Highways Department Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Highways Department Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date10 Sep 2024
Closing Date1 Oct 2024
Tender Amount₹ 5,15,00,000 
Notes
Download

Costs

Summary

Try 21 Lalgudi H C And M Sub Division

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of granular sub-base by providing close graded Material, (Table:- 400-1) mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 401 for grading-V Material

-

-

-

... More
Main work Km 0/0 - 2/4

797.73

1542051

1933.05

... More
Construction of granular sub-base by providing close graded Material, (Table:- 400-1) mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory soil compactor to achieve the desired density, complete as per clause 401 for grading-III Material

-

-

-

... More
Main work Km 0/0 - 2/4

371.04

750513

2022.73

... More
Picking the existing BT surface upto 50mm depth as directed by the departmental officers and levelling the surface including all labour charges for pickig and all other tools and plants employed of the work and including all other incidental charges etc., complete as per standard specifications.

-

-

-

... More
Main work Km 0/0 - 2/4

4592.78

100306

21.84

... More
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5

-

-

-

... More
Main work Km 0/0 - 2/4

4340.39

9712230

2237.64

... More
Providing and laying Prime Coat over WMM surface using Pressure Distributor at the rate of 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 502 of MORTH Rev-5

-

-

-

... More
Main work Km 0/0 - 2/4

17488.76

1428481

81.68

... More
Providing and laying Tack Coat over WMM surface (treated with primer) using Pressure Distributor at the rate of 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as

-

-

-

... More
Main work Km 0/0 - 2/4

17488.76

329488

18.84

... More
Providing and laying Tack Coat over Existing BT surface using Pressure Distributor at the rate of 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5

-

-

-

... More
Main work Km 0/0 - 2/4

35

947

27.07

... More
Providing, laying 75 mm consolidated thick Dense Bituminous Macadam using 0.40 cum of 37.50 - 13.20 mm, 0.35 cum of 13.20 - 2.36 mm and 0.36 cum of 2.36 mm & below size IRC metal with 71.30 kgs of VG30 grade bitumen for premixing per 10sqm of 75mm thick including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing the min the required temperature in central hotmix plant 20-30 ton capacity, conveying the mix by tipper trucks to site, spreading the mix to uniform thickness of 75mm with mechanical paver to the specified grades and cross sections and consolidated by Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 505 of MORTH rev-5 (Grade-I)

-

-

-

... More
Main work Km 0/0 - 2/4

1311.88

12161901

9270.59

... More
BC 30/40mm Thick (Grade-II) Using VG30 Bitumen Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm of 40mm thick including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5

-

-

-

... More
Main work Km 0/0 - 2/4

701.67

7598805

10829.6

... More
Refilling of berms on both sides of carriageway by using exess box soil earth available at site with consolidation by power roller compaction and in accordance with the specificatin and the lines and cross sections shown in the drawings or as indicated by the engineer as per MORTH to berms.

-

-

-

... More
Main work Km 0/0 - 2/4

919.65

24517

26.66

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with and average lead of 5 km and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller ,watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions back filling, clearing up the site and disposal of all surplus materials etc.,complete as per standard specification. For Carted Earth with compaction for making up of low berms with conveyance of 5 Kms

-

-

-

... More
Main work Km 0/0 - 2/4

686.41

163379

238.02

... More
WIDENING OF CULVERTS

-

-

-

... More
Dismantling Culverts, bridges and other structuresDismantling salvaging and removal and disposing of resulting materials and back filling the resulting trenches and pits etc.a)Dismantling Plain Cement Concrete MORTH 111 112 202

-

-

-

... More
Widening of Culvert at Km 0/4

0.54

262

486.2

... More
Widening of Culvert at Km 1/4

0.68

330

486.2

... More
Widening of Culvert at Km 2/2

0.44

213

486.2

... More
Earth work Excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming of bottom of excavtion backfilling, and clearing the site and disposal of all surplus materials etc. complete and in accordance with standard specification for Narrow foundation of Body wall , box culvert as per MORTH Vth Rev., 304.

-

-

-

... More
Widening of Culvert at Km 0/4

32.79

9488

289.37

... More
Widening of Culvert at Km 1/4

50.69

14668

289.37

... More
Widening of Culvert at Km 2/2

50.69

14668

289.37

... More
Vibrated Cement Concrete of grade M15 using 40mm ISS size HBG graded metal using with M-Sand including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labor charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for LEVELLING COURSE BELOW Box Culvert and Wing wall as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900.

