Water Resources Department Tender
If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.
Costs
EMD
₹ 46,000Document Cost
₹ 2,000Tender Fee
₹ 2,714
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_WR_127881_9Tender No
PWRMDC/NIT 11 of 2024/DT.20.09.2024Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://eproc.punjab.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
First class brick masonary 229 mm thick laid in cement sand mortar 1.6 in foundation and plinth including supply recarriage of bricks cement .
1
-
-
10mm thick cement plaster 1.4 on sides walls (-) Rs.1.25/- for scaffolding.
1
-
-
10mm thick cement plaster 1:4 on bed and top.
1
-
-
Reinforced cement concrete 1:2:4 hand mixed but including steel reinforcement
1
-
-
Cement Conc.1:2:4 including supply, carriage & with stone ballast or shingle
1
-
-
Cement concrete 1:4:8 with brick ballast 40mm gauge
1
-
-
Providing Lowering, jointing and cutting of RCC NP-2 plain end pipes 250mm dia with RCC collars and laying same to correct gradient and alignment and jointing ends and fixing collars with cement mortar 1:2 as per IS 458:2003 in all depths complete in all respect
1
-
-
Providing Lowering, jointing and cutting of RCC NP-2 plain end pipes 300mm dia with RCC collars and laying same to correct gradient and alignment and jointing ends and fixing collars with cement mortar 1:2 as per IS 458:2003 in all depths complete in all respect
1
-
-
Providing Lowering, jointing and cutting of RCC pipes 150 mm dia for vent pipe into Trenches and laying same to correct alignment ( @2.5 metre / No)
1
-
-
Wrought Iron and mild steel ladders, framed grills, grating etc. complete fixed in position in D-tank.
1
-
-
Providing & fixing M.S. foot rests made of 23x25 mm square bar including fixing in manholes complete with cement concrete 1:2:4
1
-
-
Providing and fixing of Alfa Alfa Valve 250mm dia fitted on riser pipe to act as Nakka (D regulators)
1
-
-
Providing and fixing of Alfa Alfa Valve 300mm dia fitted on riser pipe to act as Nakka (D regulators)
1
-
-
Centreing &shuttering for Concerte faces
1
-
-
Providing & Fixing of steel shutter gates assembly in main pipeline complete in all respect (250 mm dia)
1
-
-
Providing & Fixing of steel shutter gates assembly in main pipeline complete in all respect (300 mm dia)
1
-
-
Dismantling of Brick work in Cement
1
-
-
Earthwork excavation in ordinary soil exclusive of compensation of earth, kassi work undressed involving an average horizental throw upto 2 Mtr and an average vertical lift upto 0.5 mtr including breaking of clods
1
-
-
Earthwork undressed with combined lead upto 15 mtr including breaking of clods Item no.(Item no.6.2(b))
1
-
-
Dressing of new earthwork (Item No.6.3(i))
1
-
-
E/work filling in 0.152 mtr layers in foundation including ramming, watering and consolidation under bed
1
-
-
Rehandling of earthwork recently deposited after excavation (Item 6.2(a)-20%)
1
-
-
Dag belling, single kassi stroke with minimjm of 7.5 cm depth (Item no.6.18(a))
1
-
-
Dressing of bed and preparation of sub grade for lining (Item no.19.1)
1
-
-
Providing and laying brick ballast (Item 10.30)
1
-
-
Providing and laying brick bats (Item 10.29)
1
-
-
Supply of RCC shutter with one extra frame
1
-
-
Fixing of R.C.C. Shutter
1
-
-
Providing and laying cement concrete 1:6:12
1
-
-