Get tender documents at just ₹200 per tenderKnow More
Search made simple for latest tendersNo hidden charges. No keyword restrictionsExplore Our Plansor Pay Per Tender

North Western Railway

  • Opening Date

    06 Oct 2019

  • Closing Date

    30 Oct 2019

  • Tender Amount

    ₹ 1,52,40,446

  • EMD

    ₹ 2,26,200

Are you Looking for Joint Venture Partners, Contractor Consortium, Project Financiers for this tender?
We will help YOU to find the right match for FREE!
Summary

Den/east/jp Section - Providing Boundary Wall At Various Locations Near Stations And Its Approaches To safeguard Track And Avoid Encroachment.

Are you looking for Materials and Services for this tender?
We will help YOU to find the right partner for your needs for FREE!
BOQ Items

No BOQs Available

DRM WA Jaipur acting for and on behalf of The President of India invites E-Tenders against Tender No ENGG-JP-2019-20-165 Closing Date/Time 30/10/2019 15:30 Hrs. Bidders will be able to submit their original/revised bids upto closing date and time only. Manual offers are not allowed against this tender, and any such manual offer received shall be ignored. Contractors are allowed to make payments against this tender towards tender document cost and earnest money only through only payment modes available on IREPS portal like net banking, debit card, credit card etc. Manual payments through Demand draft, Banker cheque, Deposit receipts, FDR etc. are not allowed. 1. NIT HEADER Name of Work DEN/East/JP Section - Providing boundary wall at various locations near stations and its approaches to safeguard track and avoid encroachment. Bidding type Normal Tender Tender Type Open Bidding System Single Packet System Tender Closing Date Time 30/10/2019 15:30 Date Time Of Uploading Tender 06/10/2019 17:56 Pre-Bid Required No Pre-Bid Query Date Time Not Applicable Advertised Value 15240446.88 Tendering Section DRM WA Bidding Style Single Rate for Each Schedule Bidding Unit Earnest Money (Rs.) 226200.00 Validity of Offer ( Days) 45 Tender Doc. Cost (Rs.) 5000.00 Period of Completion 6 Months Contract Type Works Contract Category Expenditure Bidding Start Date 16/10/2019 Are Joint Venture (JV) firms allowed to bid No Ranking Order For Bids Lowest to Highest Expenditure Type Capital (Works) 2. SCHEDULE S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit Schedule 1-Sch. A USSOR items 2010 15240446.88 Above/ Below/Par 1 Please see Item Breakup for details. 11882462.87 28.26 15240446.88 Item Description:- Sch. A USSOR items 2010 3. ITEM BREAKUP Schedule Schedule 1-Sch. A USSOR items 2010 Item- 1 Sch. A USSOR items 2010 S No. Item No Description of Item Unit Qty Rate Amount Earth work in excavation as per approved drawings and dumping at embankment site or spoil heap, within railway land, including 50m lead and 1.5m lift, the lead to be measured from the centre of gravity of excavation to centre of gravity of spoil heap: the lift to be measured from natural ground level and paid for in layers of 1.5m each, including incidental work, as per specifications-in 1 011011 All kinds of soils cum 1488.00 95.85 142624.80 2 012010 Extra over item 011010 for excavation in foundations for buildings and bridges to cover dressing to neat dimension and plumbing sides etc. Note : Dressing under this item is payable for the total quantity of excavation in foundation and not partly cum 1488.00 10.10 15028.80 3 012040 Filling, watering and ramming earth in 15 cm layers in floors and foundations with surplus earth from foundations including 50m lead and 1.5m lift cum 1116.00 21.90 24440.40 Providing and laying in position cement concrete of specified proportion excluding cost of cement, centering and shuttering - All works upto Plinth level : 4 031013 1:4:8 (1 cement : 4 sand : 8 graded stone aggregate 40mm nominal size) cum 148.80 1315.13 195691.34 Supply and using cement at worksite : 5 033063 PPC Tonne 446.40 4830.00 2156112.00 Providing and laying in position M 20 Grade concrete for reinforced concrete structural elements but excluding cost of centering, shuttering, reinforcement and Admixtures in recommended proportion (as per IS:9103) to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge 6 041011 All work upto plinth level, including raft foundation of washable aprons, HS tank, pile cap, footings of FOB, and Platform shelter etc. cum 837.00 1836.48 1537133.76 7 041012 All work in buildings above plinth level upto floor two level. cum 279.00 2047.43 571232.97 Centering and shuttering including strutting, propping etc. and removal of form for : 8 042011 Foundations, footings, bases of columns, raft foundation of washable aprons, Pile caps, Foot

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.