Chennai Metropolitan Water Supply And Sewerage Board Tender

Search from a plethora of business opportunities for Tamil Nadu tenders posted on the eProcurement TamilNadu website and other online and offline sources. Here, on BidAssist, you can find the best tender opportunities to boost your enterprise by finding work in Tamil Nadu government tenders, PSUs, Municipal Corporations and more. Read on to learn about the bidder registration process, DSC and more.

Chennai Metropolitan Water Supply And Sewerage Board - CMWSSB Tender

Civil And Construction
Drainage Work
Eprocure
Opening Date20 Jun 2023
Closing DateCancelled
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply,Laying, jointing SW pipes with cement joint, testing including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. and carting of pipes from any of the Board’s stores to the site of work, lowering into trenches and aligning, refilling the trenches with excavated soil, watering and ramming to consolidation,disposal of surplus earth etc., complete including the cost of cement and sand. (Timbering included for Depths 2.50m,3.0m,3.5m,..........upto 5.5m

-

-

-

... More
250mm dia pipe

-

-

-

... More
at1.50m depth

220

-

-

... More
at 2.00m depth

180

-

-

... More
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for plain cement concrete works including laying in layers of not more than 15cm thick including ramming curing,etc., complete

-

-

-

... More
End concrete

-

-

-

... More
For 250mm dia pipe

5.1

-

-

... More
Construction of machinehole using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M.1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly for fixing the frame, providing C.I. steps, machinehole cover and frame, benching and channelling etc., complete for the following sizes for each machinehole (As per the type design drawing for machinehole).

-

-

-

... More
at 1.50m depth

4

-

-

... More
at 2.00m depth

3

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites

800

-

-

... More
Dewatering using 10HP to 70HP diesel engine pumpset including Hire charges, cost of Diesel, Engine oil, pump operator, labour charges, conveyance of pumpset and fuel to site and back, loading, unloading and any other incidental charges etc., complete.

960

-

-

... More
Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete

100

-

-

... More
Supplying and laying of MDPE (PE80) Blue pipe (IS:4427) with necessary specials including earth work excavation laying jointing testing, refilling the trenches and disposal of surplus earth etc.complete.

50

-

-

... More
Hire charges for 2 nos. of Halogen fitting with allied fittings and accessories with electriation for monitoring with 12 hours per day for lighting purpose.

4

-

-

... More
SWD Crossing

2

-

-

... More
Providing dummies in upstream & Down stream 2 Nos. Each manholes including labour and materials

8

-

-

... More
Removing dummies in upstream & Down stream 2 Nos. Each manholes including labour and materials

8

-

-

... More
Providing interconnection to the existing machine hole

1

-

-

... More
Providing and laying, spreading and compacting graded stone aggregrats to Wet mix M20 grade (100mm thick) specification including pre mixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in Sub Base/Base corse on well prepared and compacting with vibratory roller to achive the desired density including cost of material, labour charges, rentals for machineary fuel and other incidential charges etc., complete as per clause of 406 of MORTH Rev 5

36

-

-

... More
Disposal of surplus earth

55.63

-

-

... More
Enlargement of gravity sewer main at Various street in Depot-62, Chepauk Constituency in Area V

-

-

-

... More
Hire charges for cutting Asphaltic concrete/ Cement Concrete road using Air compressor

-

-

-

... More
NBRR

1820

-

-

... More
BRR

260

-

-

... More
Making trail pit - 3 Nos

-

-

-

... More
Hire charges for Air Compressor for cutting ashpaltic / concrete road including the cost of fuel charges, etc., complete

15

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites

12

-

-

... More
Earthwork excavation and depositing on bank with initial lead of 10 metres and initial lift 2.00m in hard stiff clay stiff black cotton, hard red earth, shales, Muram, gravel, stoney earth and earth mixed with small size boulders S.S. 20-B.(excluding timbering and bailing out sub-soil water) as per P.W.D. standard schedule of rates for Chennai City. For 0m - 2m

11.82

-

-

... More
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.

