Water Resources Department Tender

If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.

Water Resources Department - WRD Tender

Works
Civil And Construction
Irrigation Work
Eprocure
Opening Date16 May 2024
Closing Date3 Jun 2024
Tender Amount₹ 60,29,220 
Notes
Download

Costs

  • EMD

    ₹ 1,20,584
  • Document Cost

    ₹ 1,000
  • Tender Fee

    ₹ 5,900

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Extra for carriage of earth/soil beyond 450 m but upto 1 km with hydraulic tractor trolly (pacca)

13027.56

-

-

... More
Extra for carriage of earth/soil beyond 1km but upto 10 km with hydraulic tractor trolly (katcha)

13027.56

-

-

... More
Extra for carriage of earth/soil beyond 1km but upto 10 km with hydraulic tractor trolly (pacca)

13027.56

-

-

... More
Extra for carriage of earth/soil per km beyond 10km lead with hydraulic tractor trolly (katcha)

13027.56

-

-

... More
Extra for carriage of earth/soil per km beyond 10km lead with hydraulic tractor trolly (pacca)

13027.56

-

-

... More
Extra for laying earth as per specification for compaction in 20 Cm. layers and dressing including the cost of rolling and watering as per P.W.D specifications.

2568.51

-

-

... More
Dressing of Earth work ( NEW )

30016.69

-

-

... More
Dressing and preparation of sub grade for side slopes.

369.19

-

-

... More
Laying 1:3 (cement: water)cement slurry with cement @ 2.25 kg per sqmt on prepared bed & side slope before laying concrete

398.46

-

-

... More
Cement concrete lining 75mm thick or less laid mannualy for irrigation channels using cement concrete M-15 with cement contant 325 kg per cum mixed an automatic computerized batching and mixing plant and transported to the site in transit mixers & with an average lead of 1km including supply ,carriage, of loadind and unloading of material complete in all respect (For Trapozoidal Section and Cup Section of all radius) (for bed & Side Slope)

23.02

-

-

... More
Cement concrete lining 75mm thick or less laid mannualy for irrigation channels using cement concrete M-15 with cement contant 325 kg per cum mixed an automatic computerized batching and mixing plant and transported to the site in transit mixers & with an average lead of 1km including supply ,carriage, of loadind and unloading of material complete in all respect (For Trapozoidal Section and Cup Section of all radius) For Coping

2.54

-

-

... More
Cement concrete lining 75mm thick or less laid mannualy for irrigation channels using cement concrete M-15 with cement contant 325 kg per cum mixed an automatic computerized batching and mixing plant and transported to the site in transit mixers & with an average lead of 1km including supply ,carriage, of loadind and unloading of material complete in all respect (For Trapozoidal Section and Cup Section of all radius) For Sleeper

3.89

-

-

... More
Filling of construction/contraction joints sealing compound including supply ,carriage, of material complete in all respect as per design/drawing and PWD specifications

127.2

-

-

... More
Extra for Bitumen Painting @ 0.69 kg per Sqmt. Supply carriage of material complete in all respect

25.43

-

-

... More
Providing & laying 250 micron Polyethene Sheet over sleeper

4.73

-

-

... More
Shuttering for faces of concrete lining on side slopes and bed complete in all respect as per design/drawing and PWD specifications

20.13

-

-

... More
Ordinary jungle clearance of both banks of running Disty. Minors and Drains includind boundary road (Discharge 1.50 - 4.50 cum/s)

4.72

-

-

... More
Earth work of silt clearance of channels and drains:-Kassi (a) work undressed involving an average horizontal throw up to 2 metres and average vertical lift up to 0.5 metres

1506.24

-

-

... More
Basket work with a combined lead upto 7.50 metres undressed.

1506.24

-

-

... More
Dressing for sub-item (a) and (b) supra.

1506.24

-

-

... More
Earth work for lip cutting for lining of irrigation channels including of all allowances lead and dressing (0-1.5 mtr)

83.6

-

-

... More
Earth work for lip cutting for lining of irrigation channels including of all allowances lead and dressing (1.5-3.0 mtr)

23.1

-

-

... More
Excavation in soil (any type) using Hydraulic Excavator CK 90 hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirement of lines, grades and cross sections, including all lifts and combined lead up to 30 m.

63.25

-

-

... More
Excavation in Soil (any type) using Hydraulic Excavator CK 90 and Tippers with Disposal up to 450 metres. Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead up to 450m

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.