-

-

-

... More
Widening of Culvert at Km 0/4

6.92

42822

6188.27

... More
Widening of Culvert at Km 1/4

2.76

17047

6176.57

... More
Widening of Culvert at Km 2/2

2.76

17022

6167.49

... More
Vibrated Reinforced Cement Concrete of grade M25 (Design mix) using 20mm ISShard broken granite metal using with M-Sand, including cost and conveyance of all materials to site and cost of cement excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying and curing concrete, working at heights, hire charges for tools and plants including all other incidental charges etc., complete as per relevant standard specifications as directed by the Engineer for BASE SLAB, STEM AND TOP SLAB OF Box culvert as per MORTH No. 111, 112, 900, 1000, 1500, 1600, 1700, 2100

-

-

-

... More
Widening of Culvert at Km 0/4

32.39

400746

12372.53

... More
Widening of Culvert at Km 1/4

10.87

126252

11614.77

... More
Widening of Culvert at Km 2/2

10.87

126153

11605.7

... More
Supply and fabrication of (HYSD) Steel Grade (as per steel schedule) required for all RCC items of works involved in the schedule of drawings including cost of steel, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, positioning and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete as per standard specification. - MORTH Vth Rev., 1000, 1500, 1600 & 900

-

-

-

... More
Widening of Culvert at Km 0/4

2.44

233286

95609.27

... More
Widening of Culvert at Km 1/4

0.9

86239

95609.27

... More
Widening of Culvert at Km 2/2

0.9

86239

95609.27

... More
Vibrated Cement Concrete M 20 mix(Nominal mix)using 40mm ISS size hard broken granite metal and using with M-Sand, including cost and conveyance of all materials from approved quarry to worksite including cost of cement including cost and labour charges for formwork and centering mixing the concrete, transporting, laying, vibrating, compacting, curing with all leads for soft potable water, working in all depths including hire, running and fuel charges for all tools and plants employed and in accordance with standard specification for Above Sill level, Parapet & Wing wall as per MORTH Vth Rev., 1000, 1500, 1700, 2100

-

-

-

... More
Widening of Culvert at Km 0/4

63.14

523891

8297.3

... More
Widening of Culvert at Km 1/4

13.8

121202

8782.77

... More
Widening of Culvert at Km 2/2

13.79

121014

8775.49

... More
Stone Dust Filling in between the box culvert and wing wall including cost and conveyance to site including labour charges for filling in layers, watering tamping under optimum moisture content to get the maximum density all incidental charges etc., complete. MORTH Vth Rev.

-

-

-

... More
Widening of Culvert at Km 0/4

7.37

2421

328.58

... More
Widening of Culvert at Km 1/4

1.28

412

322.61

... More
Widening of Culvert at Km 2/2

0.89

280

315.69

... More
CONSTRUCTION OF PROTECTIVE WALL

-

-

-

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour, materials, tools, equipments and all incidental charges and sheeting, shoring and bracing and their subsequent removal, removal of all logs, stumps and other deletrious matter and obstructions, trimming bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification -MORTH Vth Rev., 304 for Foundation of Protective wall

-

-

-

... More
Construction of Protective Wall at Km 0/4

82.13

23765

289.37

... More
Construction of Protective Wall at Km 1/4

328.5

95058

289.37

... More
Construction of Protective Wall at Km 1/10

273.75

79215

289.37

... More
Construction of Protective Wall at Km 2/2

87.6

25348

289.37

... More
Plain Cement Concrete of grade M15 (Nominal mix) using 40mm ISS hard broken granite metal and using M-Sand including cost of M-Sand and conveyance of all materials to site, including cost and labour charges for form work and centering, labour charges for compacting, curing and all incidental charges etc., complete as per standard specification for LEVELLING COURSE BELOW FOUNDATION.