9.78

-

-

... More
Cement concrete 1:2:4 using 20mm gauge hard broken stone jelly for plain cement concrete works including laying in layers of not more than 15cm thick including ramming curing, etc. complete.

2.04

-

-

... More
Disposal of Surplus Earth.

2.04

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated / structured wall plastic polyethylene/ polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight, insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation including timbering the trenches for depths 2.5m and above, pumping out subsoil water etc., complete.

-

-

-

... More
250mm dia pipe

-

-

-

... More
at1.50m depth

325

-

-

... More
at1.50m depth (BRR- NIGHT WORK)

75

-

-

... More
at 2.00m depth

380

-

-

... More
at 2.50m depth

160

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated / structured wall plastic polyethylene/ polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight, insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation including timbering the trenches for depths 2.5m and above, pumping out subsoil water etc., complete.

-

-

-

... More
300 mm dia DWC pipe @2.00m depth

170

-

-

... More
400 mm dia DWC pipe @2.50 m depth

105

-

-

... More
400 mm dia DWC pipe @3.00m depth

200

-

-

... More
500 mm dia DWC pipe @3.50m depth

180

-

-

... More
500 mm dia DWC pipe @3.50m depth (BRR-Night work)

110

-

-

... More
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for plain cement concrete works including laying in layers of not more than 15cm thick including ramming curing,etc., complete

-

-

-

... More
NBR

19.55

-

-

... More
BRR Night work

7.92

-

-

... More
Cutting of DWC pipe

-

-

-

... More
250mm dia pipe

35

-

-

... More
300mm dia pipe

6

-

-

... More
400mm dia pipe

11

-

-

... More
500mm dia pipe

6

-

-

... More
500mm dia pipe (Night work)

4

-

-

... More
Construction of Precast circular RCC machinehole using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC machinehole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast machinehole at the required position as directed by the engineer at site including testing the machinehole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths. (1.20m dia depth)

-

-

-

... More
at 1.50m depth

10

-

-

... More
at 1.50m depth (BRR)

3

-

-

... More
at 2.00m depth

17

-

-

... More
at 2.50m depth

9

-

-

... More
Construction of RCC machinehole using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC machinehole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the machinehole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of machineholes (1.2m dia)

-

-

-

... More
at 3.00m depth

6

-

-

... More
at 3.5 m depth

8

-

-

... More
at 3.5 m depth (BRR)

4

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites

3410

-

-

... More
Dewatering using 10HP to 70HP diesel engine pumpset including Hire charges, cost of Diesel, Engine oil, pump operator, labour charges, conveyance of pumpset and fuel to site and back, loading, unloading and any other incidental charges etc., complete. (10HP)

5760

-

-

... More
Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete - 110mm dia @ 1.0m depth

-

-

-

... More
NBRR

540

-

-

... More
BRR

150

-

-

... More
Supplying and laying of MDPE (PE80) Blue pipe (IS:4427) with necessary specials including earth work excavation laying jointing testing, refilling the trenches and disposal of surplus earth etc.complete. (20mm dia OD)

145

-

-

... More
Hire charges for portable Genset 1.00 KVA with 2 Nos. of 150W flood light including all incidental charges, transportation, crew charges and fuel charges etc., complete.

15

-

-

... More
SWD Crossing - 2 Nos

-

-

-

... More
Hire charges of Power driller for breaking SWD wall

32

-

-

... More
Earth work excavation and depositing on bank with initial lead of 10 metres and initial lift 2.00 min hard stiff clay stiff black cotton, hard red earth, shales, Muram, gravel, stoney earth and earth mixed with small size boulders S.S.20-including timbering and bailing out sub-soil water) as per P.W.D. standard schedule of rates for Chennai City.

8

-

-

... More
Cement concrete 1:2:4 using Crushed stone sand (Msand) and 20mm gauge hard broken stone jelly for plain concrete works including laying ramming curing, etc., complete.

