m center to center (8cm to 10cm dia and 1.80m height) vertical with horizontal poles in three rows including painting the vertical poles in the road facing sides with ready mix paint, tying the vertical and horizontal poles with coir rope including fixing charges and fixing 75mm dia reflectors including earth work excavation for fixing vertical posts and finally removing and stacking the materials safely for further use
760
-
-
Barricading work (Where the lines are in narrow width of municipality area, busy streets like Market, Bus-stand and in the Highways etc.) for laying of pipe line using casurina poles at 1.50m center to center (8cm to 10cm dia. and 1.80m height) vertical with horizontal poles in two rows, painting the vertical poles in the road facing sides with ready mix paint, tying the vertical and horizontal poles with coir rope including supplying, delivery and fixing of GI sheet (0.90m x 0.8mm thick) in the horizontal poles and fixing 75mm dia. reflectors including earth work excavation for fixing vertical posts and finally removing and stacking the materials safely for further use etc., complete and as directed by TWAD Board officers.
380
-
-
Construction of Valve Chamber of size 1.00 X 1.00 X 1.50 in Brick work with CM 1:5 mix with RCC Slab 100 mm thick including cost and conveyance of all materials and labour charges to site etc., complete as per Standard specification
1
-
-
Add GST 18%