-

-

-

... More
Construction of Protective Wall at Km 0/4

8.21

50805

6188.27

... More
Construction of Protective Wall at Km 1/4

32.85

202900

6176.57

... More
Construction of Protective Wall at Km 1/10

27.38

168865

6167.49

... More
Construction of Protective Wall at Km 2/2

8.76

54027

6167.49

... More
Vibrated Cement Concrete of grade M20 using 40mm ISS size HBG graded metal using with M-Sand including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labor charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900. complete For Protective wall for Below sill

-

-

-

... More
Construction of Protective Wall at Km 0/4

53.33

387129

7259.13

... More
Construction of Protective Wall at Km 1/4

213.3

1526803

7158.01

... More
Construction of Protective Wall at Km 1/10

177.76

1271908

7155.2

... More
Construction of Protective Wall at Km 2/2

56.88

411311

7231.21

... More
Vibrated Cement Concrete of grade M20 using 40mm ISS size HBG graded metal and using with M-Sand including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labor charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900. complete For Protective Wall (Above Sill)

-

-

-

... More
Construction of Protective Wall at Km 0/4

38.25

346784

9066.26

... More
Construction of Protective Wall at Km 1/4

153

1318679

8618.82

... More
Construction of Protective Wall at Km 1/10

127.51

1101895

8641.64

... More
Construction of Protective Wall at Km 2/2

40.8

367321

9002.98

... More
Refilling of berms on both sides of carriageway by using exess box soil earth available at site with consolidation by power roller compaction and in accordance with the specificatin and the lines and cross sections shown in the drawings or as indicated by the engineer as per MORTH to berms.

-

-

-

... More
Construction of Protective Wall at Km 0/4

54.75

1459

26.66

... More
Construction of Protective Wall at Km 1/4

219

5838

26.66

... More
Construction of Protective Wall at Km 1/10

182.5

4865

26.66

... More
Construction of Protective Wall at Km 2/2

58.4

1556

26.66

... More
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all lead sand lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller ,watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc.,complete as per standard specification. For Carted Earth with compaction for Filling With Conveyance of 5 Kms Lead

-

-

-

... More
Construction of Protective Wall at Km 0/4

48.75

11603

238.02

... More
Construction of Protective Wall at Km 1/4

195

46413

238.02

... More
Construction of Protective Wall at Km 1/10

162.5

38678

238.02

... More
Construction of Protective Wall at Km 2/2

52

12377

238.02

... More
Providing and fixing 100mm dia PVC SEEPAGE PIPES of required length for abutment and wing, retaining wall / protective wall including cost and conveyance of all materials to worksite, cost and labour for semi-spherical backfill arrangements with 100mm size broken granite stones at the periphery and labour charges for fixing etc., complete to drain the backfill as per standard specification. -MORTH Vth Rev., 2700, 2706, 2707 & 900

-

-

-

... More
Construction of Protective Wall at Km 0/4

12

2310

192.5

... More
Construction of Protective Wall at Km 1/4

70.8

13629

192.5

... More
Construction of Protective Wall at Km 1/10

58.8

11319

192.5

... More
Construction of Protective Wall at Km 2/2

19.2

3696

192.5

... More
Vibrated Cement Concrete of grade M20 using 40mm ISS size HBG graded metal and using with M-Sand including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labor charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications, as per MORTH Vth Rev., 1000, 1500, 1700, 2100 & 900 for Parapet.

-

-

-

... More
Construction of Protective Wall at Km 0/4

1.08

12788

11841.01

... More
Construction of Protective Wall at Km 1/4

3.78

44714

11829.31

... More
Construction of Protective Wall at Km 1/10

3.78

44680

11820.24

... More
Construction of Protective Wall at Km 2/2

1.08

12765

11820.24

... More
Providing and fixing PVC EXPANSION JOINT 20mm thick confiriming to specification in protective/Retaining wall and dirt wall including cost and conveyance of expansion joints to site including cost of testing as per MORT&H specification, including charges for fixing in all respect etc., Complete.

-

-

-

... More
Construction Of Protective Wall at Km 1/4

5.5

3593

653.4

... More
Construction Of Protective Wall at Km 1/10

5.5

3593

653.4

... More
Calculation of SubTotal, GST and Total Amount carried out by system automatically

-

-

-

... More
Basic cost of value put to tender as per estimate

1

-

43635028

... More
Add GST at 18%

1

-

7854305

... More
Total Value put to Tender

1

-

51489333

... More
Negotiated Percentage

1

-

-

... More
Final Negotiated Value

1

-

-

... More
Add GST at 18% of Final Negotiated Value

1

-

-

... More
Total Value of Contract Including 18% of GST

1

-

-

... More
Basic cost of value put to tender as per Estimate

-

43635028

-

... More
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.