0.2

-

-

... More
Providing dummies in upstream & Down stream 2 Nos. Each manholes including labour and materials - 26 Nos

-

-

-

... More
Engaging labours for providing dummie on the existing manhole of 2.0-6.0 mtr deep

-

-

-

... More
Head Mazdoor (well sinking) - For Supervising

26

-

-

... More
Well Sinker (I Class) - For guiding Helmet

26

-

-

... More
Well Sinking Diver working with Helmet(above2.0 m of water) - For Sinking Operations

26

-

-

... More
Well Sinker (II Class) - For guiding Safety Belt

26

-

-

... More
Mazdoor Category II - For lifting/supplying materials

26

-

-

... More
Providing accidential Insurance for labourers

130

-

-

... More
Hiring and operation of 20KVA DG set during night hours ( for 4 hrs of effective operation)

26

-

-

... More
Hiring Low Pressure Air Compressor unit (50 lts) and safety equipements such as Gas mask, Helmet, Coir ropes, Comboot shoe, Apron, Hand golves etc., For minimum 8 hours of work with Rs. 350 /- per hour.

26

-

-

... More
Hiring Multi gas detection meter & Operator charges

26

-

-

... More
For Providing on the upstream / downstream side

-

-

-

... More
Gunny Bag with Flower Pot / sand bags, Tyeing & Guiding Ropes, Portland Cement & Clay etc.,

26

-

-

... More
Rapid setting cement based - water leak plugging Mortar (Fosroc Renderoc Plug 5 Kgs)

26

-

-

... More
Removing dummies in upstream & Down stream 2 Nos. Each manholes including labour and materials - 26 Nos

-

-

-

... More
Engaging labours for removing dummie on the existing manhole of 2.5-6.0 mtr deep

-

-

-

... More
Head Mazdoor (well sinking) - For Supervising

26

-

-

... More
Well Sinker (I Class) - For guiding Helmet

26

-

-

... More
Well Sinking Diver working with Helmet(above2.0 m of water) - For Sinking Operations

26

-

-

... More
Well Sinker (II Class) - For guiding Safety Belt

26

-

-

... More
Mazdoor Category II - For lifting/supplying materials

26

-

-

... More
Providing accidential Insurance for labourers

130

-

-

... More
Hiring and operation of 20KVA DG set during night hours ( for 4 hrs of effective operation)

26

-

-

... More
Hiring Low Pressure Air Compressor unit (50 lts) and safety equipements such as Gas mask, Helmet, Coir ropes, Comboot shoe, Apron, Hand golves etc., For minimum 8 hours of work with Rs. 350 /- per hour.

26

-

-

... More
Hiring Multi gas detection meter & Operator charges

26

-

-

... More
For Removing Dummy on the upstream / downstream side.

-

-

-

... More
Hire charges for diesel pumpset for 3 hp with fuel and crew charges including transportation. - For dewatering from the Manhole.

104

-

-

... More
Providing interconnection to the existing machine hole - 1 No

-

-

-

... More
Hire charges for power breaker to dismantle the concrete / asphaltic road surfaces.

4

-

-

... More
Labour charges for cutting and removing the existing pipe lines and for lowering the new pipes and specials, excavating the earth below pipeline & additional manpower provided as a precautionary measure to handle any emergency, sweeping and brushing the road etc., complete

-

-

-

... More
Fitter Class I

1

-

-

... More
Mazdoor Category I

1

-

-

... More
Mazdoor Category II

2

-

-

... More
Dismantling Brick or stone masonry in cement mortar walls under 3.00m high

0.04

-

-

... More
Hire charges for portable Genset 1.00 KVA with 2 Nos. of 150W flood light including all incidental charges, transportation, crew charges and fuel charges etc.,complete.

