Highways Department Tender
... More
Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.
Highways Department Tender
Civil And Construction
Road Construction
Eprocure
Opening Date20 Sep 2024
Closing Date7 Oct 2024
Tender Amount₹ 1,49,40,000
Costs
EMD
₹ 86,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Tn No 19 2024 25 Hdo Dt 11 09 2024 Tvm 75
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_HWAY_485263_1Bid Award Id
ViewTender No
TN No 19 2024 25 HDO Dt 11 09 2024 TVM 75Tender Authority
Highways Department ViewPurchaser Address
-Website
http://tntenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Road A
6775.4
716092
105.69
... More
Road B
6103.75
645105
105.69
... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper tosite, laying in uniform layers using pavers in SubBase/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5
-
-
-
... More
Road C
64.69
136922
2116.6
... More
Providing and laying Prime Coat over WBM / WMM surface using 7Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals formachinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5
-
-
-
... More
Road C
431.25
35064
81.31
... More
Providing and laying Tack Coat over WBM / WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5
-
-
-
... More
Road C
431.25
8064
18.7
... More
Providing and laying Tack Coat over Existing BT surface using 2Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5
-
-
-
... More
Road A
6775.4
182664
26.96
... More
Road B
6103.75
164557
26.96
... More
Road C
8338.75
224812
26.96
... More
Road D
4587.5
123679
26.96
... More
Providing and Laying 50mm thick Bituminous Macadam using course aggregate and VG30 bitumen which shall consist of construction in a single course base/binder course confirming to the specfication on a previously prepared base, (using Mini Hot Mix Plant and Power Roller) including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 504 MORTH Rev-5 (For Patch Works)
-
-
-
... More
Road C
39.97
316084
7908.04
... More
Road D
21.83
171842
7871.84
... More
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5
-
-
-
... More
Road C
21.56
179187
8311.1
... More
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
-
-
-
... More
Road A
271.02
2849282
10513.18
... More
Road B
244.15
2566792
10513.18
... More
Road C
263.1
2766017
10513.18
... More
Road D
137.62
1446823
10513.18
... More
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. Formation Embankment using Carted Earth including compaction by power roller with an average lead 5km.
-
-
-
... More
Road C
339
80675
237.98
... More
Road D
168
39980
237.98
... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically
-
-
-
... More
Basic cost of value put to tender as per estimate
1
-
12656789
... More
Add GST at 18%
1
-
2278222
... More
Total Value put to Tender
1
-
14935011
... More
Quoted value
1
-
-
... More
Final Quoted Value
1
-
-
... More
Add GST at 18% of Final Quoted Value
1
-
-
... More
Total Value of Contract Including 18% of GST
1
-
-
... More
Basic cost of value put to tender as per Estimate
-
12656789
-
... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements