Get tender documents at just ₹200 per tenderKnow More
Search made simple for latest tendersNo hidden charges. No keyword restrictionsExplore Our Plansor Pay Per Tender

Ministry Of Micro Small And Medium Enterprises

  • Opening Date

    21 Aug 2019

  • Closing Date

    23 Aug 2019

  • Tender Amount

    Refer document

  • EMD

    -

Are you Looking for Joint Venture Partners, Contractor Consortium, Project Financiers for this tender?
We will help YOU to find the right match for FREE!
Summary

Modular Work Stations

Are you looking for Materials and Services for this tender?
We will help YOU to find the right partner for your needs for FREE!
BOQ Items

No BOQs Available

RA Number: GEM/2019/RA/15609 Dated: 05-08-2019 RA Document RA Details RA Technical End Date/Time 12-08-2019 18:00:00 RA Life Cycle (From Publish Date) 90 (Days) RA Offer Validity (From End Date) 30 (Days) Ministry/State Name Ministry Of Coal Department Name Materials Management Organisation Name Nlc Office Name Materials Management Total Quantity 170 Item Category Modular Work Stations MSE Exemption For Years Of Experience And Turnover No Startup Exemption For Years Of Experience And Turnover No Modular Work Stations ( 170 pieces ) Technical Specifications * As per GeM Category Specification Specification Specification Name Values Bid Requirement (Allowed Values) SELLING UNIT Selling unit Order Quantity is number of Pieces / Clusters of specified number of seats. (Price given is for full cluster / module and not per seat) Order Quantity is number of Pieces / Clusters of specified number of seats. (Price given is for full cluster / module and not per seat) GENERIC Type of system Tile based system (shape fit tiles) Tile based system (shape fit tiles) Type / Shape of cluster Single Seater L Shape Cluster Single Seater L Shape Cluster Wire Management for electric switch Skirting race-way * Foot edge of table top Flat with PVC lipping * 1 / 4 Plain edge banded with 2mm PVC tape * Construction of drawer unit All wood pedestal All wood pedestal Construction of pedestal Free standing full height with castor Free standing full height with castor Type of pedestal two drawer and one filer * Locking system of pedestal Center locking * Work top support Gable end made of prelaminated particle board Gable end made of prelaminated particle board Type of Drawer unit Moveable with castor whees * MATERIAL Frame material for work station Powder Coated Extruded Aluminium Sections Powder Coated Extruded Aluminium Sections Material of table top Prelaminated particle board Prelaminated particle board Material of tiles for top fabric magnetic - fabric upholstered metal tile fabric magnetic - fabric upholstered metal tile Material of intermediate tiles fabric tackable - fabric upholstered metal tile with PE foam fabric tackable - fabric upholstered metal tile with PE foam Material of bottom tiles prelaminated particle board tile prelaminated particle board tile Overhead Storage Provided No Overhead Storage * DIMENSION Length of table top (main frame) ±10 mm(main frame) 1500 mm 1500 mm Length of table top (Return Frame)± 10mm 1500 mm 1500 mm Depth of table top ± 10mm 600 mm 600 mm Height of table top ±10mm 750 mm * Thickness of table top ±2mm 25 mm * Overall height of work station partition ±10mm 1350 mm 1350 mm Thickness of side partition/panel ±2mm 45 mm 45 mm 2 / 4 Thickness of main frame ±5 mm 45 mm 45 mm Size of drawer unit ( WidthXDepthXHeigh t) ±10mm 390 X 440 X 147 (mm) 390 X 440 X 147 (mm) Size of file box (Widt hXDepthXHeight) ±10mm 390 X 440 X 296 (mm) 390 X 440 X 296 (mm) FINISH Powder coating thickness of frame 40 micron * CERTIFICATION Test reports to be furnished to buyer on demand YES * BIFMA level-3 YES * OEM of offered product is ISO 9001:2015 certified YES * OEM of offered product is ISO 14001:2015 certified YES * OEM of offered product is ISO 18001:2007 certified YES * Green guard certification YES * WARRANTY Warranty period in number of years 1 1 INSTALATION COMMISSIONING INSTALLATION COMMISSIONING The price includes the cost of installation and commissioning of the entire unit at consignee site (excluding the cost of Civil Work which would be got done by the Consignee at his own cost as per design and layout plan provided by the seller). The price includes the cost of installation and commissioning of the entire unit at consignee site (excluding the cost of Civil Work which would be got done by the Consignee at his own cost as per design and layout plan provided by the seller). * Bold specifications are the golden parameters. * Bidders may note that

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.