1

-

-

... More
Hire charges for diesel pumpset 10HP with fuel and crew charges including transportation

8

-

-

... More
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe for DWC PE pipes including ramming, consolidation etc., complete

625.04

-

-

... More
Construction of precast anchor block for 500 mm dia DWC pipes

53

-

-

... More
Providing and laying, spreading and compacting graded stone aggregrats to Wet mix macadam 250mm thick specification including pre mixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in Sub Base/Base corse on well prepared and compacting with vibratory roller to achive the desired density including cost of material, labour charges, rentals for machineary fuel and other incidential charges etc., complete as per clause of 406 of MORTH Rev 5 ( this rate is applicable only if work is done during night

101.63

-

-

... More
Disposal of surplus earth

-

-

-

... More
NBRR

756.39

-

-

... More
BRR

187.89

-

-

... More
Refilling with excavated earth (other than sand)

3211.46

-

-

... More
The Contractor must obtain the existing Static GCP points from CMWSSB which should be considered as the control point with known coordinates X, Y and Z. Survey consultant to ensure the closing error is within permissible limits (SoI Standards)while transferring the levels from the existing Static GCP points and the same to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base.

-

-

-

... More
As built survey for every sewage and water pipeline and other assets must be done using DGPS based RTK method by transferring the coordinates from the nearest Static GCP of CMWSSB. Where there are signal interruptions for the RTK method, Total Station can be used. The coordinates from the static GCP shall be transferred to the Total Station by RTK method and the co- ordinates of the assets can then be captured by Total Station.

-

-

-

... More
All the features, attributes of all the assets, utilities captured shall be Geo referenced as per standard Coordinate reference system (WGS 84 UTM Zone 44N). The final base map with assets and utilities shall be furnished in (.shp) format. The geo Referenced assets and utilities along with the attributes (as specified by the GIS Wing, CMWSSB) shall be converted into proper geo database (FGDB / PGDB) with the attributes.One set Hard and Soft Copy of all the CMWSSB assets and utility has to be prepared category wise network wise in A0 Print for verification in a print scale of 1:1000 in A0 plot,with standard legends in international and NUIS standards and should be legible and three sets of final Hard Copy in A0 print.

-

-

-

... More
(b) For the Point Underground / Surface Assets along the roads

35

-

-

... More
Enlargement of sewer main and insertion of machine hole at Karpagakanni amman koil 1 to 5 streets and Palaniamman koil 1 to 6 streets in Depot-116 / Area-IX

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 1.5m deep

478

-

-

... More
at 2.0m deep

455

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation including timbering the trenches for depths 2.5m and above, pumping out subsoil water etc., complete.

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 2.5m deep

385

-

-

... More
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for plain cement concrete works including laying in layers of not more than 15cm thick including ramming curing, etc., complete

26.18

-

-

... More
Construction of machine holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, machine hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each machine hole

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
at 1.0m deep

1

-

-

... More
at 1.5m deep

2

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites

2636

-

-

... More
Cutting DWC PE Pipes

-

-

-

... More
250mm dia

44

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete

-

-

-

... More
110mm dia upto a depth of 1.0m

804

-

-

... More
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe for DWC PE pipes including ramming, consolidation etc., complete

499.19

-

-

... More
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length)

1639.45

-

-

... More
Disposal of surplus earth (for DWC PE or PP pipe length)

565.76

-

-

... More
Cement concrete 1:2:4 using 20mm gauge hard broken stone jelly for plain concrete works including laying ramming curing etc., complete (for restoration)

138.39

-

-

... More
Providing and removing dummies

40

-

-

... More
Cutting asphaltic surface using air compressor machine

989

-

-

... More
Hire charges for diesel pump for 7.5HP for dewatering the sewage from upstream side manhole to downstream side manhole

960

-

-

... More
The Contractor must obtain the existing Static GCP points from CMWSSB which should be considered as the control point with known coordinates X, Y and Z. Survey consultant to ensure the closing error is within permissible limits (SoI Standards) while transferring the levels from the existing Static GCP points and the same to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base. As built survey for every sewage and water pipeline and other assets must be done using DGPS based RTK method by transferring the coordinates from the nearest Static GCP of CMWSSB.

