If you're looking for Rajasthan tenders online and are tired of typing tender ID over and again or going through the cumbersome government websites for it, you are in luck. We have collated every Eproc Rajasthan tender on BidAssist. And for any queries related to an e-tender Rajasthan, like bidding process, registration process, etc., are explained below. Read on.
Costs
EMD
₹ 7,97,251Document Cost
₹ 2,000Tender Fee
₹ 1,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_WRDAS_290790_1Bid Award Id
ViewTender No
NIT SE WRD UDR 02/2022-23/2Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://http://water.rajasthan.gov.in/wrd
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement. Columns, slabs, cantilevers projections staircases, lintels, beams, chajjas, Retaining walls, piers, abutments, galleries, arch covers, bed plates, sluice capstan bases etc.
2046.72
-
200
... More
Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. Tor or ribbed bars (IS :1786-1985)
80660
-
95
... More
Side shuttering including propping etc. complete (to achieve finish F 2 for :Retaining wall, counterfort, abutment, wing walls up stream or down- stream slope facings of dams and open faces of construction joints etc.
19943
-
220
... More
Side shuttering including propping etc. complete (to achieve finish F 2 for :Block joints of foundation stilling basins buckets, aprons etc. (non -suspended horizontally laid mass concrete)
632.84
-
160
... More
Providing and Laying in position of Cement concrete Nominal mix (1:1.5:3) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto; 20 mm
27.08
-
5907
... More
Providing and Laying in position of Cement concrete Design mix M-15 including leads of all construction materials, plasticizers (if required), curing, compaction and finishing with rendering in cement sand mortar 1:3 ( 1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto;
(For mix design Cement content considered 320 kg/ cum of concrete) 20 mm
3091.87
-
5467
... More
Plaster in cement sand mortar 1:4 including racking of joints, smooth finishing and curing etc. complete including all leads of all construction materials of thickness: 20 mm
4560
-
284
... More
Coursed stone masonry (using C.R. stone for face work duly hammer dressed on beds and all sides, the bed joints and faces chisel dressed for at least 8 cm back from face and at least 4 cm from sides, height not less than 25 cm and weighing not less than 50 kg, 50 % stones to have depth more than 45 cm and tail area not less than half the face area) for foundation (up to 0.5 m thickness) including all leads of all construction materials including curing etc. complete. Add extra over item no. 1 to 7 for Masonry work in superstructure
648.75
-
190
... More
Random rubble stone masonry (using R. R. stones where 75 % stones to be not less than 15 cm in size in any direction and weighing not less than 23 kg.) for foundation including curing with all leads of all construction materials including curing etc. complete. In cement sand mortar 1:6
648.75
-
3777
... More
Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20 mm
634.89
-
4802
... More
(ii)Removal of slit/soil/earth, sand, pebbles, Malba , debris, rubbish, stone pebbles and obstruction deposited in canal bed up to design line grade and sections having design due to erosion/scour/slips in canal banks/silting with or without bushes and weeds etc. in dry or moist condition from canal bed including dewatering, loading unloading and disposal at suitable place as directed by Engineer in charge with initial lead of 50m. and lift upto 1.5 m with proper dressing on canal bed complete in all respect For depth above 15 cms but upto 30cms having Lined section
3030
-
28
... More
Preparation and dressing the sub grade including removal of irregularities up to 7.5 cm in soil, morrum mixed with pebbles, small boulders and kankar and murrum for Bed
5886
-
8.5
... More
Add extra over item No. 1 to 8 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and un- loading wherever required
40656.33
-
8.5
... More
Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect. Soft / Disintegrated rock
2211.88
-
155
... More
Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect.Hard rock not requiring blasting
2065.41
-
229
... More
Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect.Phylite and other hard rock requiring nominal blasting
2016.58
-
321
... More
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Hard / dense soil
4284.67
-
93
... More
Cutting and clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. Thick
44490
-
2.5
... More
Centering and shuttering for slabs, beams, lintels Columns, trough with or without caps and base including propping and remove
761.1
-
225
... More
Dismantling old plaster or skirting, racking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 m lead, inclusive of de-watering wherever required.
17.10 Deduct for poor quality or weathered, weakened work.
3420
-