-

-

-

... More
Where there are signal interruptions for the RTK method, Total Station can be used. The coordinates from the static GCP shall be transferred to the Total Station by RTK method and the co- ordinates of the assets can then be captured by Total Station. All the features, attributes of all the assets, utilities captured shall be Geo referenced as per standard Coordinate reference system (WGS 84 UTM Zone 44N). The final base map with assets and utilities shall be furnished in (.shp) format. The geo referenced assets and utilities along with the attributes (as specified by the GIS Wing, CMWSSB) shall be converted into proper geo database (FGDB / PGDB) with the attributes. One set Hard and Soft Copy of all the CMWSSB assets and utility has to be prepared category wise network wise in A0 Print for verification in a print scale of 1:1000 in A0 plot, with standard legends in international and NUIS standards and should be legible and three sets of final Hard Copy in A0 print.

-

-

-

... More
For the Underground / Surface Assets along the roads for the distance 2km

1.32

-

-

... More
Rectification of defunct sewer main and insertion of machine hole at various locations in Depot-115, Area-IX

-

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 1.5m deep

272

-

-

... More
at 2.0m deep

345

-

-

... More
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation including timbering the trenches for depths 2.5m and above, pumping out subsoil water etc., complete.

-

-

-

... More
295/250mm OD/ID DWC PE or PP Pipe

-

-

-

... More
at 2.5m deep

20

-

-

... More
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for plain cement concrete works including laying in layers of not more than 15cm thick including ramming curing, etc., complete

17.34

-

-

... More
Construction of machine holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, machine hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each machine hole

-

-

-

... More
1.05mx 0.9m

-

-

-

... More
at 1.5m deep

4

-

-

... More
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites

1273

-

-

... More
Cutting DWC PE Pipes

-

-

-

... More
250mm dia

21

-

-

... More
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete

-

-

-

... More
110mm dia upto a depth of 1.0m

528

-

-

... More
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe for DWC PE pipes including ramming, consolidation etc., complete

213.94

-

-

... More
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length)

616.96

-

-

... More
Disposal of surplus earth (for DWC PE or PP pipe length)

246.09

-

-

... More
Cement concrete 1:2:4 using 20mm gauge hard broken stone jelly for plain concrete works including laying ramming curing etc., complete (for restoration)

111.39

-

-

... More
Providing and removing dummies

26

-

-

... More
Cutting asphaltic surface using air compressor machine

637

-

-

... More
Hire charges for diesel pump for 7.5HP for dewatering the sewage from upstream side manhole to downstream side manhole

800

-

-

... More
The Contractor must obtain the existing Static GCP points from CMWSSB which should be considered as the control point with known coordinates X, Y and Z. Survey consultant to ensure the closing error is within permissible limits (SoI Standards) while transferring the levels from the existing Static GCP points and the same to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base. As built survey for every sewage and water pipeline and other assets must be done using DGPS based RTK method by transferring the coordinates from the nearest Static GCP of CMWSSB.

-

-

-

... More
Where there are signal interruptions for the RTK method, Total Station can be used. The coordinates from the static GCP shall be transferred to the Total Station by RTK method and the co- ordinates of the assets can then be captured by Total Station. All the features, attributes of all the assets, utilities captured shall be Geo referenced as per standard Coordinate reference system (WGS 84 UTM Zone 44N). The final base map with assets and utilities shall be furnished in (.shp) format. The geo referenced assets and utilities along with the attributes (as specified by the GIS Wing, CMWSSB) shall be converted into proper geo database (FGDB / PGDB) with the attributes. One set Hard and Soft Copy of all the CMWSSB assets and utility has to be prepared category wise network wise in A0 Print for verification in a print scale of 1:1000 in A0 plot, with standard legends in international and NUIS standards and should be legible and three sets of final Hard Copy in A0 print.

0.64

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.